What's New 

                     September 2009                           Current                                                     

S.NO

Title

Posted On

1.

Construction of four laned R.O.B. (Hinganghat ROB) including approaches, Underpasses and Service Road at Km.76.380 of Nagpur–Hyderabad Section of NH-7 in lieu of existing level crossing No.14A in the State of Maharashtra Contract Package No.NS-59-A(MH).
Bid Document-I, Bid Document-II, Bid Document-III

30th  November
2009

2.

2-LANING WITH PAVED SHOULDERS OF NAGAPATNAM -THANJAVUR SECTION OF NH-67 KM 1.600 TO KM 80.000 IN THE STATE OF TAMIL NADU UNDER NHDP PHASE-III ON DBFOT (ANNUITY) BASIS
RFQ

30th  November
2009

3.

Two laning of Jhansi - Khajuraho section of NH-75 from km 1.900 to km 165.950 in the State of Madhya Pradesh/ UP under DBFOT (Annuity) Basis.
RFQ

30th  November
2009

4.

“Application for the post of GM (Name of the post) for absorption”. 
Performa Absorption
, Deputation

30th  November
2009

5.

Collection of USER Fee through private contractor on the basis of competitive bidding at Km. 75.00 (Srinagar near Palwal) for Km. 18.80 to Km. 108.90 on Badarpur – Kosi Section of the National Highway No. 02 (hereinafter referred to as the said section of the National Highway).
Bid Document, Schedule, Last date of purchase of Bid Document is 18/12/2009

30th  November
2009

6.

Collection of USER Fee through private contractor on the basis of competitive bidding at Km . 164.50 (Mahuvan) for Km. 108.90 to Km. 199.00 on Kosi – Agra Section of the National Highway No. 02 (hereinafter referred to as the said section of the National Highway).
Bid Document, Schedule, Last date of purchase of Bid Document is 18/12/2009

30th  November
2009
7.

Six laning of Tumkur- Chitradurga section (excluding Tumkur & Chitradurga Bypass ) from km 75.00 to km 189.00 of NH-4 (approx 114.00 km ) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V.
Amendment -I TUM-CHIT

30th  November
2009

8.

Six laning of Belgaum – Dharwad Section of NH-4 km 433.00 to km 515.00 (length – 79.36 km) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V.
LIST TO SHORTLISTED BIDDERS

30th  November
2009

9.

Consultancy Services for Preparation of Feasibility Study Report for Rehabilitation and Upgrading to 4 lane with paved shoulders configuration of Gwalior-Dewas section on NH-3.
Corrigendum, Pre bid quereis

30th  November
2009

10.

UP GRADATION OF MEHRAULI – GURGAON ROAD (ANDHERIA MORE - DELHI/HARYANA BORDER) IN THE NCT OF DELHI.
Addendum-II

30th  November
2009

11.

Four – Laning of Belgaum – Khanapur Section (km 0 + 000 to km 30 + 000) and Two – Laning with paved shoulder of Khanapur-Karnataka /Goa Border Section (km 30+000 to km 84+120) of NH-4A in the State of Karnataka under NHDP Phase –III through Public Private Participation on Design, Build, Finance, Operate and Transfer (DBFOT) Toll basis project.
Amendment - I to RFQ

30th  November
2009

12.

“MAKING TEMPORARY ARRANGMENT FOR TOLL COLLECTION AT KM 18+652 OF NH-7 CONSTRUCTION PACKAGE NS-39/TN – MADURAI TO VIRUDHUNAGAR SECTION(NH-7) OF NORTH – SOUTH CORRIDOR IN THE STATE OF TAMILNADU”.
Vol-I
,Vol-II,Vol-III

28th  November
2009

13.

Invitation of Proposals For Expression of Interest For Independent Engineer for the 4- Laning of NHs in the State of Maharashtra on DBFOT Basis.
Corrigendum-II

28th  November
2009

14.

4-Laning of Parwanoo- Solan Section of NH-22 Under NHDP III in the State of Himachal Pradesh on Design, Build, Finance, operate and transfer (DBFOT) Basis.
Extended Bid Due Date-III

28th  November
2009

15.

Supply, Installation, Commissioning and Maintenance of Toll Collection System.
Extenstion Bid Due Date

27th  November
2009

16.

Independent Engineering Services for 4 laning of Pathankot-Amritsar Section of NH-15 in the State of Punjab on DBFOT basis under NHDP - Phase III.
Invitation, RFP

27th  November
2009

17.

Two-Lane with paved shoulder of Bhopal- Sanchi section of NH 86 Ext from km 0.000 (Misrodh Junction) to km 53.775 in the State of Madhya Pradesh under NHDP PHASE III on BOT (Annuity) on DBFOT Pattern.
RFQ

26th  November
2009

18.

Consultancy Services for Preparation of Feasibility-Cum-Preliminary Design of Phase- II works for Development of Adequate Road Connectivity to Visakhapatnam Port in the State of Andhra Pradesh
RFP Cancelled

26th  November
2009

19.

Two Laning of Mokama-Munger Section of NH – 80 from km 0.00 to km 70.00 in the State of Bihar under NHDP Phase III on DBFOT (Annuity) Basis. 
NIT
, RFQ

26th  November
2009

20.

REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDERS OF ROAD SECTIONS IN THE STATE OF MADHYA PRADESH. 1. Narsinghpur-Amarwara Road (SH 47) 90 km 2. Amarwara-Umranala including bypass for Chindwara (SH 47 &SH 19) 85 km 3. Umranala –Saoner ( SH 19 &SH 250) 70km 4. Multai – Chindwara (SH 26) 92 km 5. Chindwara – Seoni Road Section (SH 26) 69 km
RFQ

26th  November
2009

21.

4/6 laning of Maharashtra/Goa Border to Panaji-Goa/Karnataka Border section of NH-17 in the State of Goa under NHDP Phase-III-Reg RFP.
Corrigendum, Replies to Queries

26th  November
2009
 22.

4-Laning of Rohtak-Panipat Section of NH-71a Under NHDP III in the State of Haryana on Design, Build, Finance, Operate and transfer (DBFOT) Basis.
Clarification

26th  November
2009
 23.

4-Laning of Rohtak-Bawal Section of NH-71 Under NHDP III in the State of Haryana on Design, Build, Finance, Operate and transfer (DBFOT) Basis.
Clarification

26th  November
2009
 24.

Design, Engineering,Finance,Construction, Operation And Maintenance Of Hungund-Hospet Section Of NH-13 From Km 202.000 To Km 299.000 In The State Of Karnataka Under NHDP Phase III On Design, Build,Finance,Operate And Transfer (DBFOT) Toll Basis.
Clarification

25th  November
2009
25.

Design, Engineering,Finance,Construction, Operation And Maintenance Of Hungund-Hospet Section Of NH-13 From Km 202.000 To Km 299.000 In The State Of Karnataka Under NHDP Phase III On Design, Build,Finance,Operate And Transfer (DBFOT) Toll Basis.
Clarification-I , Clarification-II

25th  November
2009

26.

Upgradation, Operation and Maintenance of km.534.720 to km 556.840 of Hyderabad – Bengaluru Section of NH-7 in Karnataka to be executed as BOT (Toll) on Design, Build, Finance, Operate & Transfer (DBFOT) pattern under NHDP Phase-VII.
Clarification

25th  November
2009

27.

Design, Engineering,Finance,Construction, Operation and Maintenance Of Thiruvantpuram-TN/Kerala Border in The State Of Kerala Under NHDP Phase III On Design, Build,Finance,Operate And Transfer (DBFOT) ) Toll Basis.
Clarification

25th  November
2009
28.

2 Laning With Paved Shoulder of Dindigul – Theni Section From Km 2.750 to Km 73.400 of NH-45(Extn.) and Theni – Kumli Section From Km 215.500 to Km 273.600 of NH-220 on Bot (Annuity) Basis in the State of Tamil Nadu Under NHDP Phase III
Addendum

25th  November
2009

29.

CONSULTANCY SERVICES FOR CONSTRUCTION SUPERVISION OF THE CONSTRUCTION & IMPROVEMENT OF MEHRAULI [ANDHERIA MORE] TO GURGAON ROAD IN THE STATE OF DELHI.
Addendum

25th  November
2009

30.

UP GRADATION OF MEHRAULI – GURGAON ROAD (ANDHERIA MORE - DELHI/HARYANA BORDER) IN THE NCT OF DELHI.
RFQ

25th  November
2009

31.

Four laning of Bhuvneshwar-Puri of NH 203 Km. 0.00 to Km.59.00 (Length–59.00 Km.) in the State of Orissa under NHDP Phase III on DBFO pattern.
NIT, RFQ

24th  November
2009

32.

Design, Engineering,Finance,Construction, Operation And Maintenance Of Hungund-Hospet Section Of NH-13 From Km 202.000 To Km 299.000 In The State Of Karnataka Under NHDP Phase III On Design, Build,Finance,Operate And Transfer (DBFOT) Toll Basis.
Clarification

24th  November
2009
 33.

Design, Engineering,Finance,Construction, Operation And Maintenance Of Bijapur- Hungund Section Of Nh-13 From Km 102.000 To Km 202.000 In The State Of Karnataka Under NHDP Phase III On Design, Build,Finance,Operate And Transfer (DBFOT) ) Toll Basis .
Clarification

24th  November
2009

 34.

Upgradation, Operation and Maintenance of km.534.720 to km 556.840 of Hyderabad – Bengaluru Section of NH-7 in Karnataka to be executed as BOT (Toll) on Design, Build, Finance, Operate & Transfer (DBFOT) pattern under NHDP Phase-VII.
Clarification

24th  November
2009

35.

Design, Engineering,Finance,Construction, Operation and Maintenance Of Thiruvantpuram-TN/Kerala Border in The State Of Kerala Under NHDP Phase III On Design, Build,Finance,Operate And Transfer (DBFOT) ) Toll Basis.
Clarification

24th  November
2009

36.

Supply, Installation, Commissioning and Maintenance of Toll Collection System.
Corrigendum-II

24th  November
2009
37.

“Design, Engineering, Construction, Development, Finance, Operation and Maintenance Two Laning of Shillong Bypass Section of NH –40 & NH-44 from Km 61.800 of NH-40 to Km 34.850 of NH-44 in the State of Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis”.
Clarification No.2

24th  November
2009
38.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance Four Laning of Jorbat – Shillong (Barapani) Section of NH –40 from km 0.000 to Km. 61.800 of NH- 40 in the State of Assam and Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis.
Clarification No.2

24th  November
2009

39.

Four Laning of Chhapra-Hazipur Section of NH-19 in the State of Bihar under NHDP Phase III on DBFOT (Annuity) Basis.
NIT, RFQ

24th  November
2009

40.

Two Laning of Gopalganj-Chhapra Section of NH - 19 (From Km 0.000 To Km 94.700) in the State of Bihar under NHDP Phase III on DBFOT (Annuity) Basis.
NIT, RFQ

24th  November
2009

41.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Indore to Gujarat-MP Border Section of NH- 59 (Km 9.500 to Km. 171.100) in the State of Madhya Pradesh under NHDP Phase III on Design, Build , Finance, Operate and Transfer (DBFOT) basis.
Corrigendum IV

23rd  November
2009
42.

4-Laning of Rohtak-Bawal Section of NH-71 Under NHDP III in the State of Haryana on Design, Build, Finance, Operate and transfer (DBFOT) Basis.
Addendum-III

21st  November
2009
43.

4-Laning of Rohtak-Panipat Section of NH-71a Under NHDP III in the State of Haryana on Design, Build, Finance, Operate and transfer (DBFOT) Basis.
Addendum-II  

21st  November
2009
44.

Four Laning of Chhapra-Hazipur Section of NH-19 in the State of Bihar under NHDP Phase III on DBFOT (Annuity) Basis. GUJRAT ON DBFOT BASIS UNDER NHDP PHASE - III.
NIT, RFQ

21st  November
2009
45.

Two/Four Laning of Khagaria-Purnia Section of NH-31 (From Km 270.00 to Km 410.00) in the State of Bihar on Design, Build, Finance, Operate And Transfer on Bot (Annuity) Basis.
NIT, RFQ

21st  November
2009
46.

2-laning with paved shoulder of Madurai-Ramanathapuram-Rameshwaram-Dhanushkodi section of NH-49 from Km 5.000 to Km 190.55 on BOT (Annuity) basis in the state of Tamil Nadu under NHDP Phase III.
Cover Page, RFQ

21st  November
2009
47.

Invitation For Proposals(International Competitive Bidding)For 2 Laning of Muzaffarpur-Sonbarsa Section of NH-77 in the State of Bihar on DBFOT (Annuity) Basis Under NHDP III.
NIT, RFQ

21st  November
2009
48.

Invitation For Proposals(International Competitive Bidding)For 2 Laning of Muzaffarpur-Sonbarsa Section of NH-77 in the State of Bihar on DBFOT (Annuity) Basis Under NHDP III.
NIT, RFQ

21st  November
2009
49.

Two/Four Laning of Khagaria-Purnia Section of NH-31 (From Km 270.00 to Km 410.00) in the State of Bihar on Design, Build, Finance, Operate And Transfer on Bot (Annuity) Basis.
NIT, RFQ

21st  November
2009
50.

Six laning from km 102.035 to km 144.680 on the Chengapalli to start of Coimbatore Bypass section of NH-.47 and Four laning from km 170.880 to km 183.010 on end of Coimbatore Bypass to Tamil nadu/Kerala Border section of NH-47 in the State of Tamil Nadu .
Addendum-III

21st  November
2009
51.

INVITATION OF OFFERS FOR OFFICE ACCOMODATION.
NIT, Bid Document

21st  November
2009
52.

Invitation of Proposals for Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgrading to 2 lane with paved shoulders configuration for the Selected packages in the state of Chhattisgarh.
Amendment-II

21st  November
2009
53.

Four Laning of Raipur-Bilaspur of National Highway -200 in the State of Chhattisgarh (Approximately Length 112 Km).
Amendment

21st  November
2009
54.

4- LANING OF MUZAFFARNAGAR- HARIDWAR SECTION OF NH-58 FROM KM 131.00 TO KM 211.00 OF NH-58 IN THE STATE OF UP AND UTTARAKHAND.
Addendum-V

20th  November
2009
55.

Four Laning of Moradabad-Bareilly section of NH-24 from km 148.00 to km 262.00 in the State of Uttar Pradesh on DBFOT basis under NHDP III .
Addendum-III

20th  November
2009
56.

4-laning of Bareilly-Sitapur section of NH-24 under NHDP III in the State of Uttar Pradesh on Design, Build, Finance, Operate and Transfer (DBFOT) basis .
Addendum-V, Letter

20th  November
2009
57.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Indore to Gujarat-MP Border Section of NH- 59 (Km 9.500 to Km. 171.100) in the State of Madhya Pradesh under NHDP Phase III on Design, Build , Finance, Operate and Transfer (DBFOT) basis.
Extension Bid due date-II , Addendum

20th  November
2009
58.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Indore to Gujarat-MP Border Section of NH- 59 (Km 9.500 to Km. 171.100) in the State of Madhya Pradesh under NHDP Phase III on Design, Build , Finance, Operate and Transfer (DBFOT) basis.
Extension Bid due date-II

20th  November
2009
59.

Invitation of Quotation for the work of Hiring of Commercial Registered Vehicles at Katoghan Toll Plaza (km 120.500 on NH-2) (1 no.), Lalanagar Toll Plaza (Km 279.120 on NH-2) (1 no.) and Naini Bridge Toll Plaza (on NH-27) (1 no.) under ths of PIU.
NIQ, BOQ

20th  November
2009
60.

Maintenance and Repair of damaged surface of NH-34 from KM 165.00 to Km 230.00 in the state of West Bengal CONTRACT PACKAGE NO : Krish / MR-II / 09-10
Corrigendum

20th  November
2009
61.

Design, Engineering, Finance, Construction, Operation And Maintenance Of 4 Laning Of Knt/Kl Border – Kannur Section Of NH – 17 In The State Of Kerala Under NHDP Phase III.
Addendum in RFQ

19th  November
2009
62.

Four-laning of Ghoshpukur-Gossainpur-Falakata-Salsalabari section of NH-31, 31D & 31C (from km 551-566of NH-31, km 0.000-147 of NH-31D & km225-228of NH-31C) in the State of West Bengal under NHDP Phase-II on BOT(Annuity) on DBFOT Pattern.
NIT, RFQ

19th  November
2009
63.

Four-laning of Panvel – Indapur section of NH – 17 from km 0.000 to km 84.000 in the State of Maharashtra to be executed as BOT (TOLL) on DBFO Pattern under NHDP Phase –III .
NIT, RFQ

19th  November
2009
64.

INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE 4- LANING AND 2-LANING WITH PAVED SHOULDER IN SELECTED STRETCHES OF NHs IN THE STATE OF RAJASTHAN AND GUJRAT ON DBFOT BASIS UNDER NHDP PHASE - III.
EOI

19th  November
2009
65.

Six laning of Ahmedabad to Vadodara section of NH 8 from km. 6.400 to km. 108.700 (Length 102.300 km.) in the State of Gujarat and improvement of Existing Ahmedabad Vadodara Expressway from km. 0.000 to km. 93.302 in the State of Gujarat (Length 93.302 km.) under NHDP Phase V on Design Build Finance Operate Transfer (DBFOT) Toll basis.
NIT, RFQ

18th  November
2009
66.

Re-bidding proposal for Appointment of Internal Auditor in NHAI - Proposal for NHAI-HQ/ Zone IV.
RFP

18th  November
2009
67.

4/6 laning of Maharashtra/Goa Border to Panaji-Goa/Karnataka Border section of NH-17 in the State of Goa under NHDP Phase-III-Reg RFP.
RFP, Addendum

18th  November
2009
68.

Six laning of Pune - Satara Section of NH-4 From KM 725.00 To KM 865.35 (Length – Km 140.35) in the State of Maharashtra to be executed as BOT (TOLL) on DBFO Pattern under NHDP Phase V as BOT (Toll) on DBFO Pattern: Shortlisting of eligible applicants .
Clarification , Extension-IV

18th  November
2009
69.

Design, Engineering,Finance,Construction, Operation And Maintenance Of Hungund-Hospet Section Of NH-13 From Km 202.000 To Km 299.000 In The State Of Karnataka Under NHDP Phase III On Design, Build,Finance,Operate And Transfer (DBFOT) Toll Basis.
Amendment to RFP Hungund

18th  November
2009
70.

Design, Engineering,Finance,Construction, Operation And Maintenance Of Bijapur- Hungund Section Of Nh-13 From Km 102.000 To Km 202.000 In The State Of Karnataka Under NHDP Phase III On Design, Build,Finance,Operate And Transfer (DBFOT) ) Toll Basis .
Amendment to RFP Bijapur

18th  November
2009
71.

Upgradation, Operation and Maintenance of km.534.720 to km 556.840 of Hyderabad – Bengaluru Section of NH-7 in Karnataka to be executed as BOT (Toll) on Design, Build, Finance, Operate & Transfer (DBFOT) pattern under NHDP Phase-VII.
Amendment-IIto RFP Hyderabad

18th  November
2009
72.

Request for Proposal for Selection of a Financial consultant for preparation of Medium-to-Long term Resource –cum-Credit Plan and assist in initially preparing a credit strategy for NHAI consistent with NHDP mandate AND directly assisting NHAI in raising resources over next five years. 
RFP-Clarifications
, AmendmentsToRFP

17th  November
2009
73.

Construction of four laned R.O.B. (Hinganghat ROB) including approaches, underpasses and service road at Km.76.380 of Nagpur–Hyderabad section of NH-7 in lieu of existing level crossing No.14A in the State of Maharashtra.
IFB, Vol-I-Section-II, Vol-I-Section-III, Cover Page

17th  November
2009
74.

Request for Proposal for remodeling of the Model Concession Agreement for Performance Contracting for highway projects on Public Private Partnership mode.
Corrigendum-II

17th  November
2009
75.

INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE 4- LANING OF NHs IN THE STATE OF KARNATAKA ON DBFOT BASIS UNDER NHDP PHASE - III
EOI, NIT

16th  November
2009
76.

Four laning of Sambalpur – Baragarh – Chattisgarh/Orissa Border Section of NH 6 Km. 0.00 to Km. 88.00 (Length – 88.00 Km.) in the State of Orissa under NHDP Phase III on DBFO pattern.
Addendum

16th  November
2009
77.

Six-Laning of Barwa Adda –Panagarh Section of NH-2 From Km 398/000 to 520/000 Including Panagarh Bypass in the States of Jharkhand & West Bengal Under NHDP Phase V on Bot(Toll) on Dbfot Pattern.
RFP

16th  November
2009
78.

Consultancy Services for Feasibility study and Preparation of Detailed Project Report for widening/six laning/up gradation of existing four lanned section of Narmada bridge & its approaches from Km. 192.00 to 198.00 on Ahmedabad-Mumbai Section of NH-8 and value addition works to Vadodara to Bharuch & Bharuch to Surat Section of NH-8.
RFP

16th  November
2009
79.

TWO/FOUR LANING OF BAKHTIYARPUR–KHAGARIA SECTION OF NH - 31 (FROM KM 153.300 TO KM 273.450) IN THE STATE OF BIHAR UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER ON BOT (ANNUITY)BASIS.
Addendum

16th  November
2009
80.

Two/Four Laning of Patna – Buxar Stretch of NH - 30 (From Km 181.300 To Km 117.000) & of NH - 84 (From 0.000 To Km 75.000) in the State of Bihar Under NHDP Phase III on Bot (Toll) Basis.
Addendum

16th  November
2009
81.

Four Laning of Chenani to Nashri Section of NH-1A from Km 89.00 to 130.00 (new alignment) of NH-1A including 9 Km long tunnel (2 lane) with parallel escape tunnel in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/V/J&K)”.
Volume-I, RFP

16th  November
2009
82.

Four Laning of Chenani to Nashri Section of NH-1A from Km 89.00 to 130.00 (new alignment) of NH-1A including 9 Km long tunnel (2 lane) with parallel escape tunnel in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/V/J&K)”.
Bid Dcoument, RFP

16th  November
2009
83.

Rehabilitation, Strengthening and Four Laning of Udhampur to Ramban Section of NH-1A, from Km 67.00 to Km 89.00 and Km 130.00 to Km 151.00 on BOT (Annuity) basis on DBFO Pattern, in the State of Jammu & Kashmir (Pkg No:- NHDP-Phase-II/BOT/IV/J&K) Project
Bid Dcoument, RFP

16th  November
2009
84.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Quazigund - Banihal Section from Km 189.350 to Km 204.700 including two tunnels (2 Lane) of 0.69 kms and 8.45 kms of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/II/J&K)”Project on BOT (Annuity) basis.
Volume-I, RFP

16th  November
2009
85.

Four/Six laning of Gandhidham (Kandla) – Mundra Port section of NH-8A (Extension) (approx. length 71.400 km) in the State of Gujarat under NHDP Phase III
Addendum-III

16th  November
2009
86.

Four Laning of Godhra to Gujarat/Madhya Pradesh Border Section of NH- 59 from Km 129.300 to Km. 215.900 in the State of Gujarat under NHDP Phase III on Design, Build, Finance, Operate and Transfer (DBFOT) basis.
Addendum-II

16th  November
2009
87.

Six laning of Samakhiali - Gandhidham section of NH-8A (total length of 56.16 km) to be executed as BOT (TOLL) on DBFO Pattern under NHDP Phase V. 
Addendum-II

16th  November
2009
88.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Ahmedabad to Godhra Section of NH- 59 (Km 4.200 to Km. 122.420) in the State of Gujarat on Design, Build, Finance, Operate and Transfer (DBFOT) basis under NHDP Phase III.
Addendum-II

16th  November
2009
89.

4-Laning of Rohtak-Bawal Section of NH-71 Under NHDP III in the State of Haryana on Design, Build, Finance, Operate and transfer (DBFOT) Basis.
  Addendum-I, Extended Bide Due Date-IV

16th  November
2009
90.

4-Laning of Rohtak-Panipat Section of NH-71a Under NHDP III in the State of Haryana on Design, Build, Finance, Operate and transfer (DBFOT) Basis. 
Addendum
, Extension of Bid due date-VI

16th  November
2009
91.

Supply, installation & maintenance of CCTV system at 4th km. (Srirampur Toll Plaza near Chandikhole) for Chandikhole – Paradip Section from km.0.000 to km.77.000 of NH-5A .
NIT Bid Document, BOQ

16th  November
2009
92.

Short Term Improvement & Routine Maintenance of Makhanpur-Sikandra Section of NH-2 from km. 250.533 to km. 393.000 in the State of Uttar Pradesh.
Volume -1, Attachment to Volume II, Summary of Volume -II, Volume II

16th  November
2009
93.

Maintenance and Repair of damaged surface of NH-34 from KM 31.00 to Km 165.00 in the state of West Bengal CONTRACT PACKAGE NO : Krish / MR-I / 09-10 
Vol-I
, Vol-II, Cover Page

13th  November
2009
94.

Maintenance and Repair of damaged surface of NH-34 from KM 165.00 to Km 230.00 in the state of West Bengal CONTRACT PACKAGE NO : Krish / MR-II / 09-10.
Vol-I, Vol-II, Cover Page

13th  November
2009
95.

Six laning from km 102.035 to km 144.680 on the Chengapalli to start of Coimbatore Bypass section of NH-.47 and Four laning from km 170.880 to km 183.010 on end of Coimbatore Bypass to Tamil nadu/Kerala Border section of NH-47 in the State of Tamil Nadu .
Addendum

12th  November
2009
96.

Four-laning of Haridwar-Dehradun section of NH-58&72 from km 212.500 to 218.200 of NH-58 and from km 156.000 to 196.800 of NH-72 in the States of Uttrakhand
Addendum-II

12th  November
2009
97.

Four-laning of Haridwar-Dehradun section of NH-58&72 from km 212.500 to 218.200 of NH-58 and from km 156.000 to 196.800 of NH-72 in the States of Uttrakhand
Addendum-II

12th  November
2009
98.

4- LANING OF MUZAFFARNAGAR- HARIDWAR SECTION OF NH-58 FROM KM 131.00 TO KM 211.00 OF NH-58 IN THE STATE OF UP AND UTTARAKHAND.
Addendum

12th  November
2009
99.

4- LANING OF MUZAFFARNAGAR- HARIDWAR SECTION OF NH-58 FROM KM 131.00 TO KM 211.00 OF NH-58 IN THE STATE OF UP AND UTTARAKHAND.
Addendum

12th  November
2009
100.

Four Laning of Bahrampore - Farakka section of NH-34 from Km. 193.000 to Km. 295.000 in the state of West Bengal (Package No.NHDP-III/BOT/WB/03).
Corrigendum & Addendum No.4

12th  November
2009
101.

Four Laning of Bahrampore - Farakka section of NH-34 from Km. 193.000 to Km. 295.000 in the state of West Bengal (Package No.NHDP-III/BOT/WB/03).
Corrigendum & Addendum No.4

12th  November
2009
102.

Four Laning of Krishnagar to Bahrampore section of NH-34 from Km. 115.000 to Km. 193.000 in the state of West Bengal (Package No.NHDP-III/BOT/WB/02).
Corrigendum & Addendum No.2

12th  November
2009
103.

Four Laning of Farakka - Raiganj section of NH-34 from Km. 295.000 to Km. 398.000 in the state of West Bengal (Package No.NHDP-III/BOT/WB/04).
Corrigendum & Addendum No.4

12th  November
2009
104.

Four Laning of Raiganj - Dalkhola section of NH-34 from Km. 398.000 to Km. 452.7000 in the state of West Bengal (Package No.NHDP-III/BOT/WB/05).
Corrigendum & Addendum No.4

12th  November
2009
105.

Four Laning of Moradabad-Bareilly section of NH-24 from km 148.00 to km 262.00 in the State of Uttar Pradesh on DBFOT basis under NHDP III .
Addendum

12th  November
2009
106.

4-laning of Bareilly-Sitapur section of NH-24 under NHDP III in the State of Uttar Pradesh on Design, Build, Finance, Operate and Transfer (DBFOT) basis .
Addendum

12th  November
2009
107.

Four-laning of Haridwar-Dehradun section of NH-58&72 from km 212.500 to 218.200 of NH-58 and from km 156.000 to 196.800 of NH-72 in the States of Uttrakhand
Addendum-II

12th  November
2009
108.

Maintenance of road stretch between Km. 353.00 to Km. 354.00 of NH-2 at temporary toll plaza Anantram, District Aurraiya (U.P.)(2nd Call).
NIT, Bid Document, Cover Page

12th  November
2009
109.

Maintenance and Repair of damaged surface of NH-34 from KM 234.00 to Km 302.00 in the state of West Bengal CONTRACT PACKAGE NO : Krish / MR-III / 09-10.
Vol-I, Vol-II, Cover Page

12th  November
2009
110.

Improvement of existing 2 lane section of Ranchi (112/400) – Rargaon (198/000) 2 lane with paved shoulder with eventual four laninng and section of Rargaon (198/100) – Jamshedpur (277/500) to 4 lane section of NH-33 in the State of Jharkhand Under – NHDP Phase-III. on BOT(Toll) Basis.
Addendum to RFP

12th  November
2009
111.

Appointment of PAs (On Deputation) in the Authority
Appointment

11th  November
2009
112.

Supply & Fixing of Display Boards on National Highways under PIU (EW), Udaipur in the State of Rajasthan.
Cancellation

11th  November
2009
113.

Four/Six laning of Gandhidham (Kandla) – Mundra Port section of NH-8A (Extension) (approx. length 71.400 km) in the State of Gujarat under NHDP Phase III
  Extension bid due date-III

11th  November
2009
114.

Four Laning of Godhra to Gujarat/Madhya Pradesh Border Section of NH- 59 from Km 129.300 to Km. 215.900 in the State of Gujarat under NHDP Phase III on Design, Build, Finance, Operate and Transfer (DBFOT) basis. 
Extended Bid Due Date-II

11th  November
2009
115.

Six laning of Samakhiali - Gandhidham section of NH-8A (total length of 56.16 km) to be executed as BOT (TOLL) on DBFO Pattern under NHDP Phase V. 
Extension Bid Date-IV

11th  November
2009
116.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Ahmedabad to Godhra Section of NH- 59 (Km 4.200 to Km. 122.420) in the State of Gujarat on Design, Build, Finance, Operate and Transfer (DBFOT) basis under NHDP Phase III.
  Extended Bid Due Date

11th  November
2009
117.

Day to Day Maintenance of Horticulture Work from Agra to Etawah of NH-2 from Km. 323.473 to Km. 396.133 (Package 1C) for three months (2nd Call).
Bid Document, Notice, Instrcutions to Bidders, Form of Agreement, General Conditions, Special Conditions, Bill of Quantities, Terms & Conditions, Seperators, Table Contents

10th  November
2009
118.

Six laning of Tumkur- Chitradurga section (excluding Tumkur & Chitradurga Bypass ) from km 75.00 to km 189.00 of NH-4 (approx 114.00 km ) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V.
Letters to Short Listed Bidders, List of Short Listed Bidders

10th  November
2009
119.

UP GRADATION OF MEHRAULI – GURGAON ROAD (ANDHERIA MORE - DELHI/HARYANA BORDER) IN THE NCT OF DELHI.
Pre Qualification Document

10th  November
2009
120.

Repair & Maintenance of damaged surface of NH-34 in West Bengal from Km. 31.00 to Km. 302.00
NIT, Corrigendum

10th  November
2009
121.

SHORT TERM IMPROVEMENT AND ROUTINE MAINTENANCE OF CHANDIKHOLE – PARADIP SECTION FROM KM. 0.000 TO KM.76.580 ON NH-5A IN THE STATE OF ORISSA.
Bid Document, BOQ

10th  November
2009
122.

4-Laning of Rohtak-Panipat Section of NH-71a Under NHDP III in the State of Haryana on Design, Build, Finance, Operate and transfer (DBFOT) Basis.
Extension of Bid due date-V

9th  November
2009
123.

Consultancy Services For Supervision of Short Tem Improvement, Routine Maintenance And Round The Clock Toll Plaza Supervision of Agra-Gwalior Section in Km 8.00 to Km 103.60 (Excluding Km 51.00 To Km 61.00) of NH-3
Corrigendum

9th  November
2009
124.

CONSULTANCY SERVICES FOR SUPERVISION OF IMPROVEMENT OF RIDING QUALITY OF RAJKOT-BAMANBORE SECTION OF NH-8B IN KM.185/0 TO KM.216/600 IN THE STATE OF GUJARAT.
Corrigendum

9th  November
2009
125.

Six laning of Belgaum – Dharwad Section of NH-4 km 433.00 to km 515.00 (length – 79.36 km) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V.
LETTER TO SHORTLISTED BIDDERS, LIST TO SHORTLISTED BIDDERS,

9th  November
2009
126.

Ordinary repair works to Manali Oil Refinery Road from Km. 0/000 to Km. 5/600 and Northern segment of Inner Ring Road from Km. 17/500 to Km. 25/600.
Vol-I, Vol-II

9th  November
2009
127.

Four Laning and Strengthening of Existing 2-Lanes of Tirunelveli – Tuticorin Road From Km. 4+300 to Km.51+200 of NH-7A in Tamilnadu - Balance Work.
Extension of Bid due date

9th  November
2009
128.

4-laning of Bareilly-Sitapur section of NH-24 under NHDP III in the State of Uttar Pradesh on Design, Build, Finance, Operate and Transfer (DBFOT) basis .
Extension of RFP Bid Due Date-IV

9th  November
2009
129.

Supply & Fixing of Display Boards on selected locations between Km 220 to Km 113 of NH-76 and Km 278 to Km 388/180 of NH-8 within the jurisdiction of PIU, Udaipur (GQ) in the State of Rajasthan.
Cancellation

7th  November
2009
130.

Invitation of Proposals For Expression of Interest For Independent Engineer for the 4- Laning of NHs in the State of Maharashtra on DBFOT Basis.
Corrigendum

6th  November
2009
131.

Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgrading to two lanes with paved shoulders configuration of 
1. Lucknow-Sultanpur-Varanasi section of NH-56 in the State of Uttar Pradesh. 
2. India/Nepal border - Varanasi section of NH-233 in the State of Uttar Pradesh.
Modified RFP

6th  November
2009
132.

Four Laning of Moradabad-Bareilly section of NH-24 from km 148.00 to km 262.00 in the State of Uttar Pradesh on DBFOT basis under NHDP III .
Extension due Date-III

6th  November
2009
133.

Four – Laning of Belgaum – Khanapur Section (km 0 + 000 to km 30 + 000) and Two – Laning with paved shoulder of Khanapur-Karnataka /Goa Border Section (km 30+000 to km 84+120) of NH-4A in the State of Karnataka under NHDP Phase –III through Public Private Participation on Design, Build, Finance, Operate and Transfer (DBFOT) Toll basis project.
RFQ

6th  November
2009
134.

4-laning of Hyderabad-Yadgiri section of NH-202 from existing km 18.600 to km 53.000 in the State of Andhra Pradesh (package no. NHDP-III/BOT/AP/04) 
Corrigendum-VI

6th  November
2009
135.

Invitation of Offers for Office Accomodation.
Bid Document

6th  November
2009
136.

Supply and Fixing of Display Boards on Projects of National Highways Authority of India on National Highway No.5a From Chandikhole to Paradip (Km.0.000 To Km. 76.580) in the State of Orissa.
Cancellation

6th  November
2009
137.

Supply and Fixing of Display Boards on Projects of National Highways Authority of India on National Highway No.5 From Balasore to Bhadrak (Km.80.994 to Km. 143.635) in the State of Orissa.
Cancellation

6th  November
2009
138.

Supply and Fixing of Display Boards on Projects of National Highways Authority of India on National Highway No.5 From Bhadrak To Sunakhala (Km.143.635 To Km. 363.464) in the State of Orissa.
Cancellation

6th  November
2009
139.

Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of 1. Lucknow-Sultanpur-Varanasi section of NH-56 under NHDP-IVB in the State of Uttar Pradesh 2. India/Nepal border - Varanasi section of NH-233 under NHDP-IVB in the State of Uttar Pradesh 
Cover Page
, Corrigendum-I, Modified RFP , Extended Bid Due Date

5th  November
2009
140.

Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of NH stretches under NHDP-IVB.
Corrigendum, Cover page, Modified RFP

5th  November
2009
141.

Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of NH stretches under NHDP-IVB.
Modified RFP, Corrigendum

5th  November
2009
142.

Quotations for plantation of flowering and ornamental plants at NHAI Corporate Office building, Dwarka, New Delhi.
Quotation

5th  November
2009
143.

Two laning with paved shoulder of Trichy - Chidambaram from Km. 0.000 to Km. 135.400 of NH-227 in the state of Tamil Nadu under NHDP Phase-IV on DBFOT (Toll). .
Cover Page , RFQ

5th  November
2009
144.

Invitation of Proposals For Expression of Interest For Independent Engineer For the Work of 6-Laning of Krishnagiri to Walahjpet Section of NH-46 From Km.0.00 to Km 148.300 in the State of Tamil Nadu to be Executed As Bot (Toll) on DBFO Pattern Under NHDP Phase-V..
EOI

5th  November
2009
145.

Four Laning of Raipur-Bilaspur of National Highway -200 in the State of Chhattisgarh (Approximately Length 112 Km).
Clarification  

5th  November
2009
146.

Invitation of Proposals for Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgrading to 2 lane with paved shoulders configuration for the Selected packages in the state of Chhattisgarh.
Clarification

5th  November
2009
147.

Four Laning of Godhra to Gujarat/Madhya Pradesh Border Section of NH- 59 from Km 129.300 to Km. 215.900 in the State of Gujarat under NHDP Phase III on Design, Build, Finance, Operate and Transfer (DBFOT) basis.
Addendum, Pre Bid Replies, Drwaing

5th  November
2009
148.

Four Laning of Bahrampore - Farakka section of NH-34 from Km. 193.000 to Km. 295.000 in the state of West Bengal (Package No.NHDP-III/BOT/WB/03).
Extended Bid Due Date-III

5th  November
2009
149.

Four Laning of Krishnagar to Bahrampore section of NH-34 from Km. 115.000 to Km. 193.000 in the state of West Bengal (Package No.NHDP-III/BOT/WB/02). 
Extended Bid Due Date-III

5th  November
2009
150.

Four Laning of Farakka - Raiganj section of NH-34 from Km. 295.000 to Km. 398.000 in the state of West Bengal (Package No.NHDP-III/BOT/WB/04).
  Extended Bid Due Date-III

5th  November
2009
151.

Repair works due to flood damage works on NH 67 from km 332/600 to km 384/000,Coimbatore - Mettupalayam Section in the State of Tamil Nadu.(Contract No. 04/2009-10)
Vol-I, Vol-II

5th  November
2009
152.

National Highways Authority of India (NHAI) invites applications from the officers of Central / State Government Departments / Organizations / Autonomous Bodies/Public Sector Undertakings for appointment on deputation basis / direct recruitment through lateral entry to the following posts
Advertisement

5th  November
2009
153.

Supply & Fixing of Display Boards on selected locations between Km 220 to Km 113 of NH-76 and Km 278 to Km 388/180 of NH-8 within the jurisdiction of PIU, Udaipur (GQ) in the State of Rajasthan.
Corrigendum

5th  November
2009
154.

National Highways Authority of India (NHAI) invites applications from the officers of Central / State Government Departments / Organizations / Autonomous Bodies/Public Sector Undertakings for appointment on deputation basis to the following posts
Recruitment

4th  November
2009
155.

National Highways Authority of India (NHAI) invites applications from the officers of Central / State Government Departments / Organizations / Autonomous Bodies/Public Sector Undertakings for appointment on deputation basis to the following posts
Recruitment

4th  November
2009
156.

TWO/FOUR LANING OF BAKHTIYARPUR–KHAGARIA SECTION OF NH - 31 (FROM KM 153.300 TO KM 273.450) IN THE STATE OF BIHAR UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER ON BOT (ANNUITY)BASIS..
RFQ, NIT

4th  November
2009
157.

Four-laning of Haridwar-Dehradun section of NH-58&72 from km 212.500 to 218.200 of NH-58 and from km 156.000 to 196.800 of NH-72 in the States of Uttrakhand .
Extended Bid Due Date, Addendum

4th  November
2009
158.

Supply & fixing of retro reflective board on NH 37, NH 36 and NH 54.
NIT

4th  November
2009
159.

2/4 laning of Reengus Sikar Section of NH-11 to be executed as BOT(TOLL) Project on DBFOT pattern under Phase III in the State of Rajasthan.
Notice, RFQ

4th  November
2009
160.

Two laning with paved shoulder of Vikkaravandi to Thanjhavur section from Km. 0.000 to Km. 165.000 of NH-45C in the state of Tamil Nadu under NHDP Phase-IV on DBFOT (Toll).
Cover Page, RFQ

4th  November
2009
161.

Supply & Fixing of Display Boards on National Highways under PIU (EW), Udaipur in the State of Rajasthan.
Notice, Display Board

4th  November
2009
162.

CONSULTANCY SERVICES FOR CONSTRUCTION SUPERVISION OF THE CONSTRUCTION & IMPROVEMENT OF MEHRAULI [ANDHERIA MORE] TO GURGAON ROAD IN THE STATE OF DELHI.
RFP

4th  November
2009
163.

Upgradation, Operation and Maintenance of km.534.720 to km 556.840 of Hyderabad – Bengaluru Section of NH-7 in Karnataka to be executed as BOT (Toll) on Design, Build, Finance, Operate & Transfer (DBFOT) pattern under NHDP Phase-VII.
NIT, Bid Document, Cover Page

3rd  November
2009
164.

Supply and Fixing of Display Boards on Projects of National Highways Authority of India on National Highway No.5 From Balasore to Bhadrak (Km.80.994 to Km. 143.635) in the State of Orissa.
Bid Document

3rd  November
2009
165.

Supply and Fixing of Display Boards on Projects of National Highways Authority of India on National Highway No.5a From Chandikhole to Paradip (Km.0.000 To Km. 76.580) in the State of Orissa.
Bid Document

3rd  November
2009
166.

Supply & Fixing of Display Boards on selected locations between Km 220 to Km 113 of NH-76 and Km 278 to Km 388/180 of NH-8 within the jurisdiction of PIU, Udaipur (GQ) in the State of Rajasthan.
Bid Document

3rd  November
2009
167.

Four Laning and Strengthening of Existing 2-Lanes of Tirunelveli – Tuticorin Road From Km. 4+300 to Km.51+200 of NH-7A in Tamilnadu - Balance Work.
Addendum, Reply to Prebid Querries

3rd  November
2009
168.

Six laning of Kishangarh - Udaipur section of NH- 79A, 79 & 76 from km. 364.00 of NH-8 to km 113.800 of NH-76 (length –315.00 km.) in the State of Rajasthan on BOT (Toll) following by DBFO Pattern under NHDP Phase-V: Submission of RFP.
Extension Notice-5

3rd  November
2009
169.

Manufacturing, Supply & Fixing of Display Boards on NHAI Roads in THANJAVUR PIU in the State of Tamil Nadu (Contract No. PIU/Thanj/Display Board /2009-10).
NIT , Corrigendum

3rd  November
2009
170.

Supply, installation, Commission-ing and Maintenance of Computers and Peripherals including Thermal Printers for Aganampudi User Fee Plaza at Km 728.050 on NH-5 of Visakhapatnam District in Andhra Pradesh.
NIT , Bid Document

3rd  November
2009
171.

Manufacturing, Supply & Fixing of Display Boards on NHAI Roads under Karur PIU in the State of Tamil Nadu (Contract No. Display Board/01/2009-10).
Corrigendum

3rd  November
2009
You need Acrobat Reader to view pdf documents.