What's New 

                     January 2009                           Current                                                      February 2010

S.NO

Title

Posted On

1.

Four laning of Bhubaneswar – Puri Section from km 0.00 to km 59.00 of NH-203 in the State of Orissa to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase III Project
Corrigendum

31st March
2010

2.

EXPRESSION OF INTEREST FOR PRE-QUALIFICATION OF AGENCIES FOR PROVIDING CATERING SERVICES & RUNNING OF GUEST HOUSE AT NHAI, NEW DELHI.
Corrigendum

31st March
2010

3.

Independent Engineer for Operation and Maintenance of Four laned stretches of National Highways to be executed on OMT Basis.
Bid Document

31st March
2010

4.

Consultancy Services for Preparation of Feasibility-Cum- Detailed Project Report of Phase- II works for Development of Adequate Road Connectivity to Visakhapatnam Port in the State of Andhra Pradesh.
RFP

30th March
2010

5.

Providing Barbed wire fencing from Km 1.600 to 7.538 of Ennore Expressway.
Tender Notice, Volume - I, Volume - II, Drawing

30th March
2010

6.

SUPPLY, INSTALLATION & MAINTENANCE OF CCTV SYSTEMS AT 4TH KM.(SRIRAMPUR TOLL PLAZA NEAR CHANDIKHOLE) FOR CHANDIKHOLE – PARADIP SECTION FROM KM.0.000 TO KM.77.000 SECTION OF NH- 5A.
Bid Document

27th March
2010

7.

Supply, Installation, Commissioning and Maintenance of Computers, Printers, Servers, UPS & Peripherals at Srirampur Toll Plaza at 4th Km. on Chandikhole – Paradip Section of NH – 5A in the State of Orissa.
Bid Document

27th March
2010

8.

EMPANELMENT OF USER FEE AUDITOR AT SRIRAMPUR TOLL PLAZA AT 4TH KM OF NH- 5A (CHANDIKHOL-PARADIP STRETCH) IN THE STATE OF ORISSA ON NH-5A.
Tender Document

27th March
2010

9.

6- Laning of Chandikhole – Jagatpur – Bhubaneshwar Section from Km 413.000 to km 418.00 and from km 0.000 to km 62.000 of NH-5 in the State of Orissa to be executed as BOT (Toll) project on DBFO Pattern under NHDP Phase V – RFP regarding
Amendment

26th  March
2010

10.

REQUEST FOR PROPOSAL FOR EMPANELMENT OF USER FEE AUDITOR at Km. 964.350 (Tanuku) and at Km. 865.553 (Krishnavaram) District West Godavari and East Godavari in the State of Andhra Pradesh
Corrigendum

26th  March
2010

11.

RFP for Four-Laning of Devihalli – Hassan Section from km 110.000 to km 189.500 of NH-48 including a new 2-lane with Paved Shoulder Bypass for Channarayanapatna Town and widening of existing Hassan Bypass to 2-lane with Paved Shoulder on DBFOT basis in the State of Karnataka under NHDP Phase IIIA.
Cover Page-I, Reply to Pre Bid Queries, Addendum-I

26th  March
2010

12.

Four laning of Numaligarh (NH 39 junction) to Jorhat from Km 403.200 to Km 454.365 of NH - 37 in the State of Assam under Special Accelerated Road Development Programme in North Eastern Region (SARDP-NE) on Design, Built, Finance, Operation and Transfer on BOT(Annuity) basis (Package No. SARDP-NE/BOT/ASM/04).
RFP, Pre Bid Meeting

25th  March
2010

13.

Toll Supervisor & Assistant Toll Supervisor at Km 250.700, 310.200 & 376.075 in the stretch of Hyderabad to Bangalore Section on NH-7 in the State of Andhra Pradesh.
Corrigendum

25th  March
2010

14.

REQUEST FOR PROPOSAL FOR EMPANELMENT OF USER FEE AUDITOR at Km. 964.350 (Tanuku) and at Km. 865.553 (Krishnavaram) District West Godavari and East Godavari in the State of Andhra Pradesh
Corrigendum

25th  March
2010

15.

6- Laning of Chandikhole – Jagatpur – Bhubaneshwar Section from Km 413.000 to km 418.00 and from km 0.000 to km 62.000 of NH-5 in the State of Orissa to be executed as BOT (Toll) project on DBFO Pattern under NHDP Phase V – RFP regarding
Amendment

25th  March
2010

16.

Leasing of Computer systems and supply of I.T. Manpower for operation and maintenance of Computer systems & peripherals at Toll Plaza TP-14 (Khandi obari) on NH-8.
Corrigendum

25th  March
2010

17.

Four Laning of Up/Haryana Border-Yamunanagar-Saha-Barwala-Panchkula Section of NH-73 From Km 71.640 to Km 179.249 in the State of Haryana Under NHDP Phase III on Design, Build, Finance, Operate And Transfer (The “DBFOT”) Basis.
Clarifications to Amendment-I to RFP

25th  March
2010

18.

Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of Kolhapur – Sangli – Sholapur – Latur – Nanded – Wardha – Nagpur section of NH-7 & SH-6 in the state of Maharashtra.
Extend Due Date-V

25th  March
2010

19.

Invitation of RFP for Two -Laning of Gopalganj-Chhapra section of NH-85 from km 0.00 to km 94.70 in the State of Bihar under NHDP Phase-III on BOT (Toll) Basis.
Addendum-II I

22nd  March
2010

20.

Four laning of Deoli-Kota Section of NH-12 from km. 165.000 to junction of NH-76 on Kota Bypass (Approx. length 83.04 km) in the State of Rajasthan on BOT (Toll) project on DBFOT pattern under NHDP Phase – III.
Additional Clarification to the bidder

22nd  March
2010

21.

Four Laning of Beawar - Pali section of NH-14 from Km 0+000 to Km 115+000 (Approx. Length 115 Km) in the State of Rajasthan on BOT (Toll) project on DBFO Pattern under NHDP Phase III.
Extension of Bid due date

22nd  March
2010

22.

Four Laning of Pali - Pindwara section of NH-14 from Km 115.000 to Km 244.120 (Approx. Length 129.12 Km) in the State of Rajasthan on BOT (Toll) project on DBFO Pattern under NHDP Phase III.
Extension of Bid due date

22nd  March
2010

23.

PROVIDING SERVICES OF TECHNICAL MANPOWER VIZ NETWORK/ SYSTEM ADMINISTRATOR (09Nos) AND DESKTOP ADMINISTRATOR (9 Nos) TO MAINTAINCOMPUTER HARDWARE,NETWORKING, CABLING & UPS etc. AT PROPOSED TOLL PLAZAS AT Km.1344.450 (SUNNAMBATTI), 1263.800 (TANGUTUR) & 1199.800 (BOLLAPALLI) ON NH-5 IN THE STATE OF ANDHRA PRADESH.
NIT

22nd  March
2010

24.

Four Laning of Karnataka/Kerala Border - Kannur Section of NH-17 under NHDP Phase-III in the state of Kerala on DBFOT(Toll) Basis.
RFP, Letter

22nd  March
2010

25.

Balance Wok and Improvement of HPL Link Road : Auction of Scrap Reinforcement and Structural Steel Obtained from Dismantled Bridges / Culverts Lying in front of PIU Building At 11th km. of NH-41 Road Project in West Bengal.
NIT, Bid Document

22nd  March
2010

26.

Rehabilitation, Strengthening and Four Laning of Srinagar to Banihal Section from Km 187.000 to Km 189.350 (Banihal Bypass) and Km 220.700 to Km 286.110 of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/I/J&K)”Project.
Addendum-III, Corrigendum-V

22nd  March
2010

27.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Quazigund - Banihal Section from Km 189.350 to Km 204.700 including two tunnels (2 Lane) of 0.69 kms and 8.45 kms of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/II/J&K)”Project on BOT (Annuity) basis.
Addendum-III, Corrigendum-V

22nd  March
2010

28.

Rehabilitation, Strengthening and Four Laning of Jammu to Udhampur Section from Km 15.000 (Jammu Bypass) to Km 67.000 of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/VI/J&K)”Project.
Addendum-III, Corrigendum-V

22nd  March
2010

29.

Four Laning of Chenani to Nashri Section of NH-1A from Km 89.00 to 130.00 (new alignment) of NH-1A including 9 Km long tunnel (2 lane) with parallel escape tunnel in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/V/J&K)”.
Addendum-III, Corrigendum-V

22nd  March
2010

30.

Independent Engineer services for four laning of Hazaribagh- Ranchi section of NH-33 from Km 40.500 to km 114.000 in the State of Jharkhand on DBFOT Basis under NHDP-Phase-III
Pre Bid Clarification

22nd  March
2010

31.

REQUEST FOR PROPOSAL FOR EMPANELMENT OF USER FEE AUDITOR at Km. 964.350 (Tanuku) and at Km. 865.553 (Krishnavaram) District West Godavari and East Godavari in the State of Andhra Pradesh
NIT, Bid Document-I, Bid Document-II

22nd  March
2010

32.

Comprehensive operation and maintenance of electrical works on JNPT Road Package-I & II – reg.
Letter, Bid Document

22nd  March
2010

33.

Six laning of Belgaum – Dharwad Section of NH-4 km 433.00 to km 515.00 (length – 79.36 km) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V.
Amendment-V to RFP

22nd  March
2010

34.

Six laning of Tumkur- Chitradurga section (excluding Tumkur & Chitradurga Bypass ) from km 75.00 to km 189.00 of NH-4 (approx 114.00 km ) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V.
Amendment V and Extension of Bid Due Date-V 

22nd  March
2010

35.

6- Laning of Chandikhole – Jagatpur – Bhubaneshwar Section from Km 413.000 to km 418.00 and from km 0.000 to km 62.000 of NH-5 in the State of Orissa to be executed as BOT (Toll) project on DBFO Pattern under NHDP Phase V – RFP regarding
DCA  

22nd  March
2010

36.

RFP for Six Laning of Dhankuni to Baleshwar Section of NH-6 from Km 17.600 to Km 129.000 in the State of West Bengal and improvement of existing four lane of NH-60 from Km 0.000 to Km 119.300 in the State of Orissa under NHDP Phase – V on Design, Build, Finance, Operate And Transfer (DBFOT) Toll Basis.
Corrigendum/Addendum-I , Corrigendum/Addendum-II, Minutes of Pre-bid, Reply of prebid Queries  

22nd  March
2010

37.

Work for Engagement of system Administrators / Desktop engineers for Maintenance at the toll plazas on – JNPT Road Package – I.
Bid Document  

19th  March
2010

38.

CONSTRUCTION OF SERVICE ROAD FROM RUIDHASA TO KHAGRA INCLUDING ONE MINOR BRIDGE AT KM 472 AT KISHANGANJ IN THE STATE OF BIHAR.
Bid Document-I, Bid Document-II, Bid Document-III, BOQ  

19th  March
2010

39.

CONSTRUCTION OF BALANCE WORK OF NEW FOUR LANE AGRA BYPASS IN THE STATE OF UTTAR PRADESH.
Vol-I, Vol-II, Vol-III  

19th  March
2010

40.

RFP for Six Laning of Varanasi - Aurangabad Section of NH-2 from km 786.000 to km 978.400 (Length – 192.400 Km) in the State of Uttar Pradesh and Bihar under NHDP Phase V to be executed as DBFOT (Toll) Project.
Addendum / Corrigendum No.4  

18th  March
2010

41.

Six laning of Delhi-Agra Section of NH-2 from km 20.500 to 200.00 on DBFOT (Toll) basis under NHDP V in the State of Haryana & Uttar Pradesh.
CORRIGENDUM  

18th  March
2010

42.

RFP for Four Laning of Patna to Bakhtiyarpur section of NH 30 from Km 181.300 to Km 231.950 in the State of Bihar on BOT (Toll) project on DBFO pattern under NHDP Phase III Project.
Addendum-II  

18th  March
2010

43.

Consultancy Services for Preparation of Feasibility for 6/8 Laning of NH 4B, Amra Marg and NH-4 on boundaries of proposed Navi Mumbai International Airport in the State of Maharashtra to be Executed as BOT (Toll) Project on DBFOT Pattern.
RFP  

18th  March
2010

44.

Six laning of Delhi-Agra Section of NH-2 from km 20.500 to 200.00 on DBFOT (Toll) basis under NHDP V in the State of Haryana & Uttar Pradesh.
Addendum-V  

18th  March
2010

45.

4 laning of Demow - Bogibil Junction from km 535.250 (Design km 534.800) to km 581.700 (Design km 580.778) of NH - 37 in the State of Assam under Special Accelerated Road Development Programme in North Eastern Region (SARDP-NE) on Design, Built, Finance, Operation and Transfer on Annuity (“BOT Annuity”) basis.
NIT , RFQ  

18th  March
2010

46.

Leasing of Computer systems and supply of I.T. Manpower for operation and maintenance of Computer systems & peripherals at Toll Plaza TP-14 (Khandi obari) on NH-8.
Bid Document  

17th  March
2010

47.

User Fee Audit for Toll operations For Fee Plaza at Kali Nadi Bridge in Km 60 on NH-24 in the state of Uttar Pradesh.
Corrigendum  

17th  March
2010

48.

Consultancy Services for Preparation of Feasibility for 4-Laning of Indapur - Zarap Section of NH-17 in the State of Maharashtra to be Executed as BOT (Toll) Project on DBFOT Pattern.
RFP

17th  March
2010

49.

Improvement of Dhaula Kuan ( km 11 ) to RTR ( km 13.700) section of NH-8 in Delhi.
Corrigendum

17th  March
2010

50.

Six laning of Delhi-Agra Section of NH-2 from km 20.500 to 200.00 on DBFOT (Toll) basis under NHDP V in the State of Haryana & Uttar Pradesh.
Letter-III, Addendum-III, Addendum-IV

17th  March
2010

51.

Four laning of Coimbatore - Mettupalayam section of NH-67 Extn. on BOT(Toll).
Letter

17th  March
2010

52.

RFP for Four Laning of Patna to Bakhtiyarpur section of NH 30 from Km 181.300 to Km 231.950 in the State of Bihar on BOT (Toll) project on DBFO pattern under NHDP Phase III Project.
Addendum

17th  March
2010

53.

Consultancy Services for Feasibility and Preparation of Detailed Project Report for flyovers at four junctions on NH-47, Cochin at Edapally, Palarivattom , Vytilla and Kundanoor Junctions.
Corrigendum

16th  March
2010

54.

RFP for Four-laning of Chhapra-Hazipur section of NH-19 from (km 143. 200 to km 207.200) in the State of Bihar under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis” Project. 
Letter-II
, Annexure-I, Annexure-II, Schedule-II

16th  March
2010

55.

RFP for Development of Eastern Peripheral Expressway (National Highway No. NE-II) from km 0.00 to km 135.00 (starting from Km 36.083 on NH – I and ending at Km 64.330 on NH – 2) in the states of Haryana and Uttar Pradesh to be executed as BOT (Toll) project on DBFOT Pattern.
Addendum-IV

16th  March
2010

56.

Four Laning of Up/Haryana Border-Yamunanagar-Saha-Barwala-Panchkula Section of NH-73 From Km 71.640 to Km 179.285 in the State of Haryana Under NHDP Phase III on Design, Build, Finance, Operate And Transfer (The “DBFOT”) Basis.
Extended Due Date-II

16th  March
2010

57.

Two laning with paved shoulders of Muzaffarpur-Sonbarsa section of NH-77 from km 0.00 to km 89.00 in the State of Bihar under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis”Project.
Addendum

16th  March
2010

58.

Four/Two Laning of Panikoili - Rimuli Section from Km 00.00 to km 163.00 of NH-215 in the State of Orissa to be executed as BOT (Toll) project on DBFOT Pattern under NHDP Phase III – Invitation to the pre-qualified Applicant for RFP- reg.
Corrigendum/Addendum-3

16th  March
2010

59.

4/6 laning of Maharashtra/Goa Border to Panaji-Goa/Karnataka Border section of NH-17 in the State of Goa under NHDP Phase-III-Reg RFP.
Extension of Bid Due Date - IV

13rd  March
2010

60.

Four laning of Deoli-Kota Section of NH-12 from km. 165.000 to junction of NH-76 on Kota Bypass (Approx. length 83.04 km) in the State of Rajasthan on BOT (Toll) project on DBFOT pattern under NHDP Phase – III.
Addendum-II, Geo Technical Investigation Report, Alignment plan and vertical profile

13rd  March
2010

61.

Four laning of Deoli-Kota Section of NH-12 from km. 165.000 to junction of NH-76 on Kota Bypass (Approx. length 83.04 km) in the State of Rajasthan on BOT (Toll) project on DBFOT pattern under NHDP Phase – III.
Addendum-II

13rd  March
2010

62.

Engagement of round the clock supervisors at the toll plaza Sikandra in Km 399 of NH-2.
Cancellation

13rd  March
2010

63.

Rehabilitation and Up-gradation to 2 lane with paved shoulders of Multai – Chhindwara – Seoni section of NH 69A and Narsinghpur - Amarawara – Chhindwara – Saoner section of NH 26B, in Madhya Pradesh and Maharashtra including construction of Ring Road and connecting roads in Chhindwara Town
Revised RFQ

12th  March
2010

64.

Projects Work Plan I(2009-10) & II(2010-2011)
Work Plan I(2009-10), Work Plan II(2010-2011)

12th  March
2010

65.

Hiring of vehicles on day-to-day basis and on monthly basis.
NIT, Corrigendum

12th  March
2010

66.

Providing, fixing and installation of 10 KVA Generator for office use.
Corrigendum

11th  March
2010

67.

Two laning with paved shoulders of Muzaffarpur-Sonbarsa section of NH-77 from km 0.00 to km 89.00 in the State of Bihar under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis”Project.
Addendum, Amendment-V

11th  March
2010

68.

2 Laning of Rohtak Hissar section from km 87.000 to km 170.00 of NH-10 to be executed as BOT(Toll) Project on DBFO Pattern under NHDP Phase III in the State of Haryana.
Extended Due Date-II

11th  March
2010

69.

CONSULTANCY SERVICES FOR SUPERVISION OF OPERATION AND ROUTINE MAINTENANCE CONTRACT OF NHAI CORPORATE OFFICE BUILDING AT DWARKA,NEW DELHI.
RFP

11th  March
2010

70.

FOR DEVELOPMENT AND MAINTENANCE OF BILL TRACKING SYSTEM
Bid Document

11th  March
2010

71.

Two laning with paved shoulders of Muzaffarpur-Sonbarsa section of NH-77 from km 0.00 to km 89.00 in the State of Bihar under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis”Project.
Addendum

11th  March
2010

72.

DESIGN, ENGINEERING, CONSTRUCTION, DEVELOPMENT, FINANCE, OPERATION AND MAINTENANCE OF BARASAT TO KRISHNAGAR SECTION OF NH- 34 (KM 31.000 TO KM. 115.000) IN THE STATE OF WEST BENGAL UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS.
Amendment-IV

11th  March
2010

73.

Supply, Installation, Testing and Commissioning of 25 Mtr High Mast light at proposed Toll Plaza in Km 121.975 of NH-24 in the state of Uttar Pradesh.
NIT, Cover page

11th  March
2010

74.

RFP for two laning with paved shoulders of Mokama Munger section of NH-80 from km 1.430 to km 70.00 in the State of Bihar under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis” Project.
RFP , Addendum

11th  March
2010

75.

PROVIDING GUARDING SERVICES IN NHAI HEADQUARTERS, DWARKA.
Advertisement , Financial , Technical

10th  March
2010

76.

Short term improvement and routine maintenance of Nellore - Chilakaluripet Section from km. 1366.547 to km. 1183.027 of NH-5 in the State of Andhra Pradesh. 
Vol-I
, Vol-II, BOQ

10th  March
2010

77.

Short term improvement and routine maintenance of Ghaziabad-Hapur Section from Km. 27.643 to km 48.638 and Hapur bypass (km. 48.638 to km 60) of NH – 24 in the State of Uttar Pradesh.
  Vol-I, Vol-II, BOQ

10th  March
2010

78.

Invitation of RFP for Two/Four-laning of Bakhtiyarpur-Khagaria section of NH-31 from km 153.300 to km 273.450 in the State of Bihar under NHDP Phase-III on BOT (Toll) Basis
Addendum

10th  March
2010

79.

Result of Interview held on 22,23,24&25 Feb 2010 for recruitment of Manager(Tech) on deputation basis in NHAI
Result

10th  March
2010

80.

EXPRESSION OF INTEREST FOR PRE-QUALIFICATION OF AGENCIES FOR PROVIDING CATERING SERVICES & RUNNING OF GUEST HOUSE AT NHAI, NEW DELHI.
Bid Document

10th  March
2010

81.

Four/Two Laning of Chandikhole-Dubari-Talcher Section of NH 200 from Km 301.890 to km 428.030 in the State of Orissa to be executed as BOT (Toll) project on DBFOT Pattern under NHDP Phase III – Invitation to the pre-qualified Applicants for RFP- reg.
Letter-II, Coorigendum-II, Replies to Pre-bid Queries

10th  March
2010

82.

RFP for Four Laning of Patna to Bakhtiyarpur section of NH 30 from Km 181.300 to Km 231.950 in the State of Bihar on BOT (Toll) project on DBFO pattern under NHDP Phase III Project.
Addendum

9th  March
2010

83.

Invitation of RFP for Two -Laning of Gopalganj-Chhapra section of NH-85 from km 0.00 to km 94.70 in the State of Bihar under NHDP Phase-III on BOT (Toll) Basis.
Addendum

9th  March
2010

84.

RFP for Six Laning of Varanasi - Aurangabad Section of NH-2 from km 786.000 to km 978.400 (Length – 192.400 Km) in the State of Uttar Pradesh and Bihar under NHDP Phase V to be executed as DBFOT (Toll) Project.
Prebid Clarifications & Amendment

9th  March
2010

85.

Four/Two Laning of Panikoili - Rimuli Section from Km 00.00 to km 163.00 of NH-215 in the State of Orissa to be executed as BOT (Toll) project on DBFOT Pattern under NHDP Phase III – Invitation to the pre-qualified Applicant for RFP- reg.
  Coorigendum

9th  March
2010

86.

RFP for Four/Two Laning of Rimuli-Roxy-Rajamunda Section of NH 215 from km 163.00 to km 269.00 (design chainage Km 163.00 to Km 259.453) in the State of Orissa to be executed as BOT (Toll) Project on DBFOT Pattern under NHDP Phase III Project
Letter-II, Coorigendum, Letter

9th  March
2010

87.

Providing, fixing and installation 6 computers and 4 printers for office use.
Bid Document

9th  March
2010

88.

Four laning of Deoli-Kota Section of NH-12 from km. 165.000 to junction of NH-76 on Kota Bypass (Approx. length 83.04 km) in the State of Rajasthan on BOT (Toll) project on DBFOT pattern under NHDP Phase – III.
Addendum

9th  March
2010

89.

Four Laning of Pali - Pindwara section of NH-14 from Km 115.000 to Km 244.120 (Approx. Length 129.12 Km) in the State of Rajasthan on BOT (Toll) project on DBFO Pattern under NHDP Phase III.
Addendum

9th  March
2010

90.

Four Laning of Beawar - Pali section of NH-14 from Km 0+000 to Km 115+000 (Approx. Length 115 Km) in the State of Rajasthan on BOT (Toll) project on DBFO Pattern under NHDP Phase III.
Addendum

9th  March
2010

91.

Four laning of Bhubaneswar – Puri Section from km 0.00 to km 59.00 of NH-203 in the State of Orissa to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase III Project
RFP, Letter

9th  March
2010

92.

Construction of Canopy at Srirampur Toll Plaza at 4th Km. on Chandikhole – Paradip Section of NH – 5A in the State of Orissa.
Bid Document, Drawing

9th  March
2010

93.

Invitation of RFP for Two/Four-laning of Purnea-Khagaria section of NH-31 from km 270.00 to km 410.00 in the State of Bihar under NHDP Phase-III on BOT (Toll) Basis
Pre Bid Meeting

9th  March
2010

94.

RFP for Four Laning of Patna to Bakhtiyarpur section of NH 30 from Km 181.300 to Km 231.950 in the State of Bihar on BOT (Toll) project on DBFO pattern under NHDP Phase III Project.
Pre Bid Meeting

9th  March
2010

95.

Rehabilitation and Upgrading of existing intermediate lane roads to 2 lane with paved shoulders of Forbesganj – Jogbani (km 0.000 to km 9.258) on NH-57A in the state of Bihar under NHDP Phase – III on DBFOT Annuity basis Project.
Pre Bid Meeting

9th  March
2010

96.

Two Laning of Piprakothi – Raxaul Section of NH – 28A (From km 0.600 to km 62.064) and construction of 2- Lane Link Road from km 62.064 to ICP Raxaul (7.33 km length) in the state of Bihar under NHDP phase III on Design, Build, Finance, Operate and Transfer on BOT (Toll) basis.
Pre Bid Meeting

9th  March
2010

97.

Toll Supervisor & Assistant Toll Supervisor at Km 250.700, 310.200 & 376.075 in the stretch of Hyderabad to Bangalore Section on NH-7 in the State of Andhra Pradesh.
Bid Document-II

9th  March
2010

98.

Marking of centerline alignment using total station from Km.0.000 to Km.84.124 of Belgaum – Goa / Karnataka Border of NH-4A in the State of Karnataka.
Amendment

9th  March
2010

99.

Four laning of Sambalpur – Baragarh –Orissa/Chattisgarh Border Section from km 0.00 to km 88.00 of NH-6 in the State of Orissa to be executed as BOT(Toll) project on DBFOT pattern on DBFOT pattern under NHDP Phase III –invitation to the pre-qualified Applicant for RFP.
Letter, RFP

9th  March
2010

100.

CONSULTANCY SERVICES FOR SUPERVISION OF SHORT TERM IMPROVEMENT AND ROUTINE MAINTENANCE CONTRACT OF 1. VANIYAMBADI to WALAJAPET From Km. 50.112 TO Km. 148.201 of NH-46 AND FROM WALJAPET TO CHENNAI FROM Km. 13.8 to 107.2 OF NH-4 IN THE STATE OF TAMIL NADU 2. BARWA ADDA (KM. 398.750) TO PANAGARH (KM. 515.236) IN THE STATE OF WEST BENGAL AND JHARKHAND OF NH-2. 3. DANKUNI-KOLAGHAT-KHARAGPUR SECTION (KM. 17.60 TO KM. 136.00) OF NH-6 AND DANKUNI-PALSIT SECTION (KM. 647.368 TO KM. 645.546) OF NH-2 IN THE STATE OF WEST BENGAL
RFP FOR THREE PKG, Annexure 6, Annexure- V _A, Annexure- V (B), Annexure- V _C

9th  March
2010

101.

Rehabilitation and Up-gradation to 2 lane with paved shoulders of Multai – Chhindwara – Seoni section of NH 69A and Narsinghpur - Amarawara – Chhindwara – Saoner section of NH 26B, in Madhya Pradesh and Maharashtra including construction of Ring Road and connecting roads in Chhindwara Town
Corrigendum

9th  March
2010

102.

Four Laning of Up/Haryana Border-Yamunanagar-Saha-Barwala-Panchkula Section of NH-73 From Km 71.640 to Km 179.285 in the State of Haryana Under NHDP Phase III on Design, Build, Finance, Operate And Transfer (The “DBFOT”) Basis.
Addendum-II

8th  March
2010

103.

Supply & Erection of Prefabricated portable cabins at proposed Toll Plaza in Km 121.975 of NH-24 in the state of Uttar Pradesh.
Drawings

8th  March
2010

104.

PROVIDING SERVICES OF TECHNICAL MANPOWER VIZ NETWORK/ SYSTEM ADMINISTRATOR (03 Nos) AND DESKTOP ADMINISTRATOR (03Nos) TO MAINTAIN COMPUTER HARDWARE, NETWORKING, CABLING & UPS etc. AT PROPOSED FEE PLAZAS AT Km.18+652(KAPPALUR) ON NH-7 IN THE STATE OF TAMILNADU.
Vol-I, Vol-II

8th  March
2010

105.

PROPOSAL FOR EMPANELMENT OF USER FEE AUDITOR FOR USER FEE PLAZA AT KM.74+930(ETTURVATTAM) OF VIRUDHUNAGAR TO KOVILPATTI SECTION ON NH-7 IN THE STATE OF TAMILNADU.
Vol-I, Vol-II

8th  March
2010

106.

Providing services of Technical manpower viz Network/ System Administrator and Desktop Administrator to maintain computer hardware, networking, cabling & ups etc. for the Raksha Toll Plaza at Raksha village in District Jhansi U.P. at km 85 of NH-25
NIT, Bid Document

8th  March
2010

107.

Supply, Installation, Commissioning and Maintenance of Computers & Peripherals at Raksha Toll Plaza, Km. 85.00 of NH – 25 at Jhansi district in the state of Uttar Pradesh.
NIT, Bid Document

8th  March
2010

108.

DESIGN, ENGINEERING, CONSTRUCTION, DEVELOPMENT, FINANCE, OPERATION AND MAINTENANCE OF BARASAT TO KRISHNAGAR SECTION OF NH- 34 (KM 31.000 TO KM. 115.000) IN THE STATE OF WEST BENGAL UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS.
Amendment-I

8th  March
2010

109.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Quazigund - Banihal Section from Km 189.350 to Km 204.700 including two tunnels (2 Lane) of 0.69 kms and 8.45 kms of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/II/J&K)”Project on BOT (Annuity) basis. Corrigendum-IV

8th  March
2010

110.

Four Laning of Chenani to Nashri Section of NH-1A from Km 89.00 to 130.00 (new alignment) of NH-1A including 9 Km long tunnel (2 lane) with parallel escape tunnel in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/V/J&K)”. Corrigendum-IV

8th  March
2010

111.

Rehabilitation, Strengthening and Four Laning of Jammu to Udhampur Section from Km 15.000 (Jammu Bypass) to Km 67.000 of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/VI/J&K)”Project. Corrigendum-IV

8th  March
2010

112.

Rehabilitation, Strengthening and Four Laning of Ramban to Banihal Section of NH-1A, from Km 151.000 to Km 187.000 on BOT (Annuity) basis on DBFO pattern in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/I/J&K)”Project. Corrigendum-IV

8th  March
2010

113.

Rehabilitation, Strengthening and Four Laning of Udhampur to Ramban Section of NH-1A, from Km 67.00 to Km 89.00 and Km 130.00 to Km 151.00 on BOT (Annuity) basis on DBFO Pattern, in the State of Jammu & Kashmir (Pkg No:- NHDP-Phase-II/BOT/IV/J&K) Project Corrigendum-IV

8th  March
2010

114.

Rehabilitation, Strengthening and Four Laning of Srinagar to Banihal Section from Km 187.000 to Km 189.350 (Banihal Bypass) and Km 220.700 to Km 286.110 of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/I/J&K)”Project. Corrigendum-IV

8th  March
2010

115.

Two-laning of Trichy-Karaikudi including Trichy bypass road Section of NH-210 (km 10.00 to km 94.00) and bypass (Km 109.558 to Km 135.930) in the State of Tamil Nadu under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis. 
Letter

8th  March
2010

116.

Two-laning with paved shoulder of Dindigul-Theni section km 2.750 to km 73.400 of NH-45 (Extn) and Theni-Kumili Section from km 215.500 to km 273.600 of NH-220 in the State of Tamil Nadu under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis.
Letter

8th  March
2010

117.

Application for the post of DGM (Tech) on Deputation basis
Interview date postponed 

6th  March
2010

118.

Providing, Running & Maintenance of Non-AC vehicle for DGR agency and Generators at Kali Nadi Brideg Toll Plaza in Km 60.00 on NH-24 in the state of Uttar Pradesh.
NIT

6th  March
2010

119.

Supervision of Toll Operation Kali Nadi Toll Plaza in km 60 on NH-24 in Ghaziabad District in the State of Uttar Pradesh.
NIT, Bid Document

6th  March
2010

120.

Supply & Erection of Prefabricated portable cabins at proposed Toll Plaza in Km 121.975 of NH-24 in the state of Uttar Pradesh.
NIT, Bid Document

6th  March
2010

121.

"Providing and Maintaining of Computer Hardware on Hire Basis at Kali Nadi Toll Plaza in km 60 on NH-24 in Ghaziabad District in State of Uttar Pradesh"
NIT, Bid Document, Cover page

6th  March
2010

122.

User Fee Audit for Toll operations For Fee Plaza at Kali Nadi Bridge in Km 60 on NH-24 in the state of Uttar Pradesh.
NIT, Bid Document

6th  March
2010

123.

Toll Supervisor & Assistant Toll Supervisor at Km 250.700, 310.200 & 376.075 in the stretch of Hyderabad to Bangalore Section on NH-7 in the State of Andhra Pradesh.
Bid Document

5th  March
2010

124.

Four Laning of Ranchi Rargaon Jamshedpur section from km 114.000 to km 277.500 of NH-33 in the state of Jharkhand Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis under NHDP phase-III Project
RFP

5th  March
2010

125.

INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR 6- LANING OF STRETCHES OF NATIONAL HIGHWAYS AND UPGRADATION OF NATIONAL HIGHWAYS IN THE STATE OF KARNATAKA UNDER NHDP PHASE – V & VII TO BE EXECUTED AS BOT PROJECT ON DBFO BASIS
NIT, EOI

5th  March
2010

126.

HOUSE-KEEPING SERVICES AT NHAI CORPORATE OFFICE (FINANCIAL BID)(2nd CALL).
Financial 
HOUSE-KEEPING SERVICES AT NHAI CORPORATE OFFICE(TECHNICAL BID) (2nd CALL)
Technical

5th  March
2010

127.

Marking of centerline alignment using total station from Km.0.000 to Km.84.124 of Belgaum – Goa / Karnataka Border of NH-4A in the State of Karnataka.
Bid Document

5th  March
2010

128.

Providing, fixing and installation of 10 KVA Generator for office use.
Notice

5th  March
2010

129.

Six laning of NH-7 from Hosur (km 33.130) to Krishnagiri(km 93.000) approx. length 59.870 km in the State of Tamil Nadu under NHDP Phase-V.
Letter

5th  March
2010

130.

Four Laning of Tirupati - Tiruthani - Chennai Section of NH-205 from km 274.800 to km 341.600 in the State of Andhra Pradesh and km 0.00 to km 59.600 in the State of Tamil Nadu under NHDP Phase III A on BOT Basis.
Letter

5th  March
2010

131.

Independent Engineer services for 4/6 laning of Ghaziabad-Aligarh Section of NH-91 from km 23.600 to km 140.200 in the state of Uttar Pradesh on DBFOT basis under NHDP-Phase III on DBFOT Basis under NHDP-Phase-III
RFP

4th  March
2010

132.

NHAI INVITES QUOTATION FOR PRINTING OF BROCHURES OF THE FOLLOWING SPECIFICATION
Advertisement Addendum

4th  March
2010

133.

6- Laning of Chandikhole – Jagatpur – Bhubaneshwar Section from Km 413.000 to km 418.00 and from km 0.000 to km 62.000 of NH-5 in the State of Orissa to be executed as BOT (Toll) project on DBFO Pattern under NHDP Phase V – RFP regarding .
Letter
, RFP

4th  March
2010

134.

Rehabilitation and Up-gradation to 2 lane with paved shoulders of Multai – Chhindwara – Seoni section of NH 69A and Narsinghpur - Amarawara – Chhindwara – Saoner section of NH 26B, in Madhya Pradesh and Maharashtra including construction of Ring Road and connecting roads in Chhindwara Town
clarification

4th  March
2010

135.

INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE 6- LANING OF NHs IN THE STATE OF GUJARAT ON DBFOT BASIS.
EOI

4th  March
2010

136.

Quotation for Ambulance of tow way vehicle schedule.
Bid Document

4th  March
2010

137.

Routine Maintenance of Road & Road property and Incident Management for the Chittorgarh Bypass (Km. 159.00 of NH-79 to Km. 213.00 of NH-76) in the State of Rajasthan.
NIT, Vol-I, Vol-II

3rd  March
2010

138.

RFP for Four Laning of Barhi Hazaribagh Section from km 0.00 to km 40.500 of NH-33 in the State of Jharkhand on Design, Built, Finance, Operate and Transfer (DBFOT) Toll basis under NHDP Phase III Project
Letter, RFP

3rd  March
2010

139.

Flood Damage Repairs for Chennai – Tiruttani section of NH-205 from Km.0/000 – Km.45/200 in the State of Tamil Nadu.
Vol-I, Vol-II

3rd  March
2010

140.

Six laning of Chilakaluripeta - Nellore Section of NH-5 from km 1182.802 to km 1366.547 (appr. length-184.545 km) in the State of Andhra Pradesh under NHDP Phase V to be executed as BOT (Toll) Project on DBFO Pattern
RFP

3rd  March
2010

141.

DESIGN, ENGINEERING, CONSTRUCTION, DEVELOPMENT, FINANCE, OPERATION AND MAINTENANCE OF BARASAT TO KRISHNAGAR SECTION OF NH- 34 (KM 31.000 TO KM. 115.000) IN THE STATE OF WEST BENGAL UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS.
Amendment

3rd  March
2010

142.

Engagement of User fee Auditor at toll plaza Sikandra in Km 399 of NH-2.
NIT, Bid Document, Bid Document

3rd  March
2010

143.

Engagement of User fee Auditor at toll plaza Purwameer in km 506.262 of NH-2.
NIT, Bid Document, Bid Document

3rd  March
2010

144.

Four Laning of Up/Haryana Border-Yamunanagar-Saha-Barwala-Panchkula Section of NH-73 From Km 71.640 to Km 179.285 in the State of Haryana Under NHDP Phase III on Design, Build, Finance, Operate And Transfer (The “DBFOT”) Basis.
Extended Due Date , Replies to prebid queries , Addendum-I

2nd  March
2010

145.

2/4 Laning Of Ambala Kaithal Section From Km 5.00 To Km 77.80 Of NH-65 To Be Executed As BOT (Toll) Project On DBFO Pattern Under NHDP Phase III In The State Of Haryana.
Extended Due Date-VI

2nd  March
2010

146.

Rehabilitation, Strengthening and Four Laning of Jammu to Udhampur Section from Km 15.000 (Jammu Bypass) to Km 67.000 of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/VI/J&K)”Project.
Addendum-III

2nd  March
2010

147.

NHAI INVITES QUOTATION FOR PRINTING OF BROCHURES OF THE FOLLOWING SPECIFICATION

2nd  March
2010

148.

Improvement of Dhaula Kuan ( km 11 ) to RTR ( km 13.700) section of NH-8 in Delhi.
Vol-I, Vol-II, BOQ

2nd  March
2010
You need Acrobat Reader to view pdf documents.