|
|
|
|
|
1.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 121.975
(Joya Toll Plaza) FOR THE SECTION FROM KM 93.00 TO 149.250 KM OF NATIONAL HIGHWAY NO 24.
|
30thJuly
2010 |
|
2.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 158 (Moradabad Bypass Toll Plazas) FOR THE SECTION FROM KM 148.430 TO 166.650 KM OF NATIONAL HIGHWAY NO 24.
|
30thJuly
2010 |
|
3.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM…537.770 Near HATTARGI VILLAGE FOR THE SECTION FROM KM. 537.000 TO KM 483.600 KM OF NATIONAL HIGHWAY NO - 4.
|
30thJuly
2010 |
|
4.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 237/629 Village:
Bassi, Tehsil & Distt.: Chittorgarh FOR THE SECTION FROM KM 199/929 TO 252/929 KM OF NATIONAL HIGHWAY NO 76.
|
30thJuly
2010 |
|
5.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 294/469
(AROLI) FOR THE SECTION FROM KM 252/929 TO 306/929 KM OF NATIONAL HIGHWAY NO 76.
|
30thJuly
2010 |
|
6.
|
REHABILITATION, STRENGTHENING AND FOUR LANING OF UDHAMPUR TO
RAMBAN SECTION OF NH-1A, FROM KM 67.00 TO KM 89.00 AND KM 130.00 TO KM
151.00 ON BOT (ANNUITY) BASIS ON DBFO PATTERN, IN THE STATE OF JAMMU
& KASHMIR(Package No. : NHDP-PHASE-II/BOT/IV/J&K)
|
30thJuly
2010 |
|
7.
|
REHABILITATION, STRENGTHENING AND FOUR LANING OF RAMBAN TO
BANIHAL SECTION OF NH-1A, FROM KM 151.000 TO KM 187.000 ON BOT
(ANNUITY) BASIS ON DBFO PATTERN, IN THE STATE OF JAMMU & KASHMIR
(Package No. : NHDP-PHASE-II/BOT/III/J&K)
|
30thJuly
2010 |
|
8.
|
SIX-LANING OF BARWA ADDA
–PANAGARH SECTION OF NH-2 FROM KM 398/000 T0 520/000 INCLUDING
PANAGARH BYPASS IN THE STATES OF JHARKHAND & WEST BENGAL UNDER NHDP
PHASE V ON BOT(TOLL) ON DBFOT PATTERN.
|
29thJuly
2010 |
|
9.
|
Four Laning of Jabalpur- Rajmarg
Crossing –Bareli - Bhopal of NH- 12 from Km. 10.400 to Km. 299.714 in
the state of Madhya Pradesh under NHDP Phase III on BOT (Annuity) Basis
on DBFOT Pattern.
|
27thJuly
2010 |
|
10.
|
I)Appointment of Consultancy firms(National and International and/or JVs) as “Safety Consultant” for carrying out Safety Audit in 48 nos of Projects in total length of
4212km for “PPP projects on DBFO basis(Jammu & Kashmir, Punjab).
|
26thJuly
2010 |
|
11.
|
II)Appointment of Consultancy firms(National and International and/or JVs) as “Safety Consultant” for carrying out Safety Audit in 48 nos of Projects in total length of
4212km for “PPP projects on DBFO basis(Uttar
Pradesh,Utrakhand).
|
26thJuly
2010 |
|
12.
|
III)Appointment of Consultancy firms(National and International and/or JVs) as “Safety Consultant” for carrying out Safety Audit in 48 nos of Projects in total length of
4212km for “PPP projects on DBFO basis(Rajasthan,Madhya Pradesh,
Maharashtra).
|
26thJuly
2010 |
|
13.
|
IV)Appointment of Consultancy firms(National and International and/or JVs) as “Safety Consultant” for carrying out Safety Audit in 48 nos of Projects in total length of
4212km for “PPP projects on DBFO
basis(Haryana).
|
26thJuly
2010 |
|
14.
|
V)Appointment of Consultancy firms(National and International and/or JVs) as “Safety Consultant” for carrying out Safety Audit in 48 nos of Projects in total length of
4212km for “PPP projects on DBFO basis(Karnataka &
Kerala).
|
26thJuly
2010 |
|
15.
|
VII)Appointment of Consultancy firms(National and International and/or JVs) as “Safety Consultant” for carrying out Safety Audit in 48 nos of Projects in total length of
4212km for “PPP projects on DBFO basis(Tamil
Nadu).
|
26thJuly
2010 |
|
16.
|
VIII)Appointment of Consultancy firms(National and International and/or JVs) as “Safety Consultant” for carrying out Safety Audit in 48 nos of Projects in total length of
4212km for “PPP projects on DBFO
basis(Orissa).
|
26thJuly
2010 |
|
17.
|
Landscaping and Avenue plantation work on Dhaula Kuan to RTR stretch of NH-8 and in the island at Rotary near Radisson Hotel on NH-8 in the state of Delhi.
|
23rdJuly
2010 |
|
18
|
Independent Engineer Services for Six Laning from Km 102.035 to Km 144.680 on Chengapalli to Start of Coimbatore Bypass and Four Laning from Km 170.880 to Km 183.010 on End of Coimbatore Bypass to
TN/Kerala Border Section of NH-47 in the State of Tamil Nadu under NHDP Phase II on DBFOT (Toll) basis.
|
23rdJuly
2010 |
|
19.
|
OPERATION AND MAINTENANCE OF KOTA - BARAN SECTION (KM388.263 TO KM 492.322) OF NH-76 IN STATE OF RAJASTHAN ON OMT BASIS
|
22ndJuly
2010 |
|
20.
|
OPERATION AND MAINTENANCE OF
URNEA-DALKOLA-ISLAMPUR-GAYAKOTA (KM 410.700 TO KM 472.840) OF NH-31 AND PURNEA-FORBESGANJ (KM 0.000 TO KM 79.210) OF NH-57 (IN THE STATES OF WEST BENGAL AND BIHAR) ON OMT BASIS (LOT 2, PACKAGE-7)
|
22ndJuly
2010 |
|
21.
|
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR HUMAN RESOURCES CONSULTANTS
|
22ndJuly
2010 |
|
22.
|
APPLICATION FOR THE POST OF
GENERAL
MANAGER (TECHNICAL) ON DEPUTATION
BASIS
|
20thJuly
2010 |
|
23.
|
Planting and maintenance of flowering plants and shrubs in central verge (median) from Km. 381+000 to Km 406+000 of NH-76 on Kota Bypass at Kota on East West Corridor in the state of Rajasthan (Length approx. 25 Km)
|
16thJuly
2010 |
|
24.
|
Four laning of Reengus-Sikar section of NH-11 from existing chainage 298.075 (Design chainage Km.297.850) to existing chainage Km. 342.047 (design chainage Km.342.280) (approx length 44.43) on BOT (Annuity) on DBFOT pattern under NHDP Phase-III in the state of
Rajasthan.
|
16thJuly
2010 |
|
25.
|
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE WORK “DESIGN, ENGINEERING, FINANCE, PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF 2 LANING of CHHAPRA - GOPALGANJ SECTION OF NH-85 FROM KM 0.000 TO KM 94.700 IN THE STATE OF BIHAR UNDER NHDP PHASE-III ON BOT (ANNUITY) BASIS”
|
16thJuly
2010 |
|
26.
|
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE WORK “DESIGN, ENGINEERING, FINANCE, PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF 2 LANING of PIPRAKOTHI – RAXAUL SECTION OF NH-28A FROM KM 0.600 TO KM.62.064 AND RAXAUL BYPASS FROM KM 62.064 to
ICP, RAXAUL IN THE STATE
OF BIHAR UNDER NHDP PHASE-III ON BOT (TOLL) BASIS”
|
16thJuly
2010 |
|
27.
|
Two-Laning of Karaikudi-Ramanathapuram Section of NH-210 (Km 94.000 to Km 174.000)in the state of Tamil Nadu to be executed as BOT (Annuity) on DBFOT pattern under NHDP Phase III
.
|
16thJuly
2010 |
|
28.
|
“FLOWER ARRANGEMENTS AT NHAI CORPORATE OFFICE DWARKA SECTOR 10, NEW DELHI FOR PERIOD OF TWO YEARS” OF CORPORATE OFFICE BUILDING AT G-5&6, SECTOR-10, DWARKA, NEW DELHI
.
|
16thJuly
2010 |
|
29.
|
Supervision Consultant for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Multai – Chhindwara – Seoni section of NH 69 A and Narsinghpur - Amarawara – Chhindwara – Saoner section of NH 26 B in Madhya Pradesh & Maharashtra including construction of Ring Road and connecting roads in Chhindwara Town.
|
16thJuly
2010 |
|
30.
|
Taking away the salvage in the form of timber & fire wood of the felled trees from km 167.000 to km 299.000 of Bijapur to Hospet Section of NH-13 in the Districts of Bagalkot, Koppal and Bellary in the State of Karnataka
|
16thJuly
2010 |
|
31.
|
Rehabilitation and Up-gradation to 2lane with paved shoulders and maintenance of Multai - Chhindwara - Seoni section of NH
69A and Narsinghpur - Amarwara - Chhindwara - Saoner section of NH
26B, in Madhya Pradesh and Maharashtra including construction and maintenance of Ring Road and connecting roads in Chhindwara Town
|
16thJuly
2010 |
|
32.
|
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE WORK “DESIGN, ENGINEERING, FINANCE, PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF 2 LANING of MUZAFFARPUR - SONBARSA SECTION OF NH-77 FROM KM 2.800 TO KM 89.000 IN THE STATE OF BIHAR UNDER NHDP PHASE-III ON BOT (ANNUITY) BASIS
|
15thJuly
2010 |
|
33.
|
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE WORK
DESIGN, ENGINEERING, FINANCE, PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF 4 LANING of
CHHAPRA - HAZIPUR SECTION EXCEPT 2 LANED CHHAPRA BYPASS OF NH-19 FROM KM
143.200 TO KM 207.200 IN THE STATE OF Bihar UNDER NHDP PHASE-III ON BOT (ANNUITY) BASIS
|
15thJuly
2010 |
|
34.
|
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE WORK “DESIGN, ENGINEERING, FINANCE, PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF 2 LANING of MOKAMA
-MUNGER SECTION OF NH-80 FROM KM 1.43 TO KM.70.000 IN THE STATE OF BIHAR UNDER NHDP PHASE-III ON BOT (ANNUITY) BASIS”
|
15thJuly
2010 |
|
35.
|
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE WORK “DESIGN, ENGINEERING, FINANCE, PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF 4 LANING of BARHI
-HAZARIBAGH SECTION OF NH-33 FROM KM 0.000 TO KM 40.500 IN THE STATE OF JHARKHAND UNDER NHDP PHASE-III ON BOT (TOLL) BASIS”
|
15thJuly
2010 |
|
36.
|
Incident Management (Route Patrol, Crane etc. on monthly basis) on Swaroopganj Km. 264 on NH-14 to Udaipur Km. 104+724 on NH-76 via Pindwara stretch in the State of Rajasthan.
|
14thJuly
2010 |
|
37.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 9.158 (MAIN TOLL PLAZA NEAR PANCHAVATI COLONY) & AT KM. 2.262 (SECONDARY TOLL PLAZA NEAR GOSTHANI GATE OF NAVY) OF VISAKHAPATNAM PORT CONNECTIVITY PROJECT CORRIDOR FROM KM 0.00 TO 10.336 KM.
|
14thJuly
2010 |
|
38.
|
COLLECTION OF USER FEE THROUGH PRIVATE CONTRACTOR ON THE BASIS OF COMPETITIVE BIDDING AT KM.1050/794
(KALAPARRU) FOR KM.1022/494 TO KM.1061/594 ON GUNDUGOLANU -VIJAYAWADA SECTION OF NATIONAL HIGHWAY No.5
|
14thJuly
2010 |
|
39.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM.104/990, CHENNASAMUDRAM FOR THE SECTION FROM KANCHEEPURAM TO WALAJAHPET KM.60/100 TO KM.107/200 OF NATIONAL HIGHWAY NO. 4.
|
14thJuly
2010 |
|
40.
|
COLLECTION OF USER FEE THROUGH PRIVATE CONTRACTOR ON THE BASIS OF COMPETITIVE BIDDING AT KM 1344.450, SUNNAMBATTI FOR KM. 1383.713 TO 1322.750 (OLD KM. 161.034 TO KM. 222.000) ON NELLORE – KAVALI SECTION OF NATIONAL HIGHWAY -5
|
14thJuly
2010 |
|
41.
|
COLLECTION OF USER FEE THROUGH PRIVATE CONTRACTOR ON THE BASIS OF COMPETITIVE BIDDING AT KM.1075/244
(PATTIPADU) FOR KM.1061/594 TO KM.1100/694 ON GUNDUGOLANU-VIJAYAWADA SECTION OF NATIONAL HIGHWAY No. 5
|
14thJuly
2010 |
|
42.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM. 589.554, MADAPAM TOLL PLAZA FOR THE SECTION FROM KM. 543.204 TO 606.204 OF NATIONAL HIGHWAY NO 5.
|
14thJuly
2010 |
|
43.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM. 616.704, CHILAKAPALEM TOLL PLAZA FOR THE SECTION FROM KM. 606.704 TO 654.204 ( SRIKAKULAM – CHAMPAVATI SECTION) OF NATIONAL HIGHWAY NO 5.
|
14thJuly
2010 |
|
44.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 16/500 VANAGARAM USE FEE COLLECTION BOOTH FOR THE CHENNAI BY PASS SECTION FROM KM 00/00 TO KM 19/170 OF NATIONAL HIGHWAY CONNECTIING NH-45 AND NH-4
|
14thJuly
2010 |
|
45.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT FIVE PLAZAS NAMELY AHMEDABAD TOLL PLAZA AT KM.2.6, AUDA RING ROAD TOLL PLAZA AT KM. 3.8,NADIAD TOLL PLAZA AT KM. 43.855 KM.,ANAND TOLL PLAZA AT KM. 58.616 AND VADODARA TOLL PLAZA AT KM. 86 OF AHMEDABAD VADODARA EXPRESSWAY
FROM KM 0.00 TO 93.3 KM OF NATIONAL EXPRESSWAY NO – NE 1.
|
14thJuly
2010 |
|
46.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM. 795.498, VEMPADU TOLL PLAZA FOR THE SECTION FROM KM. 741.255 TO 830.525 OF NATIONAL HIGHWAY NO 5.
|
14thJuly
2010 |
|
47
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 91 AT VASAD TOLL PLAZA FOR AHMEDABAD VADODARA SECTION OF NATIONAL HIGHWAYS NO. 8 FROM KM. 6/400 TO KM. 104/000
|
14thJuly
2010 |
|
48
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM. 964.350, TANUKU TOLL PLAZA FOR THE SECTION FROM KM. 914.833 TO 1022.494 OF NATIONAL HIGHWAY NO 5.
|
14thJuly
2010 |
|
49
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM. 656.704, NATHAVALASA TOLL PLAZA FOR THE SECTION FROM KM. 654.204 TO 700.544 OF NATIONAL HIGHWAY NO 5.
|
14thJuly
2010 |
|
50.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM. 530.404, LAKSHMIPURAM TOLL PLAZA FOR THE SECTION FROM KM. 477.054 TO 543.204 OF NATIONAL HIGHWAY NO 5.
|
14thJuly
2010 |
|
51.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM. 865.553, KRISHNAVARAM TOLL PLAZA FOR THE SECTION FROM KM. 830.525 TO 914.883 OF NATIONAL HIGHWAY NO 5.
|
14thJuly
2010 |
|
52.
|
COLLECTION OF USER FEE THROUGH PRIVATE CONTRACTOR ON THE BASIS OF COMPETITIVE BIDDING AT KM 1199.800, BOLLAPALLI FOR KM. 1250.691 TO KM 1183.027 (OLD KM. 291.000 TO KM. 358.000) ONGOLE- CHILAKALURIPET SECTION OF NATIONAL HIGHWAY -5
|
14thJuly
2010 |
|
53.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM. 728.055, AGANAMPUDI TOLL PLAZA FOR THE SECTION FROM KM. 700.544 TO 741.255 OF NATIONAL HIGHWAY NO 5.
|
14thJuly
2010 |
|
54.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ENGAGED ON THE BASIS OF COMPETITIVE BIDDING AT KM 21/020 BOOTHAKUDI USER FEE COLLECTION BOOTH FOR THE TRICHY TO TOVARANKURICHI SECTION FROM KM 0.000 TO KM 60.950 OF NATIONAL HIGHWAY NO 45B.
|
13thJuly
2010 |
|
55
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ENGAGED ON THE BASIS OF COMPETITIVE BIDDING AT CHAINAGE 28+100 (RITHOLA TOLL PLAZA) FOR THE SECTION FROM CHAINAGE 0+00 TO 29+600 OF ACCESS CONTROL CHITTORGARH BYPASS (FROM KM. 159.00 OF NH-79 TO KM. 213.00 OF NH-76) IN THE STATE OF RAJASTHAN.
|
13thJuly
2010 |
|
56.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ENGAGED ON THE BASIS OF COMPETITIVE BIDDING AT KM. 200 (PULLUR TOLL PLAZA) FOR KOTHAKOTA BYPASS – KARNOOL SECTION FROM KM. 135.469 TO KM. 211.00 OF NATIONAL HIGHWAY NO. 7
|
13thJuly
2010 |
|
57.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ENGAGED ON THE BASIS OF COMPETITIVE BIDDING AT KM. 443.713 (MANOHARABAD TOLL PLAZA) FOR ADLOOR YELLAREDDY TO GUNDLA POCHAMPALLY SECTION FROM KM. 368.255 TO KM. 471.331 OF NATIONAL HIGHWAY NO. 7
|
13thJuly
2010 |
|
58.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ENGAGED ON THE BASIS OF COMPETITIVE BIDDING AT KM 464.774 NEAR BAGEPALLI FOR AP/KARNATKA BORDER TO DEVANHALLI SECTION FROM KM. 462.164 TO KM. 533.619 OF NATIONAL HIGHWAY NO 7.
|
13thJuly
2010 |
|
59.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM. 39 NEAR NAWABGANJ FOR THE SECTION FROM KM 11.00 TO KM 59 OF NATIONAL HIGHWAY NO 25 (LUCKNOW-KANPUR ROAD).
|
13thJuly
2010 |
|
60.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 506.262 PURWAMEER TOLL PLAZA FOR THE SECTION FROM KM 457.377 TO Km 508.877 OF NATIONAL HIGHWAYS NO. 2
|
13thJuly
2010 |
|
61.
|
SCOLLECTION OF USER FEE THROUGH USER FEE
COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 225.00
OF NH-2 at TUNDLA, DISTRICT FIROZABAD (U.P.) FOR THE SECTION FROM KM
219.00 TO 250.500 KM OF NATIONAL HIGHWAY NO 2.
|
13thJuly
2010 |
|
62.
|
Independent Engineer services for
Hazipur-Muzaffarpur section of NH-77 from km 0.000 to km.46.300 and construction of 16.870 km. new bypass starting at Km. 46.300 and connecting NH-28 of East West Corridor at km. 515.045 in the State of Bihar on DBFOT Basis under NHDP-Phase-III
|
13thJuly
2010 |
|
63.
|
Construction of Steel Foot Over Bridges at km 11.000
(Dhaula Kuan near DSOI gate) & at km 13.700 (Near Jharera Village) between Dhaula Kuan and RTR section of NH-8 CONTRACT PACKAGE NO : (Package No. DG - 1 / FOB)
|
13thJuly
2010 |
|
64.
|
Independent Engineer services for Four Laning of Goa/Karnataka Border to
Panaji-Goa stretch of NH-4A from Km 84+000 to Km 153+070 in the State of Goa on BOT (Build, Operate and Transfer) Toll basis under NHDP Phase- III
|
13thJuly
2010 |
|
65.
|
Supervision for Widening, widening with raising and strengthening to 2 lane with improvement of geometric and construction/reconstruction of CD works in km 147-181 & 191-201 on NH-59A in the sate of Madhya Pradesh under Special Project Scheme
|
12thJuly
2010 |
|
66.
|
Construction Supervision for Widening to 2 lane and strengthening of km 42-77 & 124-126 on NH-59A in the sate of Madhya Pradesh
|
12thJuly
2010 |
|
67.
|
Supply & Deployment of Manpower for Round the Clock Supervision to oversee and ensure smooth & efficient functioning of Temporary Toll Plaza at Km. 185+387 of Tirunelveli to Panagudy Section (NH-7) of North-South Corridor in the state of
TamilNadu.
|
10thJuly
2010 |
|
68.
|
Empanelment of User Fee Auditor for User Fee Plaza at km.185+387 of Tirunelveli to Panagudy Section of NH-7 in the state of Tamilnadu
|
10thJuly
2010 |
|
69.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 58/800 (NEAR JAM) FOR THE WAGHADI NALLAH BRIDGE LOCATED IN KM. 59 ON NAGPUR – HYDERABAD SECTION OF NATIONAL HIGHWAY NO. 7.
|
10thJuly
2010 |
|
70.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING FOR THE GAUSAGHAT BRIDGE LOCATED AT KM. 07 ON
DARBHANGA-SAKARI SECTION OF NATIONAL HIGHWAY NO. 57.
|
10thJuly
2010 |
|
71.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 213/100 ON NH-8B NR.
VILL. VAGHASIA, TAL. WANKANER, DIST. RAJKOT, (4+1 TYPE PLAZA) FOR THE BAMANBORE – GARAMORE SECTIONS FROM KM 183/500 TO KM 254/00 (NEW CHAINAGE KM 182.600 – KM 254.537) OF NATIONAL HIGHWAY NO 8A IN THE STATE OF GUJARAT.
|
10thJuly
2010 |
|
72.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 271.000
(UNDVARIYA TOLL PLAZA, DISTRICT SIROHI, RAJASTHAN) FOR THE SECTION FROM KM 295.000 TO KM. 248.700 OF NATIONAL HIGHWAY NO 14 ( IN THE STATE OF RAJASTHAN )
|
10thJuly
2010 |
|
73.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 368.00 FOR THE ROB TOLL PLAZA, KISHANGARH i.e. ROB WITH APPROCHES LOCATED BETWEEN KM. 367.320 TO KM 368.483 ON KISHANGARH - BEAWAR SECTION OF NATIONAL HIGHWAY NO. 8
|
10thJuly
2010 |
|
74.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 103.490
(Rampura, West Bengal ) FOR THE SECTION FROM KM 69.450 TO KM 119.275 OF NATIONAL HIGHWAY NO 60.
|
10thJuly
2010 |
|
75.
|
COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM. 191.698 (AT PANIKOILI TOLL PLAZA) FOR THE SECTION FROM KM.227.000 TO KM.157.000
(CHHATIA – BHADRAK) OF NATIONAL HIGHWAY NO.5.
|
10thJuly
2010 |
|
76.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT CABLE STAYED BRIDGE ACROSS YAMUNA AT ALLAHABAD/NAINI IN THE SATE OF UTTAR PRADESH FROM KM.00.00(211.700 OF NH-2) TO KM.5.410 (NEW ALIGNMENT OF NH-27)
(ALLAHABAD-MANGAWAN) SECTION OF NH-27
|
10thJuly
2010 |
|
77.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 52.00
(Laxmannath, Orissa ) FOR THE SECTION FROM KM 0.000 TO KM 69.450 OF NATIONAL HIGHWAY NO 60.
|
10thJuly
2010 |
|
78.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 150 (NEAR
PANDHARKAWADA) FOR THE KHUNI RIVER BRIDGE LOCATED IN KM. 150 ON NAGPUR – HYDERABAD SECTION OF NATIONAL HIGHWAY NO. 7.
|
10thJuly
2010 |
|
79.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 339.000
(KHEMANA TOLL PLAZA, DISTRICT BANASKANTHA) FOR THE SECTION FROM KM 295.000 TO KM. 340.000 OF NATIONAL HIGHWAY NO 14 ( IN THE STATE OF GUJARAT )
|
10thJuly
2010 |
|
80.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM. 104+530 NEAR KARJEEVANAHALLI VILLAGE FOR ANTHARASANAHALLI – TAVAREKERE SECTION FROM KM. 72.00 TO KM 132.00 OF NATIONAL HIGHWAY NO 4.
|
10thJuly
2010 |
|
81.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT JALADHULAGORI TOLL PLAZA AT KM 35.250 OF NH-6 (FOR THE SECTION FROM KM 18.50 TO KM 72.00 OF NATIONAL HIGHWAY NO -6.
|
10thJuly
2010 |
|
82.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM. 172+767 GUILALU VILLAGE FOR TAVAREKERE – DODDASIDDANAHALLI SECTION FROM KM. 132.00 TO KM 189.00 OF NATIONAL HIGHWAY NO 4.
|
10thJuly
2010 |
|
83.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KALI NADI BRIDGE TOLL PLAZA, HAPUR IN GHAZIABAD DISTRICT FOR THE BRIDGE LOCATED AT KM. 60.00 SECTION OF NATIONAL HIGHWAY NO.24
|
10thJuly
2010 |
|
84.
|
COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM. 301.700 (AT GANGAPADA TOLL PLAZA) FOR THE SECTION FROM KM.362.000 TO KM.297.000 (New Chainage) (SUNAKHALA – BHUBANESWAR) OF NATIONAL HIGHWAY NO.5.
|
10thJuly
2010 |
|
85.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 281.320 NEAR GAMJAL VILLAGE, ADILABAD DISTRICT, ANDHRA PRADESH FOR THE SECTION FROM KM 278 (KADTAL) TO KM 308 (ARMUR) OF NAGPUR – HYDERABAD SECTION OF NATIONAL HIGHWAY NO 7.
|
10thJuly
2010 |
|
86.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT BARAMULLA (DEBRA) TOLL PLAZA AT KM 112.695 OF NH-6 (FOR THE SECTION FROM KM 74.00 TO KM 129.607 OF NATIONAL HIGHWAY NO -6.
|
10thJuly
2010 |
|
87.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ENGAGED ON THE BASIS OF COMPETITIVE BIDDING AT KM 113/630 CHITTAMPATTI USER FEE COLLECTION BOOTH FOR THE TOVARANKURICHI TO MADURAI SECTION FROM KM 60.950 TO KM 124.840 OF NATIONAL HIGHWAY NO 45B.
|
10thJuly
2010 |
|
88.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 480.500 at Chhidan Toll Plaza (near Amritsar) in the State of Punjab FOR THE SECTION FROM KM 456.100 TO 492.030 KM OF NATIONAL HIGHWAY NO 1.
|
10thJuly
2010 |
|
89.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM 151.100 ON AMRAVATI TOLL PLAZA & KM.166.100 ON BADNERA TOLL PLAZA FOR THE SECTION FROM KM 149.800 TO KM 167.220 OF NATIONAL HIGHWAY NO 6
|
10thJuly
2010 |
|
90.
|
COLLECTION OF USER FEE THROUGH USER FEE COLLECTING AGENCY ENGAGED ON THE BASIS OF COMPETITIVE BIDDING AT KM 21/020 BOOTHAKUDI USER FEE COLLECTION BOOTH FOR THE TRICHY TO TOVARANKURICHI SECTION FROM KM 0.000 TO KM 60.950 OF NATIONAL HIGHWAY NO 45B.
|
10thJuly
2010 |
|
91.
|
Independent Engineer services for Four Laning of Kundapur – Surathkal Section from km 283 +300 to km 358+ 080 (Section -1) and Mangalore – Kerala Border [(km 375 + 300 to km 376 + 700) ( i.e. Nantur circle to Mahaveer circle) and km 3 + 700 to km 17 + 200 ( i.e. Mahaveer circle to Kerala border)] (Section 2) in the State of Karnataka on Design, Build, Finance, Operate and Transfer (“DBFOT”) basis under NHDP III (Package No.: Kar / Phase-III / IC-3/2010)
|
9thJuly
2010 |
|
92.
|
Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of Group of NH stretches under
NHDP-IVB
1. Barabanki-Bahraich-Rupaidiha section of NH-28C under NHDP-IVB in the State of Uttar Pradesh
2. Gorakhpur-Sonauli section of NH-29E under NHDP-IVB in the State of Uttar Pradesh
3. MP/UP border to Allahabad section of NH-27 NHDP-IVB in the State of Uttar Pradesh
4. ROB on NH-28 at Nanda Nagar(Next to Kudaghat near Gorakpur Air port) Railway crossing at Gorakhpur
|
9thJuly
2010 |
|
93.
|
Widening to 2 Lanes and Strengthening of
Indore-Betul Section of NH-59A(Indore-Betul Section) from Km 42 to
77 and Km 124 to 126 in The State of Madhya Pradesh.
|
9thJuly
2010 |
|
94.
|
“Report on selection of ETC technology submitted by the Committee headed by
Shri. Nandan Nilekani, Chairman, UIDAI”
|
9thJuly
2010 |
|
95.
|
Two Laning with paved shoulder of Tindivanam – Krishnagiri Section of NH-66 from km 38.150 to km 216.210 on BOT (Annuity) basis under NHDP Phase-III in the State of Tamil Nadu
|
9thJuly
2010 |
|
96.
|
COLLECTION
OF USER FEE THROUGH USER FEE COLLECTING AGENCY ENGAGED ON THE BASIS
OF COMPETITIVE BIDDING AT KM 464.774 NEAR BAGEPALLI FOR AP/KARNATKA
BORDER TO DEVANHALLI SECTION FROM KM. 462.164 TO KM. 533.619 OF
NATIONAL HIGHWAY NO 7.
|
9thJuly
2010 |
|
97.
|
COLLECTION OF USER FEE THROUGH USER FEE
COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING AT KM.
165/050, VILLAGE-NARAYANPURA, TEHSIL-VALLABHNAGAR, DISTRICT-UDAIPUR,
RAJASTHAN FOR THE SECTION FROM KM. 113.830 TO KM. 213.000
(UDAIPUR-RITHOLA)
OF NATIONAL HIGHWAY NO. 76.
|
9thJuly
2010 |
|
98.
|
COLLECTION OF USER FEE THROUGH USER FEE
COLLECTING AGENCY ENGAGED ON THE BASIS OF COMPETITIVE BIDDING AT KM.
200 (PULLUR TOLL PLAZA) FOR KOTHAKOTA BYPASS – KARNOOL SECTION
FROM KM. 135.469 TO KM. 211.00 OF NATIONAL HIGHWAY NO. 7
|
9thJuly
2010 |
|
99.
|
Supervision consultant for Widening,
widening with raising and strengthening to 2 lane with improvement
of geometric and construction/reconstruction of CD works in km
147-181 & 191-201 on NH-59A(Indore-Betul Section) in the state
of Madhya Pradesh under Special Project Scheme
|
8thJuly
2010 |
|
100.
|
EXPRESSION
OF INTEREST FOR CONSULTING SERVICES FOR RESTRUCTURED
LUCKNOW-MUZAFFARPUR NATIONAL HIGHWAY PROJECT FOR MONITORING OF
PROJECT OUTCOME INDICATORS AND ROAD USER SATISFACTION SURVEY
|
8thJuly
2010 |
|
101.
|
Balance work of construction of 4-lane road for km 83.4 to km 111.0 of Maibong to Lumding section of NH-54 in the State of Assam
|
8thJuly
2010 |
|
102.
|
Supervision Consultant for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Multai – Chhindwara – Seoni section of NH 69 A and Narsinghpur - Amarawara – Chhindwara – Saoner section of NH 26 B in Madhya Pradesh & Maharashtra including construction of Ring Road and connecting roads in Chhindwara Town.
|
8thJuly
2010 |
|
103.
|
Six
Laning of Dhankuni to Kharagpur Section of NH-6 from Km 17.600 to Km
129.000 in the State of West Bengal under NHDP Phase – V on
Design, Build, Finance, Operate And Transfer (DBFOT) Toll Basis .
|
8thJuly
2010 |
|
104.
|
Fixing
of Boundary Survey Stones and Marking of ROW from Km.0.000 to
Km.84.124 of Belgaum – Goa / Karnataka Border of NH-4A in the
State of Karnataka.
|
8thJuly
2010 |
|
105.
|
Supply, Installation, Commissioning and Maintenance of Computers & Peripherals and Manpower on monthly hire basis for six months User fee plaza at Km.185+387 of Tirunelveli to Panagudy section on NH-7 in the State of Tamil Nadu
|
7thJuly
2010 |
|
106.
|
Reconstruction of existing Minor Bridge in Km.231/600 including its approaches on
Nagpur-Betul road section of NH-69 in Pandhurna town on NH-69 in state of Madhya Pradesh
|
6thJuly
2010 |
|
107.
|
MAKING TEMPORARY ARRANGMENT FOR TOLL COLLECTION AT KM 185+387 OF NH-7 CONSTRUCTION PACKAGE NS-43/TN – TIRUNELVELI TO PANAGUDY SECTION (NH-7) OF NORTH – SOUTH CORRIDOR IN THE STATE OF TAMILNADU
|
3rdJuly
2010 |
|
108.
|
Widening and strengthening of the existing 2 lane road to a 4 lane divided carriageway from km. 256+550 (Kota) to km. 289+560
(Darah) & 2 lane with paved shoulder from km. 289+560 (Darah) to km. 346+539
(Teendhar) section of Kota-Jhalawar Section (Package II) of NH-12 on DBFOT pattern on BOT (Toll) in the State of Rajasthan.
|
2ndJuly
2010 |