What's New 

                December 2009                                  Current                                                      November 2009

S.NO

Title

Posted On

1.

Invitation of RFP for Two/Four-laning of Purnea-Khagaria section of NH-31 from km 270.00 to km 410.00 in the State of Bihar under NHDP Phase-III on BOT (Toll) Basis
Letter, RFP

30th  January
2010

2.

RFP for Four/Two Laning of Rimuli-Roxy-Rajamunda Section of NH 215 from km 163.00 to km 269.00 (design chainage Km 163.00 to Km 259.453) in the State of Orissa to be executed as BOT (Toll) Project on DBFOT Pattern under NHDP Phase III Project 
Letter
, RFP

30th  January
2010

3.

Four/Two Laning of Chandikhole-Dubari-Talcher Section of NH 200 from Km 301.890 to km 428.030 in the State of Orissa to be executed as BOT (Toll) project on DBFOT Pattern under NHDP Phase III – Invitation to the pre-qualified Applicants for RFP- reg. 
Letter
, RFP

30th  January
2010

4.

Consultancy Services for Preparation of Feasibility study for Six lanning of Ahemdabad - Bamanbore - Samakhiali & Bamanbore - Rajkot section of NH - 8A & 8B in the state of Gujarat (approx. length 338 km.) - Mega Infrastructure Highway Project.
Corrigendum, EOT , Replies of Queries

29th  January
2010

5.

Supply, Installation, Commissioning and Maintenance of Computers & Peripherals for the upcoming Toll Plaza @ Km.18+652 & Km.74+930 of Madurai to Kovilpatti Section (NH-7) of North-South Corridor in the state of TamilNadu.
NIT, Bid Document, Annexure

29th  January
2010

6.

Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km) in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern
Feasibility Study, Strip Plan

29th  January
2010

7.

2 Laning of Rohtak Hissar section from km 87.000 to km 170.00 of NH-10 to be executed as BOT(Toll) Project on DBFO Pattern under NHDP Phase III in the State of Haryana.
NIT, RFQ

29th  January
2010

8.

FOUR/SIX LANING OF SOLAPUR-MAHARASHTRA/KARNATAKA BORDER SECTION OF NH – 13 FROM KM 0.000 TO KM 30.450 IN THE STATE OF MAHARASHTRA TO BE EXECUTED AS BOT (TOLL) ON DBFO PATTERN UNDER NHDP PHASE –III(Package No. : NHAI/ NHDP-III/MAHA/BOT/SMK)
Extended Due Date

28th  January
2010

9.

Four/Two Laning of Panikoili - Rimuli Section from Km 00.00 to km 163.00 of NH-215 in the State of Orissa to be executed as BOT (Toll) project on DBFOT Pattern under NHDP Phase III – Invitation to the pre-qualified Applicant for RFP- reg.
Letter, RFP

28th  January
2010

10.

Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km) in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern
Extended Due Date-II

27th  January
2010

11.

Six-Laning of Icchapuram-Srikakulam-Vishakhapatnam-Ankapalli-Rajahmundary Section of NH-5 From Km 470.000 to Km 901.753 (Length – 436km)in the State of Andhra Pradesh to be executed as Bot (Toll) on DBFOT Pattern Under Mega Infrastructure Highway Project NHDP Phase – V.
Corrigendum – IV

27th  January
2010

12.

Appointment of Safety Consultants for “PPP Projects on DBFO basis”
RFP, Schedules

27th  January
2010

13.

Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of Ner Chowk- Manali Section of NH-21 under NHDP-IVB in state of Himachal Pradesh. Amendment, Prebid meeting

27th  January
2010

14.

Invitation of RFP for two/ four laning of the existing Patna – Buxar Section of NH-30 from Km 181.300 to Km 117.00 & NH-84 from Km 0.00 to Km 75.00 in the State of Bihar under NHDP Phase-III on BOT (Toll) Basis.
Letter, Bid Document, Schedule

27th  January
2010

15.

Hiring of vehicles on monthly basis and day-to-day basis.
NIT

27th  January
2010

16.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance for Four-laning of Krishnagar - Baharampore Section of NH- 34 (km. 115.000 to km. 193.000) in the State of West Bengal under NHDP Phase III on BOT (Annuity) basis on DBFOT Pattern.
Cover Page, RFP

27th  January
2010

17.

Consultancy Services for Feasibility study and Preparation of Detailed Project Report for widening/six laning/up gradation of existing four lanned section of Narmada bridge & its approaches from Km. 192.00 to 198.00 on Ahmedabad-Mumbai Section of NH-8 and value addition works to Vadodara to Bharuch & Bharuch to Surat Section of NH-8. Corrigendum, Replies of Queries

27th  January
2010

18.

Up- gradation of Andheria More to Delhi/Haryana Border section of Mehrauli-Gurgaon Highway in NCT of Delhi Contract Package- MG/01/2010.
BOQ

27th  January
2010

19.

FOUR LANING OF KUTTIPURAM - EDAPALLY SECTION OF NH-17 FROM KM 318+000 TO KM 438+600 UNDER NHDP PHASE III IN THE STATE OF KERALA ON DBFOT BASIS.
Addendum-I, Addendum-II, Addendum-III, Replies Prebid Queries

23rd  January
2010

20.

MAKING TEMPORARY ARRANGMENT FOR TOLL COLLECTION AT KM 74+930 & KM 125+735 OF NH-7 CONSTRUCTION PACKAGE NS-40/TN & NS-41/TN – VIRUDHUNAGAR TO KAYATHAR SECTION (NH-7) OF NORTH – SOUTH CORRIDOR IN THE STATE OF TAMILNADU.
Corrigendum-II

23rd  January
2010

21.

Two laning of Jhansi - Khajuraho section of NH-75 from km 1.900 to km 165.950 in the State of Madhya Pradesh/ UP under DBFOT (Annuity) Basis.
RFQ on BOT (Toll) Corrigendum

22nd  January
2010

22.

Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km) in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern
Pre Bid Meeting

22nd  January
2010

23.

Four Laning of Up/Haryana Border-Yamunanagar-Saha-Barwala-Panchkula Section of NH-73 From Km 71.640 to Km 179.285 in the State of Haryana Under NHDP Phase III on Design, Build, Finance, Operate And Transfer (The “DBFOT”) Basis.
Schedule

21st  January
2010

24.

2/4 laning of Rohtak Jind Section from km 302.670 to km 352.250 of NH-71 to be executed as BOT (Annuity) project on DBFO Pattern under NHDP Phase III in the State of Haryana Project.
Extended Due Date

21st  January
2010

25.

2/4 Laning Of Ambala Kaithal Section From Km 5.00 To Km 77.80 Of NH-65 To Be Executed As BOT (Annuity) Project On DBFO Pattern Under NHDP Phase III In The State Of Haryana.
Extended Due Date

21st  January
2010

26.

Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km) in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern
Letter

21st  January
2010

27.

Balance Work of 4 laning of Nagpur – Hyderabad Section of NH – 7 from km 94.000 to km 123.000 in the State of Maharashtra [Contract Package No. NS-60(MH)-Bal]
Drawings

21st  January
2010

28.

PROVIDING SERVICES OF TECHNICAL MANPOWER VIZ NETWORK/ SYSTEM ADMINISTRATOR AND DESKTOP ADMINISTRATOR TO MAINTAIN COMPUTER HARDWARE, NETWORKING, CABLING & UPS etc. FOR ANEWADI AND KHEDSHIVAPUR TOLL PLAZAS AT KM 748/600 AND 819.240 of NH-4 IN THE STATE OF MAHARASHRA.
Bid Document

20th  January
2010

29.

Up- gradation of Andheria More to Delhi/Haryana Border section of Mehrauli-Gurgaon Highway in NCT of Delhi Contract Package- MG/01/2010.
Vol-I, Vol-II, Vol-III

19th  January
2010

30.

Consultancy Services for Preparation of Detailed Project Report for 6/8 laning with service Roads from Km 10 to Km 20 on Hyderabad-Bangalore section including Improvement of geometrics, etc from Km 22.300 to Km 34.140 on Hyderabad-Bangalore section and from Km 447 to Km 464 on Nagpur-Hyderabad section of NH-7 in the State of Andhra Pradesh. 
RFP

18th  January
2010

31.

Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km) in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern
Extended Due Date

18th  January
2010

32.

Four-laning of Panvel – Indapur section of NH – 17 from km 0.000 to km 84.000 in the State of Maharashtra to be executed as BOT (TOLL) on DBFO Pattern under NHDP Phase –III .
Re-Revised RFQ

18th  January
2010

33.

Four Laning of Up/Haryana Border-Yamunanagar-Saha-Barwala-Panchkula Section of NH-73 From Km 71.640 to Km 179.285 in the State of Haryana Under NHDP Phase III on Design, Build, Finance, Operate And Transfer (The “DBFOT”) Basis.
Cover Page, RFP

18th  January
2010

34.

APPLICATION FORM FOR PROVIDING DOCUMENT MANAGEMENT SERVICES IN NHAI HEAD QUARTERS, DWARKA
Bid Document-I, Advertisement, Cover Page, Bid Document-II

18th  January
2010

35.

Supply, Installation, Commissioning and Maintenance of Computers & Peripherals for the upcoming Toll Plaza @ Km.18+652 & Km.74+930 of Madurai to Kovilpatti Section (NH-7) of North-South Corridor in the state of TamilNadu.
Corrigendum

18th  January
2010

36.

Four Laning of Jorbat – Shillong (Barapani) Section of NH –40 from km 0.000 to Km. 61.800 of NH- 40 in the State of Assam and Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis.
Extended Bid Due Date-VIII

18th  January
2010

37.

“Design, Engineering, Construction, Development, Finance, Operation and Maintenance Two Laning of Shillong Bypass Section of NH –40 & NH-44 from Km 61.800 of NH-40 to Km 34.850 of NH-44 in the State of Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis”.
Extended Bid Due Date-IX

18th  January
2010

38.

“Supply, Installation, Commissioning and Maintenance of Computers, Printers, Servers, UPS & Peripherals at Srirampur Toll Plaza at 4th Km. on Chandikhole – Paradip Section of NH – 5A in the State of Orissa.”
Bid Document

15th  January
2010

39.

RFP for Development of Eastern Peripheral Expressway (National Highway No. NE-II) from km 0.00 to km 135.00 (starting from Km 36.083 on NH – I and ending at Km 64.330 on NH – 2) in the states of Haryana and Uttar Pradesh to be executed as BOT (Toll) project on DBFOT Pattern
Addendum

15th  January
2010

40.

Periodical Repair of the stretches (A) Bagdogra-Siliguri section from Km. 562 to Km. 563 and Km. 565.50 to Km. 566.00 of NH-31 in the state of West Bengal. (B) Siliguri-Jalpaiguri section from Km. 87.00 to Km. 97.00 existing chainage of SH-12A or Km. 11.05 to Km. 21.05 of NH-31 D in the state of West Bengal. 
Corrigendum

15th  January
2010

41.

Two laning with paved shoulder of Jabalpur – Mandla – Chilpi Section of NH-12A from km 3/4 to km 192/4 in the State of Madhya Pradesh on BOT (Annuity) Basis under DBFOT pattern.
NIT

15th  January
2010

42.

Independent Engineer services for four laning of Armur- Adloor- YellaReddy from Km 308 to km 367 on Nagpur-Hyderabad Section of NH-7 in the State of Andhra Pradesh [Civil Package No.NS2/BOT/AP-1] on DBFOT Basis under NHDP-Phase-II.
RFP

15th  January
2010

43.

4/6 laning of Maharashtra/Goa Border to Panaji-Goa/Karnataka Border section of NH-17 in the State of Goa under NHDP Phase-III-Reg RFP.
Corrigendum-IV

15th  January
2010

44.

Two laning with paved shoulder of Jabalpur – Mandla - Chilpi Section of NH-12A from km 3/4 to km 192/4 in the State of Madhya Pradesh on BOT (Annuity) Basis under DBFOT pattern.
Corrigendum

14th  January
2010

45.

Invitation of RFQ for OMT Package-3 (Chittorgarh - Kota section of NH-76), Package-4 (Swaroopganj - Pindwada Section of NH-14 & Pindwada- Udaipur Section of NH-76) and Package-5 (Baran - Shivpuri section of NH-76 and Shivpuri-Jhansi section of NH-25).
Invitation Notice, RFQ

14th  January
2010

46.

Operation & Maintenance of National Highways On OMT Basis Package No. NHAI/OMT/6/2009-10.(Madurai-Tirunelveli- Panagudi Section (Km 0.00 to Km 211.140) of NH-7)
Invitation Notice, RFQ

14th  January
2010

47.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Quazigund - Banihal Section from Km 189.350 to Km 204.700 including two tunnels (2 Lane) of 0.69 kms and 8.45 kms of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/II/J&K)”Project on BOT (Annuity) basis.
Corrigendum, Reply to Queries

13th  January
2010

48.

Rehabilitation, Strengthening and Four Laning of Ramban to Banihal Section of NH-1A, from Km 151.000 to Km 187.000 on BOT (Annuity) basis on DBFO pattern in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/I/J&K)”Project. 
Corrigendum
, Reply to Queries

13th  January
2010

49.

Rehabilitation, Strengthening and Four Laning of Udhampur to Ramban Section of NH-1A, from Km 67.00 to Km 89.00 and Km 130.00 to Km 151.00 on BOT (Annuity) basis on DBFO Pattern, in the State of Jammu & Kashmir (Pkg No:- NHDP-Phase-II/BOT/IV/J&K) Project
Corrigendum, Reply to Queries

13th  January
2010

50.

Consultancy Services for Feasibility Study and Detailed Project Report for 4/6 laning of Jabalpur-Rewa Section of National Highway No. 07 in the State of Madhya Pradesh.
Reply of Pre Bid Queries

13th  January
2010

51.

INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE WORK OF DESIGN, ENGINEERING, FINANCE, PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF “4 laning of Cherthalai - Ochira Section of NH – 47 from Km 379.100 to Km 465.000” AND “4 laning of Ochira – Thiruvananthapuram Section of NH – 47 from Km 465.000 to Km 551.900”IN THE STATE OF KERALA UNDER NHDP PHASE III ON DBFOT BASIS.
EOI, Extend Due Date

13th  January
2010

52.

Rehabilitation, Strengthening and Four Laning of Srinagar to Banihal Section from Km 187.000 to Km 189.350 (Banihal Bypass) and Km 220.700 to Km 286.110 of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/I/J&K)”Project.
  Replies to Queries, Corrigendum

13th  January
2010

53.

Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km) in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern
  Pre Qualified Bidders

12th  January
2010

54.

Six laning of Tumkur- Chitradurga section (excluding Tumkur & Chitradurga Bypass ) from km 75.00 to km 189.00 of NH-4 (approx 114.00 km ) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V.
Amendment-III

12th  January
2010

55.

Consultancy Services for Preparation of Feasibility Study Report for Rehabilitation and Upgrading to 4 lane with paved shoulders configuration of Gwalior Dewas section of NH-3 in the State of Madhya Pradesh .
Letter, Payment Schedule, TOR

12th  January
2010

56.

INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE FOUR LANING OF MUZAFFARNAGAR-HARIDWAR AND HARIDWAR DEHRADUN SECTIONS OF NH-58 AND 72 IN THE STATES OF UTTAR PRADESH AND UTTARAKHAND UNDER NHDP PHASE-III ON DBFOT BASIS.
NIT
, EOI

11th  January
2010

57.

Six laning of Belgaum – Dharwad Section of NH-4 km 433.00 to km 515.00 (length – 79.36 km) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V.
Amendment-III

11th  January
2010

58.

2-LANING WITH PAVED SHOULDERS OF NAGAPATNAM -THANJAVUR SECTION OF NH-67 KM 1.600 TO KM 80.000 IN THE STATE OF TAMIL NADU UNDER NHDP PHASE-III ON DBFOT (ANNUITY) BASIS
Corrigendum, Revised RFQ

11th  January
2010

59.

Four laning of Jetpur-Somnath Section of NH-8D from km. 0.000 to km. 127.000 (Length 127.00 km.) in the State of Gujarat to be executed as BOT (Annuity) Project under NHDP Phase III on BOT(Annuity) on DBFOT Pattern.
Corrigendum

11th  January
2010

60.

Request for proposal for empanelment of Financial Consultant for BOT (Toll) / BOT (Annuity), OMT, SARDP (NE) and other Projects being undertaken by National Highways Authority of India.
Corrigendum, Replies of Queries

11th  January
2010

61.

Periodical Repair of the stretches (A) Bagdogra-Siliguri section from Km. 562 to Km. 563 and Km. 565.50 to Km. 566.00 of NH-31 in the state of West Bengal. (B) Siliguri-Jalpaiguri section from Km. 87.00 to Km. 97.00 existing chainage of SH-12A or Km. 11.05 to Km. 21.05 of NH-31 D in the state of West Bengal.
Vol-I, Vol-II

11th  January
2010

62.

Two laning of Jhansi - Khajuraho section of NH-75 from km 1.900 to km 165.950 in the State of Madhya Pradesh/ UP under DBFOT (Annuity) Basis.
RFQ, Extend Due Date

11th  January
2010

63.

Supervision Consultancy Services for Flood damage repairs to NHAI roads due to South West Monsoon in the State of Tamil Nadu.
NIT, RFP

9th  January
2010

64.

INVITATION FOR SHORTLISTING OF CONSULTANTS
Invitation

9th  January
2010

65.

Balance Work of 4 laning of Nagpur – Hyderabad Section of NH – 7 from km 94.000 to km 123.000 in the State of Maharashtra [Contract Package No. NS-60(MH)-Bal]
Vol-I, Vol-II,Vol-III

8th  January
2010

66.

2/4 Laning Of Ambala Kaithal Section From Km 5.00 To Km 77.80 Of NH-65 To Be Executed As BOT (Annuity) Project On DBFO Pattern Under NHDP Phase III In The State Of Haryana.
Amendment

8th  January
2010

67.

2/4 laning of Rohtak Jind Section from km 302.670 to km 352.250 of NH-71 to be executed as BOT (Annuity) project on DBFO Pattern under NHDP Phase III in the State of Haryana Project.
Amendment

8th  January
2010

68.

Balance Work of 4 laning of Nagpur – Hyderabad Section of NH – 7 from km 94.000 to km 123.000 in the State of Maharashtra [Contract Package No. NS-60(MH)-Bal]
NIT

8th  January
2010

69.

RFP for Development of Eastern Peripheral Expressway (National Highway No. NE-II) from km 0.00 to km 135.00 (starting from Km 36.083 on NH – I and ending at Km 64.330 on NH – 2) in the states of Haryana and Uttar Pradesh to be executed as BOT (Toll) project on DBFOT Pattern.
Extend Due Date

8th  January
2010

70.

Result for Appointment of Jr. Hindi Translator.
Result

7th  January
2010

71.

Independent Consultancy services for Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Hyderabad-Vijayawada Section from Km 40.000 to Km 221.500 of NH-9 in the state of Andhra Pradesh under NHDP Phase-III (Package No.NHDP-III/BOT/AP/01).
Reply to Queries

7th  January
2010

72.

EMPANELMENT OF USER FEE AUDITOR AT SRIRAMPUR TOLL PLAZA AT 4TH KM OF NH-5A (CHANDIKHOL-PARADIP STRETCH) IN THE STATE OF ORISSA ON NH-5A .
Bid Document

7th  January
2010

73.

Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of Ner Chowk- Manali Section of NH-21 under NHDP-IVB.
RFP

7th  January
2010

74.

Providing and fixing boundary pillars in the state of Haryana and UP on the proposed ROW of six laning of NH-2 from km 20.500 to Km 199.600.
Corrigendum

6th  January
2010

75.

Invitation of proposals for hiring of Supervision Consultancy Services for flood damage repairs to NHAI roads due to South West Monsoon in the State of Tamil Nadu.
NIT, RFP

6th  January
2010

76.

2/4 laning of Reengus Sikar Section of NH-11 to be executed as BOT(TOLL) Project on DBFOT pattern under Phase III in the State of Rajasthan.
Cancellation

6th  January
2010

77.

4 laning of Reengus Sikar section of NH-11 from existing chainage km. 298.075 (proposed chainage Km. 297.850) to existing chainage km. 341.047 (proposed chainage km. 342.100) as identified to be developed on BOT(Annuity) on DBFOT pattern under NHDP III in the State of Rajasthan.
NIT, RFQ

6th  January
2010

78.

Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km) in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern
Pre Bid Meeting

6th  January
2010

79.

Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of Kolhapur – Sangli – Sholapur – Latur – Nanded – Wardha – Nagpur section of NH-7 & SH-6 in the state of Maharashtra.
Extend Due Date

5th  January
2010

80.

FOUR/SIX LANING OF SOLAPUR-MAHARASHTRA/KARNATAKA BORDER SECTION OF NH – 13 FROM KM 0.000 TO KM 30.450 IN THE STATE OF MAHARASHTRA TO BE EXECUTED AS BOT (TOLL) ON DBFO PATTERN UNDER NHDP PHASE –III(Package No. : NHAI/ NHDP-III/MAHA/BOT/SMK)
NIT, RFP

5th  January
2010

81.

Consultancy Services for Feasibility study and Preparation of Detailed Project Report for widening/six laning/up gradation of existing four lanned section of Narmada bridge & its approaches from Km. 192.00 to 198.00 on Ahmedabad-Mumbai Section of NH-8 and value addition works to Vadodara to Bharuch & Bharuch to Surat Section of NH-8. Extend Due Date

5th  January
2010

82.

Supply, Installation, Commissioning and Maintenance of Computers & Peripherals for the upcoming Toll Plaza @ Km.18+652 & Km.74+930 of Madurai to Kovilpatti Section (NH-7) of North-South Corridor in the state of TamilNadu.
NIT, Bid Document

5th  January
2010

83.

PROVIDING SERVICES OF TECHNICAL MANPOWER VIZ NETWORK/ SYSTEM ADMINISTRATOR AND DESKTOP ADMINISTRATOR TO MAINTAIN COMPUTER HARDWARE, NETWORKING, CABLING & UPS etc. FOR ANEWADI AND KHEDSHIVAPUR TOLL PLAZAS AT KM 748/600 AND 819.240 of NH-4 IN THE STATE OF MAHARASHRA.
Bid Document

5th  January
2010

84.

INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE WORK OF DESIGN, ENGINEERING, FINANCE, PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF “4 LANING OF INDORE-MP/GUJARAT BORDER OF NH 59 FROM KM 9.500 TO KM 171” IN THE STATE. OF MADHYA PRADESH UNDER NHDP PHASE III ON DBFOT BASIS.
EOI

5th  January
2010

85.

Incident Management of Amravati Bypass in Km.149.20 to Km.167.22 of NH-6 in the State of Maharashtra.
NIT

4th  January
2010

86.

Scope of work for engaging manpower for the post of Network/Server Administrator (04 nos) and Desktop Engineer (04nos) to maintain Hardware, Networking, CISCO Switches, routers, cabling, UPS etc., for User fee plaza at Km.464.774 of Hyderabad-Bangalore Section of NH-7 near Bagepalli in the State of Karnataka).
Bid Document

4th  January
2010

87.

RENOVATION TO THE 1ST FLOOR OF THE SETU BHAVAN FOR ACCOMMODATION OF STATE LEVEL OFFICE, ORISSA AND PIU, BHUBANESWAR – BLOCK – I : ELECTRICAL WORKS FOR STATE LEVEL OFFICE.
Letter, Bid Document-I
RENOVATION TO THE 1ST FLOOR OF THE SETU BHAVAN FOR ACCOMMODATION OF STATE LEVEL OFFICE, ORISSA AND PIU, BHUBANESWAR – BLOCK – I : CIVIL WORKS OF STATE LEVEL OFFICE.
  Bid Document-II

RENOVATION TO THE 1ST FLOOR OF THE SETU BHAVAN FOR ACCOMMODATION OF STATE LEVEL OFFICE, ORISSA AND PIU, BHUBANESWAR – BLOCK – II : CIVIL WORKS TECHNICAL SECTION.
  Bid Document-III

RENOVATION TO THE 1ST FLOOR OF THE SETU BHAVAN FOR ACCOMMODATION OF STATE LEVEL OFFICE, ORISSA AND PIU, BHUBANESWAR – BLOCK – II : ELECTRICAL WORKS TECHNICAL OFFICE SECTION.
  Bid Document-IV

RENOVATION TO THE 1ST FLOOR OF THE SETU BHAVAN FOR ACCOMMODATION OF STATE LEVEL OFFICE, ORISSA AND PIU, BHUBANESWAR – BLOCK – III : CIVIL WORKS ACCOUNTS SECTION & CONFERENCE HALL .
  Bid Document-V

RENOVATION TO THE 1ST FLOOR OF THE SETU BHAVAN FOR ACCOMMODATION OF STATE LEVEL OFFICE, ORISSA AND PIU, BHUBANESWAR – BLOCK – III : ELECTRICAL WORKS FOR ACCOUNTS SECTION & CONFERENCE HALL.
  Bid Document-VI

RENOVATION TO THE 1ST FLOOR OF THE SETU BHAVAN FOR ACCOMMODATION OF STATE LEVEL OFFICE, ORISSA AND PIU, BHUBANESWAR – PART – A : LAN & WAN. 
Bid Document-VII

4th  January
2010

88.

Collection of USER Fee through private contractor on the basis of competitive bidding at Km. 399.000 (SIKANDRA TOLL PLAZA) for Km. 396.177 to Km. 457.377 Section of the National Highway No. NH-2
Corrigendum

1st  January
2010

89.

Collection of USER Fee through private contractor on the basis of competitive bidding at Km. 506.262 (PURWAMEER TOLL PLAZA) FOR KM. 457.377 TO KM. 508.877Section of the National Highway No. NH-2
Corrigendum

1st  January
2010

90.

Collection of USER Fee through private contractor on the basis of competitive bidding at Km. 75.00 (Srinagar near Palwal) for Km. 18.80 to Km. 108.90 on Badarpur – Kosi Section of the National Highway No. 02 (hereinafter referred to as the said section of the National Highway).
Corrigendum - III

1st  January
2010

91.

Collection of USER Fee through private contractor on the basis of competitive bidding at Km . 164.50 (Mahuvan) for Km. 108.90 to Km. 199.00 on Kosi – Agra Section of the National Highway No. 02 (hereinafter referred to as the said section of the National Highway).
Corrigendum - III

1st  January
2010
You need Acrobat Reader to view pdf documents.