1.
|
Invitation of RFP for Two/Four-laning of Purnea-Khagaria section of NH-31 from km 270.00 to km 410.00 in the State of Bihar under NHDP Phase-III on BOT (Toll) Basis
Letter,
RFP
|
30th January 2010 |
|
2.
|
RFP for Four/Two Laning of Rimuli-Roxy-Rajamunda Section of NH 215 from km 163.00 to km 269.00 (design chainage Km 163.00 to Km 259.453) in the State of Orissa to be executed as BOT (Toll) Project on DBFOT Pattern under NHDP Phase III Project
Letter,
RFP
|
30th January 2010 |
|
3.
|
Four/Two Laning of Chandikhole-Dubari-Talcher Section of NH 200 from Km 301.890 to km 428.030 in the State of Orissa to be executed as BOT (Toll) project on DBFOT Pattern under NHDP Phase III Invitation to the pre-qualified Applicants for RFP- reg.
Letter,
RFP
|
30th January 2010 |
|
4.
|
Consultancy Services for Preparation of Feasibility study for
Six lanning of Ahemdabad - Bamanbore - Samakhiali & Bamanbore - Rajkot section of NH - 8A & 8B in
the state of Gujarat (approx. length 338 km.) - Mega Infrastructure Highway Project.
Corrigendum,
EOT
,
Replies of Queries
|
29th January 2010 |
|
5.
|
Supply, Installation, Commissioning and Maintenance of Computers & Peripherals for the upcoming Toll Plaza @ Km.18+652 & Km.74+930 of Madurai to Kovilpatti Section (NH-7) of North-South Corridor in the state of TamilNadu.
NIT,
Bid Document,
Annexure
|
29th January 2010 |
|
6.
|
Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km)
in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern
Feasibility Study,
Strip Plan
|
29th January 2010 |
|
7.
|
2 Laning of Rohtak Hissar section from km 87.000 to km 170.00 of NH-10 to be executed as BOT(Toll) Project on DBFO Pattern under NHDP Phase III in the State of Haryana.
NIT,
RFQ
|
29th January 2010 |
|
8.
|
FOUR/SIX LANING OF SOLAPUR-MAHARASHTRA/KARNATAKA BORDER SECTION OF NH 13 FROM KM 0.000 TO KM 30.450 IN THE STATE OF MAHARASHTRA TO BE EXECUTED AS BOT
(TOLL) ON DBFO PATTERN UNDER NHDP PHASE III(Package No. : NHAI/ NHDP-III/MAHA/BOT/SMK)
Extended Due Date
|
28th January 2010 |
|
9.
|
Four/Two Laning of Panikoili - Rimuli Section from Km 00.00 to km 163.00 of NH-215 in the State of Orissa to be executed as BOT (Toll) project on DBFOT Pattern under NHDP Phase III Invitation to the pre-qualified Applicant for RFP- reg.
Letter,
RFP
|
28th January 2010 |
|
10.
|
Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km)
in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern
Extended Due Date-II
|
27th January 2010 |
|
11.
|
Six-Laning of Icchapuram-Srikakulam-Vishakhapatnam-Ankapalli-Rajahmundary Section of NH-5 From Km 470.000 to Km 901.753 (Length 436km)in the State of Andhra Pradesh to be executed as Bot (Toll) on DBFOT Pattern Under Mega Infrastructure Highway Project NHDP Phase V.
Corrigendum IV
|
27th January 2010 |
|
12.
|
Appointment of Safety Consultants for PPP Projects on DBFO basis
RFP,
Schedules
|
27th January 2010 |
|
13.
|
Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of Ner Chowk- Manali Section of NH-21 under NHDP-IVB in state of Himachal Pradesh.
Amendment,
Prebid meeting
|
27th January 2010 |
|
14.
|
Invitation of RFP for two/ four laning of the existing Patna Buxar Section of NH-30 from Km 181.300 to Km 117.00 & NH-84 from Km 0.00 to Km 75.00 in the State of Bihar under NHDP Phase-III on BOT (Toll) Basis.
Letter,
Bid Document,
Schedule
|
27th January 2010 |
|
15.
|
Hiring of vehicles on monthly basis and day-to-day basis.
NIT
|
27th January 2010 |
|
16.
|
Design, Engineering, Construction, Development, Finance, Operation and Maintenance for Four-laning of Krishnagar - Baharampore Section of NH- 34 (km. 115.000 to km. 193.000) in the State of West Bengal under NHDP Phase III on BOT (Annuity) basis on DBFOT Pattern.
Cover Page,
RFP
|
27th January 2010 |
|
17.
|
Consultancy Services for Feasibility study and Preparation of Detailed Project Report for widening/six laning/up gradation of
existing four lanned section of Narmada bridge & its approaches from Km. 192.00 to 198.00 on Ahmedabad-Mumbai Section of NH-8
and value addition works to Vadodara to Bharuch & Bharuch to Surat Section of NH-8.
Corrigendum,
Replies of Queries
|
27th January 2010 |
|
18.
|
Up- gradation of Andheria More to Delhi/Haryana Border section of Mehrauli-Gurgaon Highway in NCT of Delhi Contract Package- MG/01/2010.
BOQ
|
27th January 2010 |
|
19.
|
FOUR LANING OF KUTTIPURAM - EDAPALLY SECTION OF NH-17 FROM KM 318+000 TO KM 438+600 UNDER NHDP PHASE III IN THE STATE OF KERALA ON DBFOT BASIS.
Addendum-I,
Addendum-II,
Addendum-III,
Replies Prebid Queries
|
23rd January 2010 |
|
20.
|
MAKING TEMPORARY ARRANGMENT FOR TOLL COLLECTION AT KM 74+930 & KM 125+735 OF NH-7 CONSTRUCTION PACKAGE NS-40/TN & NS-41/TN VIRUDHUNAGAR TO KAYATHAR SECTION (NH-7) OF NORTH SOUTH CORRIDOR IN THE STATE OF TAMILNADU.
Corrigendum-II
|
23rd January 2010 |
|
21.
|
Two laning of Jhansi - Khajuraho section of NH-75 from km 1.900 to km 165.950 in the State of Madhya Pradesh/ UP under DBFOT (Annuity) Basis.
RFQ on BOT (Toll)
Corrigendum
|
22nd January 2010 |
|
22.
|
Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km)
in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern
Pre Bid Meeting
|
22nd January 2010 |
|
23.
|
Four Laning of Up/Haryana Border-Yamunanagar-Saha-Barwala-Panchkula Section of NH-73 From Km 71.640 to Km 179.285 in the State of Haryana Under NHDP Phase III on Design, Build, Finance, Operate And Transfer (The DBFOT) Basis.
Schedule
|
21st January 2010 |
|
24.
|
2/4 laning of Rohtak Jind Section from km 302.670
to km 352.250 of NH-71 to be executed
as BOT (Annuity) project on DBFO Pattern under NHDP Phase III in the
State of Haryana Project.
Extended Due Date
|
21st January 2010 |
|
25.
|
2/4 Laning Of Ambala Kaithal Section
From Km 5.00 To Km 77.80 Of NH-65 To Be
Executed As BOT (Annuity) Project On
DBFO Pattern Under NHDP Phase III In The
State Of Haryana.
Extended Due Date
|
21st January 2010 |
|
26.
|
Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km)
in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern
Letter
|
21st January 2010 |
|
27.
|
Balance Work of 4 laning of Nagpur Hyderabad Section of NH 7 from km 94.000 to km 123.000 in the State of Maharashtra [Contract Package No. NS-60(MH)-Bal]
Drawings
|
21st January 2010 |
|
28.
|
PROVIDING SERVICES OF TECHNICAL MANPOWER VIZ NETWORK/ SYSTEM ADMINISTRATOR AND DESKTOP ADMINISTRATOR TO MAINTAIN COMPUTER HARDWARE, NETWORKING, CABLING & UPS etc. FOR ANEWADI AND KHEDSHIVAPUR TOLL PLAZAS AT KM 748/600 AND 819.240 of NH-4 IN THE STATE OF MAHARASHRA.
Bid Document
|
20th January 2010 |
|
29.
|
Up- gradation of Andheria More to Delhi/Haryana Border section of Mehrauli-Gurgaon Highway in NCT of Delhi Contract Package- MG/01/2010.
Vol-I,
Vol-II,
Vol-III
|
19th January 2010 |
|
30.
|
Consultancy Services for Preparation of Detailed Project Report for 6/8 laning with service Roads from Km 10 to Km 20 on Hyderabad-Bangalore section including Improvement of geometrics, etc from Km 22.300 to Km 34.140 on Hyderabad-Bangalore section and from Km 447 to Km 464 on Nagpur-Hyderabad section of NH-7 in the State of Andhra Pradesh.
RFP
|
18th January 2010 |
|
31.
|
Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km)
in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern
Extended Due Date
|
18th January 2010 |
|
32.
|
Four-laning of Panvel Indapur section of NH 17 from km 0.000 to km 84.000 in the State of Maharashtra to be executed as BOT (TOLL) on DBFO Pattern under NHDP Phase III .
Re-Revised RFQ
|
18th January 2010 |
|
33.
|
Four Laning of Up/Haryana Border-Yamunanagar-Saha-Barwala-Panchkula Section of NH-73 From Km 71.640 to Km 179.285 in the State of Haryana Under NHDP Phase III on Design, Build, Finance, Operate And Transfer (The DBFOT) Basis.
Cover Page,
RFP
|
18th January 2010 |
|
34.
|
APPLICATION FORM FOR PROVIDING DOCUMENT MANAGEMENT SERVICES IN NHAI HEAD QUARTERS, DWARKA
Bid Document-I,
Advertisement,
Cover Page,
Bid Document-II
|
18th January 2010 |
|
35.
|
Supply, Installation, Commissioning and Maintenance of Computers & Peripherals for the upcoming Toll Plaza @ Km.18+652 & Km.74+930 of Madurai to Kovilpatti Section (NH-7) of North-South Corridor in the state of TamilNadu.
Corrigendum
|
18th January 2010 |
|
36.
|
Four Laning of Jorbat Shillong (Barapani) Section of NH 40 from km 0.000 to Km. 61.800 of NH- 40 in the State of Assam and Meghalaya
under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis.
Extended Bid Due Date-VIII
|
18th January 2010 |
|
37.
|
Design, Engineering, Construction, Development, Finance, Operation and Maintenance Two Laning of Shillong Bypass Section of NH 40 & NH-44 from Km 61.800 of NH-40 to Km 34.850 of NH-44 in the State of Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis.
Extended Bid Due Date-IX
|
18th January 2010 |
|
38.
|
Supply, Installation, Commissioning and Maintenance of Computers, Printers, Servers, UPS & Peripherals at Srirampur Toll Plaza at 4th Km. on Chandikhole Paradip Section of NH 5A in the State of Orissa.
Bid Document
|
15th January 2010 |
|
39.
|
RFP for Development of Eastern Peripheral Expressway (National Highway No. NE-II) from km 0.00 to km 135.00 (starting from Km 36.083 on NH I and ending at Km 64.330 on NH 2) in the states of Haryana and Uttar Pradesh to be executed as BOT (Toll) project on DBFOT Pattern
Addendum
|
15th January 2010 |
|
40.
|
Periodical Repair of the stretches (A) Bagdogra-Siliguri section from Km. 562 to Km. 563 and Km. 565.50 to Km. 566.00 of NH-31 in the state of West Bengal.
(B) Siliguri-Jalpaiguri section from Km. 87.00 to Km. 97.00 existing chainage of SH-12A or Km. 11.05 to Km. 21.05 of NH-31 D in the state of West Bengal.
Corrigendum
|
15th January 2010 |
|
41.
|
Two laning with paved shoulder of Jabalpur Mandla Chilpi Section of NH-12A from km 3/4 to km 192/4 in the State of Madhya Pradesh on BOT (Annuity) Basis under DBFOT pattern.
NIT
|
15th January 2010 |
|
42.
|
Independent Engineer services for four laning of Armur- Adloor- YellaReddy from Km 308 to km 367 on Nagpur-Hyderabad Section of NH-7 in the State of Andhra Pradesh [Civil Package No.NS2/BOT/AP-1] on DBFOT Basis under NHDP-Phase-II.
RFP
|
15th January 2010 |
|
43.
|
4/6 laning of Maharashtra/Goa Border to Panaji-Goa/Karnataka Border section of NH-17 in the State of Goa under NHDP Phase-III-Reg RFP.
Corrigendum-IV
|
15th January 2010 |
|
44.
|
Two laning with paved shoulder of Jabalpur Mandla - Chilpi
Section of NH-12A from km 3/4 to km 192/4 in the State of Madhya
Pradesh on BOT (Annuity) Basis under DBFOT pattern.
Corrigendum
|
14th January 2010 |
|
45.
|
Invitation of RFQ for OMT Package-3 (Chittorgarh - Kota section of NH-76), Package-4 (Swaroopganj - Pindwada Section of NH-14 & Pindwada- Udaipur Section of NH-76) and Package-5 (Baran - Shivpuri section of NH-76 and Shivpuri-Jhansi section of NH-25).
Invitation Notice,
RFQ
|
14th January 2010 |
|
46.
|
Operation & Maintenance of National Highways
On OMT Basis
Package No. NHAI/OMT/6/2009-10.(Madurai-Tirunelveli- Panagudi
Section (Km 0.00 to Km 211.140)
of NH-7)
Invitation Notice,
RFQ
|
14th January 2010 |
|
47.
|
Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Quazigund - Banihal Section from Km 189.350 to Km 204.700 including two tunnels (2 Lane) of 0.69 kms and 8.45 kms of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/II/J&K)Project on BOT (Annuity) basis.
Corrigendum,
Reply to Queries
|
13th January 2010 |
|
48.
|
Rehabilitation, Strengthening and Four Laning of Ramban to Banihal Section of NH-1A, from Km 151.000 to Km 187.000 on BOT (Annuity) basis on DBFO pattern in the State of Jammu & Kashmir (Package No.
NHDP-Phase-II/BOT/I/J&K)Project.
Corrigendum,
Reply to Queries
|
13th January 2010 |
|
49.
|
Rehabilitation, Strengthening and Four Laning of Udhampur to Ramban Section of NH-1A, from Km 67.00 to Km 89.00 and Km 130.00 to Km 151.00 on BOT (Annuity) basis on DBFO Pattern, in the State of Jammu & Kashmir (Pkg No:- NHDP-Phase-II/BOT/IV/J&K) Project
Corrigendum,
Reply to Queries
|
13th January 2010 |
|
50.
|
Consultancy Services for Feasibility Study and Detailed Project Report for 4/6 laning of Jabalpur-Rewa Section of National Highway No. 07 in the State of Madhya Pradesh.
Reply of Pre Bid Queries
|
13th January 2010 |
|
51.
|
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE WORK OF DESIGN, ENGINEERING, FINANCE, PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF 4 laning of Cherthalai - Ochira Section of NH 47 from Km 379.100 to Km 465.000 AND 4 laning of Ochira Thiruvananthapuram Section of NH 47 from Km 465.000 to Km 551.900IN THE STATE OF KERALA UNDER NHDP PHASE III ON DBFOT BASIS.
EOI,
Extend Due Date
|
13th January 2010 |
|
52.
|
Rehabilitation, Strengthening and Four Laning of Srinagar to Banihal Section from Km 187.000 to Km 189.350
(Banihal Bypass) and Km 220.700 to Km 286.110 of NH 1-A in the State of Jammu & Kashmir (Package No.
NHDP-Phase-II/BOT/I/J&K)Project.
Replies to Queries,
Corrigendum
|
13th January 2010 |
|
53.
|
Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km)
in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern
Pre Qualified Bidders
|
12th January 2010 |
|
54.
|
Six laning of Tumkur- Chitradurga section (excluding Tumkur & Chitradurga Bypass ) from km 75.00 to km 189.00 of NH-4 (approx 114.00 km ) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V.
Amendment-III
|
12th January 2010 |
|
55.
|
Consultancy Services for Preparation of Feasibility Study Report for Rehabilitation and Upgrading to 4 lane with paved shoulders configuration of Gwalior Dewas section of NH-3 in the State of Madhya Pradesh .
Letter,
Payment Schedule,
TOR
|
12th January 2010 |
|
56.
|
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR
INDEPENDENT ENGINEER FOR THE FOUR LANING OF MUZAFFARNAGAR-HARIDWAR AND HARIDWAR DEHRADUN SECTIONS OF NH-58 AND 72 IN THE STATES OF UTTAR PRADESH AND UTTARAKHAND UNDER NHDP PHASE-III ON DBFOT BASIS.
NIT,
EOI
|
11th January 2010 |
|
57.
|
Six laning of Belgaum Dharwad Section of NH-4 km 433.00 to km 515.00 (length 79.36 km) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V.
Amendment-III |
11th January 2010 |
|
58.
|
2-LANING WITH PAVED SHOULDERS OF NAGAPATNAM -THANJAVUR SECTION OF NH-67 KM 1.600 TO KM 80.000 IN THE STATE OF TAMIL NADU UNDER NHDP PHASE-III ON DBFOT (ANNUITY) BASIS
Corrigendum,
Revised RFQ
|
11th January 2010 |
|
59.
|
Four laning of Jetpur-Somnath Section of NH-8D from km. 0.000 to
km. 127.000 (Length 127.00 km.) in the State of Gujarat to be
executed as BOT (Annuity) Project under NHDP Phase III on
BOT(Annuity) on DBFOT Pattern.
Corrigendum
|
11th January 2010 |
|
60.
|
Request for proposal for empanelment of Financial Consultant for BOT (Toll) / BOT (Annuity), OMT, SARDP (NE) and other Projects being undertaken by National Highways Authority of India.
Corrigendum,
Replies of Queries
|
11th January 2010 |
|
61.
|
Periodical Repair of the stretches (A) Bagdogra-Siliguri section from Km. 562 to Km. 563 and Km. 565.50 to Km. 566.00 of NH-31 in the state of West Bengal.
(B) Siliguri-Jalpaiguri section from Km. 87.00 to Km. 97.00 existing chainage of SH-12A or Km. 11.05 to Km. 21.05 of NH-31 D in the state of West Bengal.
Vol-I,
Vol-II
|
11th January 2010 |
|
62.
|
Two laning of Jhansi - Khajuraho section of NH-75 from km 1.900 to km 165.950 in the State of Madhya Pradesh/ UP under DBFOT (Annuity) Basis.
RFQ,
Extend Due Date
|
11th January 2010 |
|
63.
|
Supervision Consultancy Services for Flood damage repairs to NHAI roads due to South West Monsoon in the State of Tamil Nadu.
NIT,
RFP
|
9th January 2010 |
|
64.
|
INVITATION FOR SHORTLISTING OF CONSULTANTS
Invitation
|
9th January 2010 |
|
65.
|
Balance Work of 4 laning of Nagpur Hyderabad Section of NH 7 from km 94.000 to km 123.000 in the State of Maharashtra [Contract Package No. NS-60(MH)-Bal]
Vol-I,
Vol-II,Vol-III
|
8th January 2010 |
|
66.
|
2/4 Laning Of Ambala Kaithal Section
From Km 5.00 To Km 77.80 Of NH-65 To Be
Executed As BOT (Annuity) Project On
DBFO Pattern Under NHDP Phase III In The
State Of Haryana.
Amendment
|
8th January 2010 |
|
67.
|
2/4 laning of Rohtak Jind Section from km 302.670
to km 352.250 of NH-71 to be executed
as BOT (Annuity) project on DBFO Pattern under NHDP Phase III in the
State of Haryana Project.
Amendment
|
8th January 2010 |
|
68.
|
Balance Work of 4 laning of Nagpur Hyderabad Section of NH 7 from km 94.000 to km 123.000 in the State of Maharashtra [Contract Package No. NS-60(MH)-Bal]
NIT
|
8th January 2010 |
|
69.
|
RFP for Development of Eastern Peripheral Expressway (National Highway No. NE-II) from km 0.00 to km 135.00 (starting from Km 36.083 on NH I and ending at Km 64.330 on NH 2) in the states of Haryana and Uttar Pradesh to be executed as BOT (Toll) project on DBFOT Pattern.
Extend Due Date
|
8th January 2010 |
|
70.
|
Result for Appointment of Jr. Hindi Translator.
Result
|
7th January 2010 |
|
71.
|
Independent Consultancy services for Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Hyderabad-Vijayawada Section from Km 40.000 to Km 221.500 of NH-9 in the state of Andhra Pradesh under NHDP Phase-III (Package No.NHDP-III/BOT/AP/01).
Reply to Queries
|
7th January 2010 |
|
72.
|
EMPANELMENT OF USER FEE AUDITOR AT SRIRAMPUR TOLL PLAZA AT 4TH KM OF NH-5A (CHANDIKHOL-PARADIP STRETCH) IN THE STATE OF ORISSA ON NH-5A .
Bid Document
|
7th January 2010 |
|
73.
|
Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of Ner Chowk- Manali Section of NH-21 under NHDP-IVB.
RFP
|
7th January 2010 |
|
74.
|
Providing and fixing boundary pillars in the state of Haryana and UP on the proposed
ROW of six laning of NH-2 from km 20.500 to Km 199.600.
Corrigendum
|
6th January 2010 |
|
75.
|
Invitation of proposals for hiring of Supervision Consultancy Services for flood damage repairs to NHAI roads due to South West Monsoon in the State of Tamil Nadu.
NIT,
RFP
|
6th January 2010 |
|
76.
|
2/4 laning of Reengus Sikar Section of NH-11 to be executed as
BOT(TOLL) Project on DBFOT pattern under Phase III in the State of Rajasthan.
Cancellation
6th January 2010 | |
|
77.
|
4 laning of Reengus Sikar section of NH-11 from existing chainage km. 298.075 (proposed chainage Km. 297.850) to existing chainage km. 341.047 (proposed chainage km. 342.100) as identified to be developed on BOT(Annuity) on DBFOT pattern under NHDP III in the State of Rajasthan.
NIT,
RFQ
|
6th January 2010 |
|
78.
|
Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km)
in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern
Pre Bid Meeting
|
6th January 2010 |
|
79.
|
Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of Kolhapur Sangli Sholapur Latur Nanded Wardha Nagpur section of NH-7 & SH-6 in the state of Maharashtra.
Extend Due Date
|
5th January 2010 |
|
80.
|
FOUR/SIX LANING OF SOLAPUR-MAHARASHTRA/KARNATAKA BORDER SECTION OF NH 13 FROM KM 0.000 TO KM 30.450 IN THE STATE OF MAHARASHTRA TO BE EXECUTED AS BOT
(TOLL) ON DBFO PATTERN UNDER NHDP PHASE III(Package No. : NHAI/ NHDP-III/MAHA/BOT/SMK)
NIT,
RFP
|
5th January 2010 |
|
81.
|
Consultancy Services for Feasibility study and Preparation of Detailed Project Report for widening/six laning/up gradation of
existing four lanned section of Narmada bridge & its approaches from Km. 192.00 to 198.00 on Ahmedabad-Mumbai Section of NH-8
and value addition works to Vadodara to Bharuch & Bharuch to Surat Section of NH-8.
Extend Due Date
|
5th January 2010 |
|
82.
|
Supply, Installation, Commissioning and Maintenance of Computers & Peripherals for the upcoming Toll Plaza @ Km.18+652 & Km.74+930 of Madurai to Kovilpatti Section (NH-7) of North-South Corridor in the state of TamilNadu.
NIT,
Bid Document
|
5th January 2010 |
|
83.
|
PROVIDING SERVICES OF TECHNICAL MANPOWER VIZ NETWORK/ SYSTEM ADMINISTRATOR AND DESKTOP ADMINISTRATOR TO MAINTAIN COMPUTER HARDWARE, NETWORKING, CABLING & UPS etc. FOR ANEWADI AND KHEDSHIVAPUR TOLL PLAZAS AT KM 748/600 AND 819.240 of NH-4 IN THE STATE OF MAHARASHRA.
Bid Document
|
5th January 2010 |
|
84.
|
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE WORK OF DESIGN, ENGINEERING, FINANCE, PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF 4 LANING OF INDORE-MP/GUJARAT BORDER OF NH 59 FROM KM 9.500 TO KM 171 IN THE STATE. OF MADHYA PRADESH UNDER NHDP PHASE III ON DBFOT BASIS.
EOI |
5th January 2010 |
|
85.
|
Incident Management of Amravati Bypass in Km.149.20 to Km.167.22 of NH-6 in the State of Maharashtra.
NIT
|
4th January 2010 |
|
86.
|
Scope of work for engaging manpower for the post of Network/Server Administrator (04 nos) and Desktop Engineer (04nos) to maintain Hardware, Networking, CISCO Switches, routers, cabling, UPS etc., for User fee plaza at Km.464.774 of Hyderabad-Bangalore Section of NH-7 near Bagepalli in the State of Karnataka).
Bid Document
|
4th January 2010 |
|
87.
|
RENOVATION TO THE 1ST FLOOR OF THE SETU BHAVAN FOR ACCOMMODATION OF STATE LEVEL OFFICE, ORISSA AND PIU, BHUBANESWAR BLOCK I : ELECTRICAL WORKS FOR STATE LEVEL OFFICE.
Letter,
Bid Document-I
RENOVATION TO THE 1ST FLOOR OF THE SETU BHAVAN FOR ACCOMMODATION OF STATE LEVEL OFFICE, ORISSA AND PIU, BHUBANESWAR BLOCK I : CIVIL WORKS OF STATE LEVEL OFFICE.
Bid Document-II
RENOVATION TO THE 1ST FLOOR OF THE SETU BHAVAN FOR ACCOMMODATION OF STATE LEVEL OFFICE, ORISSA AND PIU, BHUBANESWAR BLOCK II : CIVIL WORKS TECHNICAL SECTION.
Bid Document-III
RENOVATION TO THE 1ST FLOOR OF THE SETU BHAVAN FOR ACCOMMODATION OF STATE LEVEL OFFICE, ORISSA AND PIU, BHUBANESWAR BLOCK II : ELECTRICAL WORKS TECHNICAL OFFICE SECTION.
Bid Document-IV
RENOVATION TO THE 1ST FLOOR OF THE SETU BHAVAN FOR ACCOMMODATION OF STATE LEVEL OFFICE, ORISSA AND PIU, BHUBANESWAR BLOCK III : CIVIL WORKS ACCOUNTS SECTION & CONFERENCE HALL .
Bid Document-V
RENOVATION TO THE 1ST FLOOR OF THE SETU BHAVAN FOR ACCOMMODATION OF STATE LEVEL OFFICE, ORISSA AND PIU, BHUBANESWAR BLOCK III : ELECTRICAL WORKS FOR ACCOUNTS SECTION & CONFERENCE HALL.
Bid Document-VI
RENOVATION TO THE 1ST FLOOR OF THE SETU BHAVAN FOR ACCOMMODATION OF STATE LEVEL OFFICE, ORISSA AND PIU, BHUBANESWAR PART A : LAN & WAN.
Bid Document-VII
|
4th January 2010 |
|
88.
|
Collection of USER Fee through private contractor on the basis of competitive bidding at Km. 399.000 (SIKANDRA TOLL PLAZA)
for Km. 396.177 to Km. 457.377 Section of the National Highway No. NH-2
Corrigendum
|
1st January 2010 |
|
89.
|
Collection of USER Fee through private contractor on the basis of competitive bidding at Km. 506.262 (PURWAMEER TOLL PLAZA)
FOR KM. 457.377 TO KM. 508.877Section of the National Highway No. NH-2
Corrigendum
|
1st January 2010 |
|
90.
|
Collection of USER Fee through private contractor on the basis of competitive bidding at Km. 75.00 (Srinagar near Palwal) for Km. 18.80 to Km. 108.90 on Badarpur Kosi Section of the National Highway No. 02 (hereinafter referred to as the said section of the National Highway).
Corrigendum - III
|
1st January 2010 |
|
91.
|
Collection of USER Fee through private contractor on the basis of competitive bidding at Km . 164.50 (Mahuvan) for Km. 108.90 to Km. 199.00 on Kosi Agra Section of the National Highway No. 02 (hereinafter referred to as the said section of the National Highway).
Corrigendum - III
|
1st January 2010 |