|
1.
|
Application for the post of DGM (Tech) on Deputation basis
Interview
|
27th February 2010 |
|
2.
|
2 Laning of Rohtak Hissar section from km 87.000 to km 170.00 of NH-10 to be executed as BOT(Toll) Project on DBFO Pattern under NHDP Phase III in the State of Haryana.
.
Extended Due Date
|
26th February 2010 |
|
3.
|
Consultancy Services for Feasibility and Preparation of Detailed Project Report for flyovers at four junctions on NH-47, Cochin at Edapally, Palarivattom , Vytilla and Kundanoor Junctions.
RFP
|
26th February 2010 |
|
4.
|
Consultancy Services for Feasibility and Preparation of Detailed Project Report for flyovers at four junctions on NH-47, Cochin at Edapally, Palarivattom , Vytilla and Kundanoor Junctions.
RFP
|
26th February 2010 |
|
5.
|
Comprehensive operation and maintenance of electrical works on JNPT Package-I & II reg.
Notice, Bid Document
|
26th February 2010 |
|
6.
|
Rehabilitation and Upgrading of existing intermediate lane roads to 2 lane with paved shoulders of Forbesganj Jogbani (km 0.000 to km 9.258) on NH-57A in the state of Bihar under NHDP Phase III on DBFOT Annuity basis Project.
Extended Due Date,
Addendum
|
26th February 2010 |
|
7.
|
Two Laning of Piprakothi Raxaul Section of NH 28A (From km 0.600 to km 62.064) and construction of 2- Lane Link Road from km 62.064 to ICP Raxaul (7.33 km length) in the state of Bihar under NHDP phase III on Design, Build, Finance, Operate and Transfer on BOT (Toll) basis.
Extended Due Date,
Addendum
|
26th February 2010 |
|
8.
|
Invitation of RFP for two/ four laning of the existing Patna Buxar Section of NH-30 from Km 181.300 to Km 117.00 & NH-84 from Km 0.00 to Km 75.00 in the State of Bihar under NHDP Phase-III on BOT (Toll) Basis.
Addendum
|
26th February 2010 |
|
9.
|
PROVIDING SERVICES OF TECHNICAL MANPOWER VIZ NETWORK/ SYSTEM ADMINISTRATOR(03 Nos) AND DESKTOP ADMINISTRATOR (03Nos) TO MAINTAIN COMPUTER HARDWARE, NETWORKING, CABLING & UPS etc. AT PROPOSED FEE PLAZA AT Km.121.975 ON NH-24 IN THE STATE OF UTTAR PRADESH.
Corrigendum |
26th February 2010 |
|
10.
|
Supply, Installation, Testing and Commissioning of 25 Mtr High Mast light at proposed Toll Plaza in Km 121.975 of NH-24 in the state of Uttar Pradesh.
Corrigendum |
26th February 2010 |
|
11.
|
Supply, Installation, Commissioning and Maintenance of Computers & Peripherals at proposed Fee Plaza in Km 121.975 of NH-24 in the state of Uttar Pradesh
Corrigendum |
26th February 2010 |
|
12.
|
Providing Incident Management comprising Providing, Running & Maintenance of Route Patrol vehicles, ambulance & crane services on NH-24 (from Km 93.00 to Km. 149.250) in the State of Uttar Pradesh.
Corrigendum
|
26th February 2010 |
|
13.
|
Supply, Installation, Commissioning and Maintenance of Computers & Peripherals at proposed Fee Plaza in Km 121.975 of NH-24 in the state of Uttar Pradesh
Corrigendum
|
26th February 2010 |
|
14.
|
Four Laning of Karnataka/Kerala Border - Kannur Section of NH-17 under NHDP Phase-III in the state of Kerala on DBFOT(Toll) Basis.
RFP
|
26th February 2010 |
|
15.
|
Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of Kolhapur Sangli Sholapur Latur Nanded Wardha Nagpur section of NH-7 & SH-6 in the state of
Maharashtra.
Extend Due Date-IV
|
26th February 2010 |
|
16.
|
RFP for Four Laning of Patna to Bakhtiyarpur section of NH 30 from Km 181.300 to Km 231.950 in the State of Bihar on BOT (Toll) project on DBFO pattern under NHDP Phase III Project.
Letter
|
26th February 2010 |
|
17.
|
Four Laning of Karnataka/Kerala Border - Kannur Section of NH-17 under NHDP Phase-III in the state of Kerala on DBFOT(Toll) Basis.
RFP
|
26th February 2010 |
|
18.
|
Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of Kolhapur Sangli Sholapur Latur Nanded Wardha Nagpur section of NH-7 & SH-6 in the state of
Maharashtra.
Extend Due Date-IV
|
25th February 2010 |
|
19.
|
Six laning of Delhi-Agra Section of NH-2 from km 20.500 to 200.00 on DBFOT (Toll) basis under NHDP V in the State of Haryana & Uttar Pradesh.
Reply to Prebid Queries,
Letter
|
25th February 2010 |
|
20.
|
Construction of two laned R.O.B(Pimpalkhutti ROB) including approaches, Underpassess at Km.173.522 of Nagpur-Hyderabad Section of NH-7 in the State of Maharashtra - Contract Package No.NS-62-A(MH).
IFB,
Vol-I,
Vol-II ,
Vol-III
|
25th February 2010 |
|
21.
|
SHORT TERM IMPROVEMENT AND ROUTINE MAINTENANCE OF CHANDIKHOLE PARADIP SECTION FROM KM. 0.000 TO KM.76.588 ON NH-5A IN THE STATE OF ORISSA.
Bid Document,
BOQ |
25th February 2010 |
|
22.
|
ANNUAL OPERATION & COMPREHENSIVE MAINTENANCE OF AIR CONDITIONING SYSTEM.
Bid Document Technical ,
Bid Document Financial
|
24th February 2010 |
|
23.
|
TENDER FOR MISCELLANEOUS FURNITURE WORKS.
Bid Document Technical ,
Bid Document Financial,
DRAWINGS
|
24th February 2010 |
|
24.
|
PRESS CLIPPING SERVICE FOR NHAI.
Bid Document
|
23rd February 2010 |
|
25.
|
Four/Two Laning of Chandikhole-Dubari-Talcher Section of NH 200 from Km 301.890 to km 428.030 in the State of Orissa to be executed as BOT (Toll) project on DBFOT Pattern under NHDP Phase III Invitation to the pre-qualified Applicants for RFP- reg.
Amendments
|
22nd February 2010 |
|
26.
|
FOUR LANING OF KUTTIPURAM - EDAPALLY SECTION OF NH-17 FROM KM 318+000 TO KM 438+600 UNDER NHDP PHASE III IN THE STATE OF KERALA ON DBFOT BASIS.
RFP Offer letter-II
|
22nd February 2010 |
|
27.
|
RFP for Four/Two Laning of Rimuli-Roxy-Rajamunda Section of NH 215 from km 163.00 to km 269.00 (design chainage Km 163.00 to Km 259.453) in the State of Orissa to be executed as BOT (Toll) Project on DBFOT Pattern under NHDP Phase III Project
Amendment
|
19th February 2010 |
|
28.
|
4 laning of Reengus Sikar section of NH-11 from existing chainage km. 298.075 (proposed chainage Km. 297.850) to existing chainage km. 341.047 (proposed chainage km. 342.100) as identified to be developed on BOT(Annuity) on DBFOT pattern under NHDP III in the State of Rajasthan.
Extended Due Date
|
19th February 2010 |
|
29.
|
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE WORK OF DESIGN, ENGINEERING, FINANCE, PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF 4 laning of Cherthalai - Ochira Section of NH 47 from Km 379.100 to Km 465.000 AND 4 laning of Ochira Thiruvananthapuram Section of NH 47 from Km 465.000 to Km 551.900IN THE STATE OF KERALA UNDER NHDP PHASE III ON DBFOT BASIS.
Amendment
|
19th February 2010 |
|
30.
|
Six-Laning of Icchapuram-Srikakulam-Vishakhapatnam-Ankapalli-Rajahmundary Section of NH-5 From Km 470.000 to Km 901.753 (Length 436km)in the State of Andhra Pradesh to be executed as Bot (Toll) on DBFOT Pattern Under Mega Infrastructure Highway Project NHDP Phase V.
Cancellation of RFQ
|
19th February 2010 |
|
31.
|
Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km)
in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern
Extended Due Date-III
|
19th February 2010 |
|
32.
|
Balance Work of 4 laning of Nagpur Hyderabad Section of NH 7 from km 94.000 to km 123.000 in the State of Maharashtra [Contract Package No. NS-60(MH)-Bal]
Corrigendum-II,
Replies to Pre-bid queries
|
18th February 2010 |
|
33.
|
4/6 laning of Maharashtra/Goa Border to Panaji-Goa/Karnataka Border section of NH-17 in the State of Goa under NHDP Phase-III-Reg RFP.
Addendum-III,
Extension of Bid Due Date - III
|
18th February 2010 |
|
34.
|
Six laning of Tumkur- Chitradurga section (excluding Tumkur & Chitradurga Bypass ) from km 75.00 to km 189.00 of NH-4 (approx 114.00 km ) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V.
Extension of Bid Due Date-IV
|
18th February 2010 |
|
35.
|
Six laning of Belgaum Dharwad Section of NH-4 km 433.00 to km 515.00 (length 79.36 km) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V.
Extension of Bid Due Date-III
|
18th February 2010 |
|
36.
|
Four Laning of Chenani to Nashri Section of NH-1A from Km 89.00 to 130.00 (new alignment) of NH-1A including 9 Km long tunnel (2 lane) with parallel escape tunnel in the State of Jammu & Kashmir (Package No.
NHDP-Phase-II/BOT/V/J&K).
Corrigendum-III
|
18th February 2010 |
|
37.
|
Rehabilitation, Strengthening and Four Laning of Ramban to Banihal Section of NH-1A, from Km 151.000 to Km 187.000 on BOT (Annuity) basis on DBFO pattern in the State of Jammu & Kashmir (Package No.
NHDP-Phase-II/BOT/I/J&K)Project.
Corrigendum-III
|
18th February 2010 |
|
38.
|
Rehabilitation, Strengthening and Four Laning of Jammu to Udhampur Section from Km 15.000 (Jammu Bypass) to Km 67.000 of NH 1-A in the State of Jammu & Kashmir (Package No.
NHDP-Phase-II/BOT/VI/J&K)Project.
Corrigendum-III
|
18th February 2010 |
|
39.
|
Rehabilitation, Strengthening and Four Laning of Udhampur to Ramban Section of NH-1A, from Km 67.00 to Km 89.00 and Km 130.00 to Km 151.00 on BOT (Annuity) basis on DBFO Pattern, in the State of Jammu & Kashmir (Pkg No:- NHDP-Phase-II/BOT/IV/J&K) Project
Corrigendum-III
|
18th February 2010 |
|
40.
|
Rehabilitation, Strengthening and Four Laning of Srinagar to Banihal Section from Km 187.000 to Km 189.350
(Banihal Bypass) and Km 220.700 to Km 286.110 of NH 1-A in the State of Jammu & Kashmir (Package No.
NHDP-Phase-II/BOT/I/J&K)Project.
Corrigendum-III
|
18th February 2010 |
|
41.
|
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE WORK OF 4-laning of Hyderabad-Yadgiri Section from Km 18.600 to Km 54.000 of NH-202 in the state of Andhra Pradesh (Package No. NHDP-III/BOT/AP /04) TO BE EXECUTED AS BOT (TOLL) ON DESIGN, BUILD, FINANCE, OPERATE & TRANSFER (DBFOT) PATTERN UNDER NHDP PHASE-III.
EOI
|
18th February 2010 |
|
42.
|
Improvement of Riding Quality in Km. 73/500 to Km. 151/000 (Selected 34.40 Km) on NH 226 in the State of Tamil Nadu (Contract
No. PIU/Karaikudi/TN/IRQP/09-10/02)
Cover Letter,
Vol-I,
Vol-II
|
17th February 2010 |
|
43.
|
Improvement of Riding Quality Work in selected stretch in Km. 22/0 to Km. 56/0 on NH-226 in the State of Tamil Nadu (Contract No. PIU/Karaikudi/ TN/IRQP/09-10/01)
Cover Letter,
Vol-I,
Vol-II
|
17th February 2010 |
|
44.
|
Four Laning of Pali - Pindwara section of NH-14 from Km 115.000 to Km 244.120 (Approx. Length 129.12 Km) in the State of Rajasthan on BOT (Toll) project on DBFO Pattern under NHDP Phase III.
Letter
|
17th February 2010 |
|
45.
|
Four Laning of Beawar - Pali section of NH-14 from Km 0+000 to Km 115+000 (Approx. Length 115 Km) in the State of Rajasthan on BOT (Toll) project on DBFO Pattern under NHDP Phase III.
Letter
|
17th February 2010 |
|
46.
|
Four laning of Deoli-Kota Section of NH-12 from km. 165.000 to junction of NH-76 on Kota Bypass (Approx. length 83.04 km) in the State of Rajasthan on BOT (Toll) project on DBFOT pattern under NHDP Phase III.
Letter
|
17th February 2010 |
|
47.
|
2/4 Laning Of Ambala Kaithal Section
From Km 5.00 To Km 77.80 Of NH-65 To Be
Executed As BOT (Toll) Project On
DBFO Pattern Under NHDP Phase III In The
State Of Haryana.
Extended Due Date-V
|
17th February 2010 |
|
48.
|
Consultancy Services for Preparation of Detailed Project Report for 6/8 laning with service Roads from Km 10 to Km 20 on Hyderabad-Bangalore section including Improvement of geometrics, etc from Km 22.300 to Km 34.140 on Hyderabad-Bangalore section and from Km 447 to Km 464 on Nagpur-Hyderabad section of NH-7 in the State of Andhra Pradesh.
Corrigendum,
Revised RFP
|
17th February 2010 |
|
49.
|
Recruitment of Personal Assistant on deputation basis.
Recruitment
|
16th February 2010 |
|
50.
|
Recruitment of Asst.Manager(Admin)on deputation basis.
Recruitment
|
16th February 2010 |
|
51.
|
MAKING TEMPORARY ARRANGMENT FOR TOLL COLLECTION AT KM 74+930
& KM 125+735 OF NH-7 CONSTRUCTION PACKAGE NS-40/TN &
NS-41/TN VIRUDHUNAGAR TO KAYATHAR SECTION (NH-7) OF NORTH
SOUTH CORRIDOR IN THE STATE OF TAMILNADU.
Corrigendum-IV
|
16th February 2010 |
|
52.
|
RFP for Six Laning of Varanasi - Aurangabad Section of NH-2 from km 786.000 to km 978.400 (Length 192.400 Km) in the State of Uttar Pradesh and Bihar under NHDP Phase V to be executed as DBFOT (Toll) Project.
Vol-I,
Vol-II,
Vol-III,
Letter
|
16th February 2010 |
|
53.
|
Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km)
in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern
Addendum-II
|
16th February 2010 |
|
54.
|
PROVIDING SERVICES OF TECHNICAL MANPOWER VIZ NETWORK/ SYSTEM ADMINISTRATOR(03 Nos) AND DESKTOP ADMINISTRATOR (03Nos) TO MAINTAIN COMPUTER HARDWARE, NETWORKING, CABLING & UPS etc. AT PROPOSED FEE PLAZA AT Km.121.975 ON NH-24 IN THE STATE OF UTTAR PRADESH.
NIT,
Bid Document
|
15th February 2010 |
|
55.
|
Providing Incident Management comprising Providing, Running & Maintenance of Route Patrol vehicles, ambulance & crane services on NH-24 (from Km 93.00 to Km. 149.250) in the State of Uttar Pradesh.
Cover page,
NIT ,
Bid Document
|
15th February 2010 |
|
56.
|
Supply, Installation, Testing and Commissioning of 25 Mtr High Mast light at proposed Toll Plaza in Km 121.975 of NH-24 in the state of Uttar Pradesh.
NIT,
Bid Document
|
15th February 2010 |
|
57.
|
Supply, Installation, Commissioning and Maintenance of Computers & Peripherals at proposed Fee Plaza in Km 121.975 of NH-24 in the state of Uttar Pradesh
NIT,
RFP
|
15th February 2010 |
|
58.
|
RFP for Four-Laning of Devihalli Hassan Section from km 110.000 to km 189.500 of NH-48 including a new 2-lane with Paved Shoulder Bypass for Channarayanapatna Town and widening of existing Hassan Bypass to 2-lane with Paved Shoulder on DBFOT basis in the State of Karnataka under NHDP Phase IIIA.
Cover Page,
RFP,
Letter
|
15th February 2010 |
|
59.
|
Six laning of Tumkur- Chitradurga section (excluding Tumkur & Chitradurga Bypass ) from km 75.00 to km 189.00 of NH-4 (approx 114.00 km ) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V.
Extension of Bid Due Date-III
|
15th February 2010 |
|
60.
|
Six laning of Belgaum Dharwad Section of NH-4 km 433.00 to km 515.00 (length 79.36 km) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V.
Extension of Bid Due Date-II
|
15th February 2010 |
|
61.
|
FOUR LANING OF KUTTIPURAM - EDAPALLY SECTION OF NH-17 FROM KM 318+000 TO KM 438+600 UNDER NHDP PHASE III IN THE STATE OF KERALA ON DBFOT BASIS.
Addendum-III B
Invitation of RFQ for OMT Package-3 (Chittorgarh - Kota section of NH-76), Package-4 (Swaroopganj - Pindwada Section of NH-14 & Pindwada- Udaipur Section of NH-76) and Package-5 (Baran - Shivpuri section of NH-76 and Shivpuri-Jhansi section of NH-25).
Corrigendum
|
15th February 2010 |
|
62.
|
2/4 laning of Rohtak Jind Section from km 302.670 to km 352.250 of NH-71 to be executed as BOT (Toll) project on DBFO Pattern under NHDP Phase III in the
State of Haryana Project.
Extended Due Date-V ,
Amendment to RFQ
|
15th February 2010 |
|
63.
|
Interview for the recruitment the post of Manager(Tech.)on deputation basis.
Recruitment,
Interview Calls
|
13th February 2010 |
|
64.
|
Design, Engineering, Construction, Development, Finance, Operation and Maintenance
Four Laning of Jorbat Shillong (Barapani) Section of NH 40 from km 0.000 to Km. 61.800 of NH- 40 in the State of Assam and Meghalaya
under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis.
Amendment RFP
|
12th February 2010 |
|
65.
|
Design, Engineering, Construction, Development, Finance, Operation and Maintenance Two Laning of Shillong Bypass Section of NH 40 & NH-44 from Km 61.800 of NH-40 to Km 34.850 of NH-44 in the State of Meghalaya under
SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis.
Amendment RFP
|
12th February 2010 |
|
66.
|
MAKING TEMPORARY ARRANGMENT FOR TOLL COLLECTION AT KM 74+930
& KM 125+735 OF NH-7 CONSTRUCTION PACKAGE NS-40/TN &
NS-41/TN VIRUDHUNAGAR TO KAYATHAR SECTION (NH-7) OF NORTH
SOUTH CORRIDOR IN THE STATE OF TAMILNADU.
Corrigendum-III
|
12th February 2010 |
|
67.
|
4 lane of new Ranchi Bypass between km 112+400 and km 134+250 (existing chainage) of
NH 33 & widening of 2 lane mainline section of NH 33 to a 4 lane divided carriageway from km
134+250 to km 277.50 (existing chainage) in the state of Jharkhand under NHDP phase III
Project
Addendum - VIII
|
12th February 2010 |
|
68.
|
Six laning of Delhi-Agra Section of NH-2 from km 20.500 to 200.00 on DBFOT (Toll) basis under NHDP V in the State of Haryana & Uttar Pradesh.
Addendum-II
|
12th February 2010 |
|
69.
|
Appointment of Safety Consultants for PPP Projects on DBFO basis
Corrigendum
|
11th February 2010 |
|
70.
|
RFP for Four Laning of Patna to Bakhtiyarpur section of NH 30 from Km 181.300 to Km 231.950 in the State of Bihar on BOT (Toll) project on DBFO pattern under NHDP Phase III Project.
RFP
|
11th February 2010 |
|
71.
|
RFP for two laning with paved shoulders of Mokama Munger section of NH-80 from km 1.430 to km 70.00 in the State of Bihar under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis Project.
RFP
|
11th February 2010 |
|
72.
|
2/4 Laning Of Ambala Kaithal Section
From Km 5.00 To Km 77.80 Of NH-65 To Be
Executed As BOT (Annuity) Project On
DBFO Pattern Under NHDP Phase III In The
State Of Haryana.
Extended Due Date-III
|
11th February 2010 |
|
73.
|
Four Laning of Pali - Pindwara section of NH-14 from Km 115.000 to Km 244.120 (Approx. Length 129.12 Km) in the State of Rajasthan on BOT (Toll) project on DBFO Pattern under NHDP Phase III.
RFP
|
11th February 2010 |
|
74.
|
Four laning of Deoli-Kota Section of NH-12 from km. 165.000 to junction of NH-76 on Kota Bypass (Approx. length 83.04 km) in the State of Rajasthan on BOT (Toll) project on DBFOT pattern under NHDP Phase III.
RFP
|
11th February 2010 |
|
75.
|
Four Laning of Beawar - Pali section of NH-14 from Km 0+000 to Km 115+000 (Approx. Length 115 Km) in the State of Rajasthan on BOT (Toll) project on DBFO Pattern under NHDP Phase III.
RFP
|
11th February 2010 |
|
76.
|
Invitation of Quotations for Ambulance & Towaway vehicles on NH-67 in the State of Tamil Nadu
IFQ ,
Bid Document
|
11th February 2010 |
|
77.
|
Request for Proposal for empanelment of User Fee Auditors for Toll Plazas at Katoghan at Km.120.500 on NH-2& Naini Bridge on NH-27, Dist: Allahabad under the jurisdiction of PIU, Allahabad (WB).
NIT
|
11th February 2010 |
|
78.
|
Empanelment of User Fee Auditor of Baramullla toll plaza.
Bid document
|
11th February 2010 |
|
79.
|
Appointment of site engineer/site supervisor for NHAI for project in an around Pune and Solapur Dist.
NIT
|
11th February 2010 |
|
80.
|
Flood Damage Repairs for Chennai Tiruttani section of NH-205 from Km.0/000 Km.45/200 in the State of Tamil Nadu.
Vol-I,
Vol-II
|
10th February 2010 |
|
81.
|
Balance Work of 4 laning of Nagpur Hyderabad Section of NH 7 from km 94.000 to km 123.000 in the State of Maharashtra [Contract Package No. NS-60(MH)-Bal]
Extend Due Date
|
10th February 2010 |
|
82.
|
Auction of Materials, Plants & Equipment, etc. Lying at Different Locations Between Km. 307.500 and Km. 321.100 of Etawah Bypass Project on NH-2 In Uttar Pradesh Which Has Become the Deemed Property of The Seller on The Termination of The Civil Work Contract. (2nd Call)
NIT ,
Bid Document,
Drawing
|
10th February 2010 |
|
83.
|
FOUR LANING OF PARWANOO SOLAN SECTION OF NH-22 FROM KM 67.000 TO KM 106.000 IN THE STATE OF HIMACHAL PRADESH (APPROX LENGTH 40.70 KM) TO BE EXECUTED ON DBFOT (ANNUITY) BASIS UNDER NHDP PHASE III.
IFQ
|
9th February 2010 |
|
84.
|
Four Laning of Pali - Pindwara section of NH-14 from Km 115.000 to Km 244.120 (Approx. Length 129.12 Km) in the State of Rajasthan on BOT (Toll) project on DBFO Pattern under NHDP Phase III.
Notice
|
9th February 2010 |
|
85.
|
Four Laning of Beawar - Pali section of NH-14 from Km 0+000 to Km 115+000 (Approx. Length 115 Km) in the State of Rajasthan on BOT (Toll) project on DBFO Pattern under NHDP Phase III.
Notice
|
9th February 2010 |
|
86.
|
Four laning of Deoli-Kota Section of NH-12 from km. 165.000 to junction of NH-76 on Kota Bypass (Approx. length 83.04 km) in the State of Rajasthan on BOT (Toll) project on DBFOT pattern under NHDP Phase III.
Notice
|
9th February 2010 |
|
87.
|
Rehabilitation and Upgrading of existing intermediate lane roads to 2 lane with paved shoulders of Forbesganj Jogbani (km 0.000 to km 9.258) on NH-57A in the state of Bihar under NHDP Phase III on DBFOT Annuity basis Project.
Letter,
Bid Document,
Schedule
|
9th February 2010 |
|
88.
|
Two Laning of Piprakothi Raxaul Section of NH 28A (From km 0.600 to km 62.064) and construction of 2- Lane Link Road from km 62.064 to ICP Raxaul (7.33 km length) in the state of Bihar under NHDP phase III on Design, Build, Finance, Operate and Transfer on BOT (Toll) basis.
Letter,
Bid Document,
Schedule
|
9th February 2010 |
|
89.
|
MAKING TEMPORARY ARRANGMENT FOR TOLL COLLECTION AT KM 74+930
& KM 125+735 OF NH-7 CONSTRUCTION PACKAGE NS-40/TN &
NS-41/TN VIRUDHUNAGAR TO KAYATHAR SECTION (NH-7) OF NORTH
SOUTH CORRIDOR IN THE STATE OF TAMILNADU.
Corrigendum-I,
Corrigendum-II,
|
8th February 2010 |
|
90.
|
Invitation for Prequalification of Contractor( REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDERS OF ROAD SECTIONS IN THE STATE OF MADHYA PRADESH.
1. Narsinghpur-Amarwara Road (SH 47) 90 km
2. Amarwara-Umranala including bypass for Chindwara
(SH 47 &SH 19) 85 km
3. Umranala Saoner ( SH 19 &SH 250) 70km
4. Multai Chindwara (SH 26) 92 km
5. Chindwara Seoni Road Section (SH 26) 69 km.)
Cancellation
|
8th February 2010 |
|
91.
|
RFP for Six Laning of Dhankuni to Baleshwar Section of NH-6 from Km 17.600 to Km 129.000 in the State of West Bengal and improvement of existing four lane of NH-60 from Km 0.000 to Km 119.300 in the State of Orissa under NHDP Phase V on Design, Build, Finance, Operate And Transfer (DBFOT) Toll Basis.
Letter,
Shortlisted Applicant,
RFP
|
8th February 2010 |
|
92.
|
Rehabilitation and Up-gradation to 2 lane with paved shoulders of Multai Chhindwara Seoni section of NH 69A and Narsinghpur - Amarawara Chhindwara Saoner section of NH 26B, in Madhya Pradesh and Maharashtra including construction of Ring Road and connecting roads in Chhindwara Town
RFQ
|
8th February 2010 |
|
93.
|
Up- gradation of Andheria More to Delhi/Haryana Border section of Mehrauli-Gurgaon Highway in NCT of Delhi Contract Package- MG/01/2010.
Corrigendum,
Specification
|
8th February 2010 |
|
94.
|
Two laning with paved shoulders of Muzaffarpur-Sonbarsa section of NH-77 from km 0.00 to km 89.00 in the State of Bihar under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basisProject.
Cover Page,
Letter,
Vol-I,
Vol-II ,
Schedules
|
8th February 2010 |
|
95.
|
RFP for Four-laning of Chhapra-Hazipur section of NH-19 from (km 143. 200 to km 207.200) in the State of Bihar under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis Project.
Cover Page,
Letter,
Vol-I,
Vol-II ,
Schedules
|
8th February 2010 |
|
96.
|
Design, Engineering, Finance, Construction, Operation And Maintenance of 4 Laning of Trivendrum - Kerala / TN Border Section of NH-47 In The State of Kerala on Design, Build, Finance, Operate And Transfer (DBFOT) Annuity Basis.
RFQ,
Bid Document
|
8th February 2010 |
|
97.
|
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE WORK OF DESIGN, ENGINEERING, FINANCE, PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF 4 LANING OF INDORE-MP/GUJARAT BORDER OF NH 59 FROM KM 9.500 TO KM 171 IN THE STATE. OF MADHYA PRADESH UNDER NHDP PHASE III ON DBFOT BASIS.
Corrigendum
|
4th February 2010 |
|
98.
|
EMPANELMENT OF USER FEE AUDITOR AT SRIRAMPUR TOLL PLAZA AT 4TH KM OF NH-5A (CHANDIKHOL-PARADIP STRETCH) IN THE STATE OF ORISSA ON NH-5A .
Corrigendum
|
4th February 2010 |
|
99.
|
Independent Engineer services for four laning of Armur- Adloor- YellaReddy from Km 308 to km 367 on Nagpur-Hyderabad Section of NH-7 in the State of Andhra Pradesh [Civil Package No.NS2/BOT/AP-1] on DBFOT Basis under NHDP-Phase-II.
Addendum,
Reply to Queries
|
4th February 2010 |
|
100.
|
Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of Kolhapur Sangli Sholapur Latur Nanded Wardha Nagpur section of NH-7 & SH-6 in the state of
Maharashtra.
Extend Due Date-III
|
4th February 2010 |
|
101.
|
Short term improvements to Northern Segment of Inner Ring Road (IRR) from km 17/5 to km 25/2 and Manali Oil Refinery Road (MORR) from km 0/0 to km 5/6 in Chennai in the State of TamilNadu.
Vol-I,
Vol-II
|
4th February 2010 |
|
102.
|
Supply & Deployment of Manpower for Round the Clock Supervision to oversee and ensure smooth & efficient functioning of Temporary Toll Plaza at Km. 18+650 & Km.74+930 of Madurai to Kovilpatti Section (NH-7) of North-South Corridor in the state of TamilNadu."
NIQ,
Technical Bid
|
4th February 2010 |
|
103.
|
AUCTION OF MATERIALS, PLANTS & EQUIPMENT, ETC. LYING AT DIFFERENT LOCATIONS BETWEEN KM. 250.500 AND KM. 307.500 OF NH-2 ROAD PROJECT IN UTTAR PRADESH WHICH HAS BECOME
THE DEEMED PROPERTY OF THE SELLER ON THE TERMINATION OF THE CIVIL WORK CONTRACT.
NIT ,
Bid Document,
Annexure ,
Drawing
|
2nd February 2010 |
|
104.
|
RFP for Development of Eastern Peripheral Expressway (National Highway No. NE-II) from km 0.00 to km 135.00 (starting from Km 36.083 on NH I and ending at Km 64.330 on NH 2) in the states of Haryana and Uttar Pradesh to be executed as BOT (Toll) project on DBFOT Pattern.
Addendum-II
|
2nd February 2010 |
|
105.
|
DESIGN, ENGINEERING, CONSTRUCTION, DEVELOPMENT, FINANCE, OPERATION AND MAINTENANCE OF BARASAT TO KRISHNAGAR SECTION OF NH- 34 (KM 31.000 TO KM. 115.000) IN THE STATE OF WEST BENGAL UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS.
Letter,
RFP
|
1st February 2010 |
|
106.
|
FOUR LANING OF WALAYAR VADAKKANCHERRY SECTION IN KERALA (KM 182.250 TO KM 240/000 OF NH-47) PACKAGE NS-2/BOT/KL-2 - ON DBFOT (TOLL) BASIS UNDER NHDP PHASE II IN THE STATE OF KERALA.
Bid Document
|
1st February 2010 |
|
107.
|
INVITATION OF OFFERS FOR OFFICE ACCOMODATION.
Bid Document ,
Specification
|
1st February 2010 |
|
108.
|
Short Term Improvement & Routine Maintenance of Rampur-Thariwan (Fatehpur) to Kokhraj Section (km. 100 to km 158) of NH-2
Vol-I,
Vol-II,
Summary,
Attachment to Vol II
|
1st February 2010 |
|
109.
|
Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of Ner Chowk- Manali Section of NH-21 under NHDP-IVB.
Addendum
|
1st February 2010 |