What's New 

                     November 2009                           Current                                                      October 2009

S.NO

Title

Posted On

1.

Consultancy Services For Operation And Maintenance Of Computerized Project Information System (CPIS).
  Amended Tender Document

31st  December
2009

2.

National Highways Authority of India (NHAI) invites applications from the officers of Central / State Government Departments / Organizations / Autonomous Bodies/Public Sector Undertakings for appointment on deputation basis to the following DGM posts
Recruitment

31st  December
2009

3.

Six Laning of Delhi - Agra Section of NH-2 from km 20.50 to km 199.60 (Length – km 179.10) in the State of Haryana/Uttar Pradesh under NHDP Phase V as BOT (Toll) on DBFO Pattern Project.
  Letter

31st  December
2009

4.

AUCTION OF MATERIALS, PLANTS & EQUIPMENT, ETC. LYING AT DIFFERENT LOCATIONS BETWEEN KM. 307.500 AND KM. 321.100 OF ETAWAH BYPASS PROJECT ON NH-2 IN UTTAR PRADESH WHICH HAS BECOME THE DEEMED PROPERTY OF THE SELLER ON THE TERMINATION OF THE CIVIL WORK CONTRACT.
NIT, Bid Document, Drawings

31st  December
2009

5.

Request for proposal for empanelment of Financial Consultant for BOT (Toll) / BOT (Annuity), OMT, SARDP (NE) and other Projects being undertaken by National Highways Authority of India.
NIT, RFP

31st  December
2009

6.

2-LANING WITH PAVED SHOULDERS OF NAGAPATNAM -THANJAVUR SECTION OF NH-67 KM 1.600 TO KM 80.000 IN THE STATE OF TAMIL NADU UNDER NHDP PHASE-III ON DBFOT (ANNUITY) BASIS
Extended Bid Due Date

30th  December
2009

7.

4/6 Laning of Walayar – Vadakkancherry Section in Kerala (Km 182.250 to Km 240/000 of NH-47) – Package Ns-2/Bot/Kl-2 - on Bot (Annuity) Basis Under NHDP Phase II in the State of Kerala.
Extended until further intimation

30th  December
2009

8.

“Design, Engineering, Construction, Development, Finance, Operation and Maintenance Two Laning of Shillong Bypass Section of NH –40 & NH-44 from Km 61.800 of NH-40 to Km 34.850 of NH-44 in the State of Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis”.
Extended Bid Due Date-VII

30th  December
2009

9.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance Four Laning of Jorbat – Shillong (Barapani) Section of NH –40 from km 0.000 to Km. 61.800 of NH- 40 in the State of Assam and Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis.
Extended Bid Due Date-VII

30th  December
2009

10.

Six-Laning of Barwa Adda –Panagarh Section of NH-2 From Km 398/000 to 520/000 Including Panagarh Bypass in the States of Jharkhand & West Bengal Under NHDP Phase V on Bot(Toll) on Dbfot Pattern. 
Extended Bid Due Date

30th  December
2009

11.

Design, Engineering, Finance, Construction, Operation and Maintenance for Four laning of Rajmarg Crossing-Bareli Section of NH 12 from km 103.517 to km 201.750 (98.2 km) in the State of Madhya Pradesh under NHDP PHASE III on BOT (Annuity) on DBFOT Pattern.
RFP

30th  December
2009

12.

Construction of Minor Bridge at Km.229/6 & Box Culvert at Km.229/10 of Nagpur – Saoner - Pandhurna –Betul section of NH-69 in the State of Madhya Pradesh.
NIT, Cover Page, Drawing

30th  December
2009

13.

Consultancy Services For Operation And Maintenance Of Computerized Project Information System (CPIS).
Pre bid minute, Amendment I

29th  December
2009

14.

Ordinary repair works to Manali Oil Refinery Road from Km. 0/000 to Km. 5/600 and Northern segment of Inner Ring Road from Km. 17/500 to Km. 25/600 (2nd Call).
Tender Notice, Volume I, Volume II

29th  December
2009

15.

SIX LANING OF DELHI-AGRA SECTION OF NH-2 FROM KM 20.500 TO 199.600 IN THE STATES OF HARYANA AND UTTAR PRADESH UNDER NHDP PHASE V ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (THE “DBFOT”) TOLL BASIS.
Cover Pages, RFP Volume I, DCA VolumeII, Schedules to DCA, Drawaing

29th  December
2009

16.

Providing and fixing boundary pillars in the state of Haryana and UP on the proposed ROW of six laning of NH-2 from km 20.500 to Km 199.600.
vol - I, Vol - II, BOQ, Drawing - I, Drawing - II

24th  December
2009

17.

4 Laning of NH-12 from Km. 10.40 (junction of NH-7 bypass at Jabalpur) to Km. 103.20 (junction with NH-26- Rajmarg Crossing) under NHDP Phase III on BOT (Annuity) Basis in the state of Madhya Pradesh.
RFQ

24th  December
2009

18.

FOUR LANING OF THE EXISTING BARHI-HAZRIBAGH SECTION OF NH-33 FROM KM 0.00 TO KM 40.500 IN THE STATE OF JHARKHAND UNDER NHDP PHASE-III ON BOT (TOLL) BASIS.
RFQ

24th  December
2009

19.

NEW 4 LANE ROAD FROM NORTHEN GATE OF ENNORE PORT TO THACHUR (NH-5) INCLUDING LINK TO TPP ROAD IN THE STATE OF TAMILNADU UNDER NHDP PHASE VII THROUGH PUBLIC PRIVATE PARTICIPATION ON DESIGN, BUILD, FINANCE OPERATE AND TRANSFER (THE "DBFOT") TOLL BASIS.
RFQ, NIT

24th  December
2009

20.

Providing, Running & Maintaining Non-AC Commercial Vehicle and Diesel Generator Set at Dasna Toll Plaza in Km 29/30 on NH-24 in Ghaziabad District in the State of Uttar Pradesh.
Notice

23rd  December
2009

21.

FOUR LANING OF KUTTIPURAM - EDAPALLY SECTION OF NH-17 FROM KM 318+000 TO KM 438+600 UNDER NHDP PHASE III IN THE STATE OF KERALA ON DBFOT BASIS.
Cover Letter, Bid Document - I

23rd  December
2009

22.

Four laning of Jetpur-Somnath Section of NH-8D from km. 0.000 to km. 127.000 (Length 127.00 km.) in the State of Gujarat to be executed as BOT (Annuity) Project under NHDP Phase III on BOT(Annuity) on DBFOT Pattern.
RFQ

23rd  December
2009

23.

Consultancy Services for supervision of operation and routine maintenance contract for two years duration of NHAI Corporate Office Building at Dwarka, New Delhi.
RFP

23rd  December
2009

24.

TENDER FOR MISCELLANEOUS CIVIL WORKS.
Bid Document Technical, Bid Document Financial

23rd  December
2009

25.

Hiring of vehicles on day-to-day basis and on monthly basis.
NIT

22th  December
2009

26.

FOUR LANING OF NAGPUR - BETUL SECTION OF NH-69 FROM KM 137.000 TO KM 257.000) IN THE STATE OF MADHYA PRADESH AND FROM KM 59.300 TO KM 3.000 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE IV ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (ANNUITY) BASIS.
RFQ

21th  December
2009

27.

"Four-laning of Nagpur – Wainganga Bridge Section of NH – 6 from km 485.000 to km 544.200 in the State of Maharashtra to be executed as BOT (TOLL) on DBFO pattern under NHDP PHASE-III".
RFQ

19th  December
2009

28.

2/4 laning of Reengus Sikar Section of NH-11 to be executed as BOT(TOLL) Project on DBFOT pattern under Phase III in the State of Rajasthan.
Corrigendum-II

19th  December
2009

29.

Consultancy Services for Feasibility Study and Detailed Project Report for 4/6 laning of Jabalpur-Rewa Section of National Highway No. 07 in the State of Madhya Pradesh.
RFP

18th  December
2009

30.

Design, Engineering,Finance,Construction, Operation And Maintenance Of Bijapur- Hungund Section Of Nh-13 From Km 102.000 To Km 202.000 In The State Of Karnataka Under NHDP Phase III On Design, Build,Finance,Operate And Transfer (DBFOT) ) Toll Basis .
Addendum-VI

18th  December
2009

31.

Design, Engineering,Finance,Construction, Operation And Maintenance Of Hungund-Hospet Section Of NH-13 From Km 202.000 To Km 299.000 In The State Of Karnataka Under NHDP Phase III On Design, Build,Finance,Operate And Transfer (DBFOT) Toll Basis.
Addendum-VI

18th  December
2009

32.

Upgradation, Operation and Maintenance of km.534.720 to km 556.840 of Hyderabad – Bengaluru Section of NH-7 in Karnataka to be executed as BOT (Toll) on Design, Build, Finance, Operate & Transfer (DBFOT) pattern under NHDP Phase-VII.
Addendum-VI

18th  December
2009

33.

4/6 laning of Maharashtra/Goa Border to Panaji-Goa/Karnataka Border section of NH-17 in the State of Goa under NHDP Phase-III-Reg RFP.
Extension of Bid Due Date

18th  December
2009

34.

INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE 4- LANING AND 2-LANING WITH PAVED SHOULDER IN SELECTED STRETCHES OF NHs IN THE STATE OF RAJASTHAN AND GUJRAT ON DBFOT BASIS UNDER NHDP PHASE - III.
Reply of Queries

17th  December
2009

35.

Consultancy Services for Feasibility Study and Detailed Project Report for 4 laning of Jabalpur Ring Road around Jabalpur Town and Jabalpur Flyover in the State of Madhya Pradesh. 
RFQ

17th  December
2009

36.

INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE WORK OF SIX LANING FROM KM 102.035 TO KM 144.740 ON CHENGAPALLI TO START OF COIMBATORE BYPASS AND FOUR LANING FROM KM 170.940 TO KM 183.060 ON END OF COIMBATORE BYPASS TO TN/KERALA BORDER SECTION OF NH-47 IN THE STATE OF TAMIL NADU UNDER NHDP PHASE II ON DBFOT (TOLL) BASIS
EOI

17th  December
2009

37.

Two/Four Laning of Bakhtiarpur-Khagaria Section of NH-31 (From Km 153.30 To Km 273.450) in the State of Bihar under NHDP phase III on Design, Build, Finance, Operate and Transfer (Toll) Basis.
RFQ

17th  December
2009

38.

PROVIDING SERVICES OF TECHNICAL MANPOWER VIZ NETWORK/ SYSTEM ADMINISTRATOR AND DESKTOP ADMINISTRATOR TO MAINTAIN COMPUTER HARDWARE, NETWORKING, CABLING & UPS etc. FOR SRINAGAR TOLL PLAZA AT KM 75 AND MAHUVAN TOLL PLAZA AT KM 164 ON NH-2 IN THE STATE OF HARYANA AND UTTAR PRADESH.
Corrigendum

16th  December
2009

39.

Collection of USER Fee through private contractor on the basis of competitive bidding at Km. 75.00 (Srinagar near Palwal) for Km. 18.80 to Km. 108.90 on Badarpur – Kosi Section of the National Highway No. 02 (hereinafter referred to as the said section of the National Highway).
Corrigendum

16th  December
2009

40.

Improvement of At-grade rotary, construction of slip road near Radisson and Mahipalpur on NH-8 in Delhi.
Volume-I, Volume-II, BOQ, Drawings

16th  December
2009

41.

Six laning of Tumkur- Chitradurga section (excluding Tumkur & Chitradurga Bypass ) from km 75.00 to km 189.00 of NH-4 (approx 114.00 km ) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V.
REVISED LIST OF PRE-QUALIFIED APPLICANTS

16th  December
2009

42.

Short term improvement and routine maintenance of Dankuni-Kolaghat-Kharagpur section (km. 17.60 to km. 136.00) of NH-6 and Dankuni-Palsit Section (km. 647.368 to km. 645.546) of NH-2 in the State of West Bengal.
Bid document Vol-1
,Bid document Vol II, BOQ

16th  December
2009

43.

Two Laning of Gopalganj-Chhapra Section of NH - 19 (From Km 0.000 To Km 94.700) in the State of Bihar under NHDP Phase III on DBFOT (Annuity) Basis.
Addendum

16th  December
2009

44.

Engagement of Round the Clock Supervisors for Toll Plazas at km 464.774 of Hyderabad-Bangalore Section of NH-7 near Bagepalli in the State of Karnataka.
Bid Document-I

15th  December
2009

45.

RFP for Development of Eastern Peripheral Expressway (National Highway No. NE-II) from km 0.00 to km 135.00 (starting from Km 36.083 on NH – I and ending at Km 64.330 on NH – 2) in the states of Haryana and Uttar Pradesh to be executed as BOT (Toll) project on DBFOT Pattern.
Bid Document-I, Bid Document-II, Schedule-I

15th  December
2009

46.

“Design, Engineering, Construction, Development, Finance, Operation and Maintenance Two Laning of Shillong Bypass Section of NH –40 & NH-44 from Km 61.800 of NH-40 to Km 34.850 of NH-44 in the State of Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis”.
Extended Bid Due Date-VII

15th  December
2009

47.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance Four Laning of Jorbat – Shillong (Barapani) Section of NH –40 from km 0.000 to Km. 61.800 of NH- 40 in the State of Assam and Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis.
Extended Bid Due Date-VI

15th  December
2009

48.

Four laning of Sambalpur – Baragarh – Chattisgarh/Orissa Border Section of NH 6 Km. 0.00 to Km. 88.00 (Length – 88.00 Km.) in the State of Orissa under NHDP Phase III on DBFO pattern.
Addendum/Corrigendum-III

14th  December
2009

49.

Two Laning with paved shoulders of Rajmarg Chouraha – Bareli section of NH-12 from Km 103.517 to km 201.750 in the state of Madhya Pradesh under NHDP Phase IIIA on BOT (Annuity) Basis. 
Cancellation

14th  December
2009

50.

Design, Engineering, Finance, Construction, Operation and Maintenance of Two laning of Jabalpur - Rajmarg Crossing Section of NH 12 from km 10.400 to km 103.200 (92.8 km) in the State of Madhya.
Cancellation

14th  December
2009

51.

Invitation of Bids for round the clock Supervisor at Toll Plaza at Km. 64/200, Village Jaswantgarh, Tehsil-Gogunda, District-Udaipur of NH-76 to oversee and ensure smooth and efficient functioning of the plaza for one year.
Bid Document

14th  December
2009

52.

Two/Four Laning of Khagaria-Purnia Section of NH-31 (From Km 270.00 to Km 410.00) in the State of Bihar on Design, Build, Finance, Operate And Transfer on Bot (Annuity) Basis.
Addendum

14th  December
2009

53.

Six-Laning of Barwa Adda –Panagarh Section of NH-2 From Km 398/000 to 520/000 Including Panagarh Bypass in the States of Jharkhand & West Bengal Under NHDP Phase V on Bot(Toll) on Dbfot Pattern.
Addendum

14th  December
2009

54.

Design, Engineering,Finance,Construction, Operation And Maintenance Of Hungund-Hospet Section Of NH-13 From Km 202.000 To Km 299.000 In The State Of Karnataka Under NHDP Phase III On Design, Build,Finance,Operate And Transfer (DBFOT) Toll Basis.
Addendum-V

14th  December
2009

55.

Upgradation, Operation and Maintenance of km.534.720 to km 556.840 of Hyderabad – Bengaluru Section of NH-7 in Karnataka to be executed as BOT (Toll) on Design, Build, Finance, Operate & Transfer (DBFOT) pattern under NHDP Phase-VII.
Addendum-V

14th  December
2009

56.

Design, Engineering,Finance,Construction, Operation And Maintenance Of Bijapur- Hungund Section Of Nh-13 From Km 102.000 To Km 202.000 In The State Of Karnataka Under NHDP Phase III On Design, Build,Finance,Operate And Transfer (DBFOT) ) Toll Basis .
Addendum-V

14th  December
2009

57.

Design, Engineering,Finance,Construction, Operation and Maintenance Of Thiruvantpuram-TN/Kerala Border in The State Of Kerala Under NHDP Phase III On Design, Build,Finance,Operate And Transfer (DBFOT) ) Toll Basis.
Extension of Due Date

11th  December
2009

58.

TWO LANING OF PIPRAKOTHI – RAXAUL SECTION OF NH - 28A (FROM KM 0.600 TO KM62.064) AND CONSTRUCTION OF 2- LANE LINK ROAD FROM KM 62.064 TO ICP RAXAUL (7.33 KM LENGTH) IN THE STATE OF BIHAR UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER ON BOT (ANNUITY)BASIS.
Addendum-2(Revised RFQ)

11th  December
2009

59.

Collection of USER Fee through private contractor on the basis of competitive bidding at Km 301.700 (at Gangapada on NH – 5) for Km.362.000 to Km.297.000 on Sunakhala – Bhubaneswar Section of the National Highway No.5.
Bid Document, Toll Notification, Circular

11th  December
2009

60.

Collection of USER Fee through private contractor on the basis of competitive bidding at 246th Km (near Manguli on NH – 5) for Km.297.000 to Km.227.000 on Bhubaneswar – Chhatia Section of the National Highway No.5.
Bid Document, Toll Notification, Circular

11th  December
2009

61.

Collection of USER Fee through private contractor on the basis of competitive bidding at Km 191.698 (at Panikoili on NH – 5) for Km.227.000 to Km.157.000 on Chhatia – Bhadrak Section of the National Highway No.5.
Bid Document, Toll Notification, Circular

11th  December
2009

62.

Invitation for Prequalification of Contractor( REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDERS OF ROAD SECTIONS IN THE STATE OF MADHYA PRADESH. 1. Narsinghpur-Amarwara Road (SH 47) 90 km 2. Amarwara-Umranala including bypass for Chindwara (SH 47 &SH 19) 85 km 3. Umranala –Saoner ( SH 19 &SH 250) 70km 4. Multai – Chindwara (SH 26) 92 km 5. Chindwara – Seoni Road Section (SH 26) 69 km.)
Pre-Bid Meeting

10th  December
2009

63.

Collection of USER Fee through private contractor on the basis of competitive bidding at Km. 399.000 (SIKANDRA TOLL PLAZA) for Km. 396.177 to Km. 457.377 Section of the National Highway No. NH-2
Bid Document-I, Bid Document-II, Schedule-I, Schedule-II, Schedule-III to VIII

10th  December
2009

64.

Collection of USER Fee through private contractor on the basis of competitive bidding at Km. 506.262 (PURWAMEER TOLL PLAZA) FOR KM. 457.377 TO KM. 508.877Section of the National Highway No. NH-2
Bid Document-I, Bid Document-II, Schedule-I, Schedule-II, Schedule-III to VIII

10th  December
2009

65.

2/4 Laning Of Ambala Kaithal Section From Km 5.00 To Km 77.80 Of NH-65 To Be Executed As BOT (Annuity) Project On DBFO Pattern Under NHDP Phase III In The State Of Haryana.
NIT, RFQ

10th  December
2009

66.

2/4 laning of Rohtak Jind Section from km 302.670 to km 352.250 of NH-71 to be executed as BOT (Annuity) project on DBFO Pattern under NHDP Phase III in the State of Haryana Project.
NIT, RFQ

10th  December
2009

67.

Consultancy Services for Feasibility study and Preparation of Detailed Project Report for widening/six laning/up gradation of existing four lanned section of Narmada bridge & its approaches from Km. 192.00 to 198.00 on Ahmedabad-Mumbai Section of NH-8 and value addition works to Vadodara to Bharuch & Bharuch to Surat Section of NH-8.
Queries, Corrigendum

10th  December
2009

68.

Four Laning Of Ludhiana To Talwandi Section Of NH - 95 From Km 92.000 To Km 170.000 In The State Of Punjab To Be Executed On BOT (Toll) On DBFOT Basis Under NHDP Phase III.
NIT, RFQ

10th  December
2009

69.

Design, Engineering, Finance, Construction, Operation And Maintenance Of 4 Laning Of KNT/KL Border – Kannur Section Of NH – 17 In The State Of Kerala Under NHDP Phase III.
Amendment-II

9th  December
2009

70.

Upgradation, Operation and Maintenance of km.534.720 to km 556.840 of Hyderabad – Bengaluru Section of NH-7 in Karnataka to be executed as BOT (Toll) on Design, Build, Finance, Operate & Transfer (DBFOT) pattern under NHDP Phase-VII.
Addendum-II

9th  December
2009

71.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance Four Laning of Jorbat – Shillong (Barapani) Section of NH –40 from km 0.000 to Km. 61.800 of NH- 40 in the State of Assam and Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis.
Extended Bid Due Date-V

9th  December
2009

72.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance Two Laning of Shillong Bypass Section of NH –40 & NH-44 from Km 61.800 of NH-40 to Km 34.850 of NH-44 in the State of Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis
Extended Bid Due Date-VI

9th  December
2009

73.

Short Term Improvements & Routine Maintenance of Rampur–Thariwan (Fatehpur) to Kokhraj Section (km. 100 to km. 158) of NH-2 in the State of UP.
Volume-I, Volume-II, BOQ, Summary

9th  December
2009

74.

Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km) in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern.
Volume-I, Volume-II, Volume-III, Schedule A to D, Drawings

9th  December
2009

75.

Operation & comprehensive maintenance of fire protection works.
Bid Document-I, Bid Document-II

8th  December
2009

76.

Consultancy Services For Operation And Maintenance Of Computerized Project Information System (CPIS).
NIT, Bid Document

8th  December
2009

77.

Four Laning of Krishnagar to Bahrampore section of NH-34 from Km. 115.000 to Km. 193.000 in the state of West Bengal (Package No.NHDP-III/BOT/WB/02). 
Extension of Bid Due date-VII

7th  December
2009

78.

Four Laning of Raiganj - Dalkhola section of NH-34 from Km. 398.000 to Km. 452.7000 in the state of West Bengal (Package No.NHDP-III/BOT/WB/05). 
Extension of Bid Due date-VII

7th  December
2009

79.

PROCESS FOR FOUR-LANING OF NAGPUR - BETUL SECTION OF NH – 69 FROM KM 137 TO 257 IN THE STATE OF MP AND FROM KM 59.300 TO KM 3.0 IN THE STATE OF MAHARASHTRA TO BE EXECUTED AS BOT (TOLL) ON DBFO PATTERN UNDER NHDP PHASE –IV. 
NIT
, RFP

7th  December
2009

80.

Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of Kolhapur – Sangli – Sholapur – Latur – Nanded – Wardha – Nagpur section of NH-7 & SH-6 in the state of Maharashtra.
  NIT, RFP

7th  December
2009

81.

4-Laning of Parwanoo- Solan Section of NH-22 Under NHDP III in the State of Himachal Pradesh on Design, Build, Finance, operate and transfer (DBFOT) Basis.
Addendum-3 , Addendum-4

7th  December
2009

82.

INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE 4- LANING OF HAZIPUR-MUZAFFARPUR SECTION OF NH – 77 FROM KM 0.00 TO KM 46.300 AND CONSTRUCTION OF 16.870 KMS NEW MUZAFFARPUR BYPASS ON DBFOT (ANNUITY) BASIS UNDER NHDP PHASE - III.
NIT, EOI

5th  December
2009

83.

Six-Laning of Icchapuram-Srikakulam-Vishakhapatnam-Ankapalli-Rajahmundary Section of NH-5 From Km 470.000 to Km 901.753 (Length – 436km)in the State of Andhra Pradesh to be executed as Bot (Toll) on DBFOT Pattern Under Mega Infrastructure Highway Project NHDP Phase – V.
Corrigendum-II
5th  December
2009

84.

PROVIDING SERVICES OF TECHNICAL MANPOWER VIZ NETWORK/ SYSTEM ADMINISTRATOR AND DESKTOP ADMINISTRATOR TO MAINTAIN COMPUTER HARDWARE, NETWORKING, CABLING & UPS etc. FOR SRINAGAR TOLL PLAZA AT KM 75 AND MAHUVAN TOLL PLAZA AT KM 164 ON NH-2 IN THE STATE OF HARYANA AND UTTAR PRADESH.
NIT
4th  December
2009

85.

PROVIDING SERVICES OF TECHNICAL MANPOWER VIZ NETWORK/ SYSTEM ADMINISTRATOR AND DESKTOP ADMINISTRATOR TO MAINTAIN COMPUTER HARDWARE, NETWORKING, CABLING & UPS etc. FOR SRINAGAR TOLL PLAZA AT KM 75 AND MAHUVAN TOLL PLAZA AT KM 164 ON NH-2 IN THE STATE OF HARYANA AND UTTAR PRADESH.
NIT
4th  December
2009

86.

INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE 4- LANING OF NHs IN THE STATE OF KARNATAKA ON DBFOT BASIS UNDER NHDP PHASE - III
EOI, Clarification
4th  December
2009

87.

4 lane of new Ranchi Bypass between km 112+400 and km 134+250 (existing chainage) of NH 33 & widening of 2 lane mainline section of NH 33 to a 4 lane divided carriageway from km 134+250 to km 277.50 (existing chainage) in the state of Jharkhand under NHDP phase III Project
Addendum-V
4th  December
2009

88.

“Design, Engineering, Construction, Development, Finance, Operation and Maintenance Two Laning of Shillong Bypass Section of NH –40 & NH-44 from Km 61.800 of NH-40 to Km 34.850 of NH-44 in the State of Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis”.
Corrigendum-II
4th  December
2009

89.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance Four Laning of Jorbat – Shillong (Barapani) Section of NH –40 from km 0.000 to Km. 61.800 of NH- 40 in the State of Assam and Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis.
Corrigendum-II
4th  December
2009

90.

Rehabilitation, Strengthening and Four Laning of Ramban to Banihal Section of NH-1A, from Km 151.000 to Km 187.000 on BOT (Annuity) basis on DBFO pattern in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/I/J&K)”Project.
Addendum-I
4th  December
2009

91.

Rehabilitation, Strengthening and Four Laning of Udhampur to Ramban Section of NH-1A, from Km 67.00 to Km 89.00 and Km 130.00 to Km 151.00 on BOT (Annuity) basis on DBFO Pattern, in the State of Jammu & Kashmir (Pkg No:- NHDP-Phase-II/BOT/IV/J&K) Project Addendum-I
4th  December
2009

92.

Rehabilitation, Strengthening and Four Laning of Srinagar to Banihal Section from Km 187.000 to Km 189.350 (Banihal Bypass) and Km 220.700 to Km 286.110 of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/I/J&K)”Project.
Addendum-I
4th  December
2009

93.

Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Quazigund - Banihal Section from Km 189.350 to Km 204.700 including two tunnels (2 Lane) of 0.69 kms and 8.45 kms of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/II/J&K)”Project on BOT (Annuity) basis.
Addendum-I
4th  December
2009

94.

Four Laning of Chenani to Nashri Section of NH-1A from Km 89.00 to 130.00 (new alignment) of NH-1A including 9 Km long tunnel (2 lane) with parallel escape tunnel in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/V/J&K)”.
Addendum-I
4th  December
2009

95.

Rehabilitation, Strengthening and Four Laning of Srinagar to Banihal Section from Km 187.000 to Km 189.350 (Banihal Bypass) and Km 220.700 to Km 286.110 of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/I/J&K)”Project.
Addendum-I
4th  December
2009

96.

4/6 laning of Maharashtra/Goa Border to Panaji-Goa/Karnataka Border section of NH-17 in the State of Goa under NHDP Phase-III-Reg RFP.
Corrigendum-II
4th  December
2009

97.

Independent Consultancy services for Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Hyderabad-Vijayawada Section from Km 40.000 to Km 221.500 of NH-9 in the state of Andhra Pradesh under NHDP Phase-III (Package No.NHDP-III/BOT/AP/01). .
Letter
4th  December
2009

98.

Independent Engineer services for development of New Four lane Elevated Road from Chennai Port to Maduravoyal (NH-4) in the State of Tamil Nadu under NHDP Ph-VII on BOT(Toll) basis.
RFP
3rd  December
2009

99.

Six laning of Kishangarh - Udaipur section of NH- 79A, 79 & 76 from km. 364.00 of NH-8 to km 113.800 of NH-76 (length –315.00 km.) in the State of Rajasthan on BOT (Toll) following by DBFO Pattern under NHDP Phase-V: Submission of RFP.
RFP Cancelled
3rd  December
2009

100.

Independent Consultancy services for Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Hyderabad-Vijayawada Section from Km 40.000 to Km 221.500 of NH-9 in the state of Andhra Pradesh under NHDP Phase-III (Package No.NHDP-III/BOT/AP/01). .
RFP

3rd  December
2009

101.

INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE WORK OF DESIGN, ENGINEERING, FINANCE, PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF “4 laning of Cherthalai - Ochira Section of NH – 47 from Km 379.100 to Km 465.000” AND “4 laning of Ochira – Thiruvananthapuram Section of NH – 47 from Km 465.000 to Km 551.900”IN THE STATE OF KERALA UNDER NHDP PHASE III ON DBFOT BASIS.
EOI

2nd  December
2009

102.

TWO LANING OF PIPRAKOTHI – RAXAUL SECTION OF NH - 28A (FROM KM 0.600 TO KM62.064) AND CONSTRUCTION OF 2- LANE LINK ROAD FROM KM 62.064 TO ICP RAXAUL (7.33 KM LENGTH) IN THE STATE OF BIHAR UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER ON BOT (ANNUITY)BASIS.
Addendum-I

2nd  December
2009

103.

Design, Engineering, Finance, Construction, Operation and Maintenance of Two laning of Rajmarg Crossing-Bareli Section of NH 12 from km 10.400 to km 103.200 (92.8 km) in the State of Madhya Pradesh. 
RFQ

2nd  December
2009

104.

“Application for the post of GM (Name of the post) for absorption”.
Extend Date

2nd  December
2009

105.

TWO LANING OF FORBESGANJ–JOGBANISECTION OF NH - 57A (FROM KM0.000 13.000) AND CONSTRUCTION OF 2- LANE LINK ROAD TO ICP, JOGBANI (1.5 KM LENGTH) IN THE STATE OF BIHAR UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER ON BOT (ANNUITY) BASIS.
Addendum-I

2nd  December
2009