Consultancy Services For Operation And Maintenance Of Computerized Project Information System (CPIS). Amended Tender Document
31st December 2009
2.
National Highways Authority of India (NHAI) invites applications from the officers of Central / State Government Departments / Organizations / Autonomous Bodies/Public Sector Undertakings for appointment on deputation basis to the following
DGM posts Recruitment
31st December 2009
3.
Six Laning of Delhi - Agra Section of NH-2 from km 20.50 to km 199.60 (Length –
km 179.10) in the State of Haryana/Uttar Pradesh under NHDP Phase V as BOT (Toll) on
DBFO Pattern Project. Letter
31st December 2009
4.
AUCTION OF MATERIALS, PLANTS & EQUIPMENT, ETC. LYING
AT DIFFERENT LOCATIONS BETWEEN KM. 307.500 AND KM. 321.100
OF ETAWAH BYPASS PROJECT ON NH-2 IN UTTAR PRADESH
WHICH HAS BECOME THE DEEMED PROPERTY OF THE SELLER ON
THE TERMINATION OF THE CIVIL WORK CONTRACT. NIT,
Bid Document,
Drawings
31st December 2009
5.
Request for proposal for empanelment of Financial Consultant for BOT (Toll) / BOT (Annuity), OMT, SARDP (NE) and other Projects being undertaken by National Highways Authority of India. NIT,
RFP
31st December 2009
6.
2-LANING WITH PAVED SHOULDERS OF NAGAPATNAM -THANJAVUR SECTION OF NH-67 KM 1.600 TO KM 80.000 IN THE STATE OF TAMIL NADU UNDER NHDP PHASE-III ON DBFOT (ANNUITY) BASIS
Extended Bid Due Date
30th December 2009
7.
4/6 Laning of Walayar – Vadakkancherry Section in Kerala (Km 182.250 to Km 240/000 of NH-47) – Package Ns-2/Bot/Kl-2 - on Bot (Annuity) Basis Under NHDP Phase II in the State of Kerala.
Extended until further intimation
30th December 2009
8.
“Design, Engineering, Construction, Development, Finance, Operation and Maintenance Two Laning of Shillong Bypass Section of NH –40 & NH-44 from Km 61.800 of NH-40 to Km 34.850 of NH-44 in the State of Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis”. Extended Bid Due Date-VII
30th December 2009
9.
Design, Engineering, Construction, Development, Finance, Operation and Maintenance Four Laning of Jorbat – Shillong (Barapani) Section of NH –40 from km 0.000 to Km. 61.800 of NH- 40 in the State of Assam and Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis. Extended Bid Due Date-VII
30th December 2009
10.
Six-Laning of Barwa Adda –Panagarh Section of NH-2 From Km 398/000 to 520/000 Including Panagarh Bypass in the States of Jharkhand & West Bengal Under NHDP Phase V on Bot(Toll) on Dbfot Pattern. Extended Bid Due Date
30th December 2009
11.
Design, Engineering, Finance, Construction, Operation and Maintenance for Four laning of Rajmarg Crossing-Bareli Section of NH 12 from km 103.517 to km 201.750 (98.2 km) in the State of Madhya Pradesh under NHDP PHASE III on BOT (Annuity) on DBFOT Pattern. RFP
30th December 2009
12.
Construction of Minor Bridge at Km.229/6 & Box Culvert at Km.229/10 of Nagpur – Saoner - Pandhurna –Betul section of NH-69 in the State of Madhya Pradesh. NIT,
Cover Page,
Drawing
30th December 2009
13.
Consultancy Services For Operation And Maintenance Of Computerized Project Information System (CPIS).
Pre bid minute,
Amendment I
29th December 2009
14.
Ordinary repair works to Manali Oil
Refinery Road from Km. 0/000 to Km. 5/600 and Northern
segment of Inner Ring Road from Km. 17/500 to Km.
25/600 (2nd Call). Tender Notice,
Volume I,
Volume II
29th December 2009
15.
SIX LANING OF DELHI-AGRA SECTION OF NH-2 FROM KM
20.500 TO 199.600
Providing and fixing boundary pillars in the state of Haryana and UP on the proposed
ROW of six laning of NH-2 from km 20.500 to Km 199.600. vol - I,
Vol - II,
BOQ,
Drawing - I,
Drawing - II
24th December 2009
17.
4 Laning of NH-12 from Km. 10.40 (junction of NH-7 bypass at
Jabalpur) to Km. 103.20 (junction with NH-26- Rajmarg Crossing)
under NHDP Phase III on BOT (Annuity) Basis in the state of
Madhya Pradesh. RFQ
24th December 2009
18.
FOUR LANING OF THE EXISTING BARHI-HAZRIBAGH
SECTION OF NH-33 FROM KM 0.00 TO KM 40.500 IN THE
STATE OF JHARKHAND UNDER NHDP PHASE-III ON
BOT (TOLL) BASIS. RFQ
24th December 2009
19.
NEW 4 LANE ROAD FROM NORTHEN GATE OF ENNORE PORT TO
THACHUR (NH-5) INCLUDING LINK TO TPP ROAD IN THE STATE OF
TAMILNADU UNDER NHDP PHASE VII THROUGH PUBLIC PRIVATE
PARTICIPATION ON DESIGN, BUILD, FINANCE OPERATE AND
TRANSFER (THE "DBFOT") TOLL BASIS. RFQ,
NIT
24th December 2009
20.
Providing, Running & Maintaining Non-AC Commercial Vehicle and Diesel
Generator Set at Dasna Toll Plaza in Km 29/30 on NH-24 in Ghaziabad District in the
State of Uttar Pradesh. Notice
23rd December 2009
21.
FOUR LANING OF KUTTIPURAM - EDAPALLY SECTION
OF NH-17 FROM KM 318+000 TO KM 438+600 UNDER NHDP
PHASE III IN THE STATE OF KERALA ON DBFOT BASIS. Cover Letter,
Bid Document - I
23rd December 2009
22.
Four laning of Jetpur-Somnath Section of NH-8D from km. 0.000 to
km. 127.000 (Length 127.00 km.) in the State of Gujarat to be
executed as BOT (Annuity) Project under NHDP Phase III on
BOT(Annuity) on DBFOT Pattern. RFQ
23rd December 2009
23.
Consultancy Services for supervision of operation and routine
maintenance contract for two years duration of NHAI Corporate Office
Building at Dwarka, New Delhi. RFP
Hiring of vehicles on day-to-day basis and on monthly basis. NIT
22th December 2009
26.
FOUR LANING OF NAGPUR - BETUL SECTION OF NH-69 FROM KM 137.000 TO KM 257.000) IN THE STATE OF MADHYA PRADESH AND FROM KM 59.300 TO KM 3.000 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE IV ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (ANNUITY) BASIS.
RFQ
21th December 2009
27.
"Four-laning of Nagpur – Wainganga Bridge Section of NH – 6 from km 485.000 to km 544.200 in the State of Maharashtra to be executed as BOT (TOLL) on DBFO pattern under NHDP PHASE-III".
RFQ
19th December 2009
28.
2/4 laning of Reengus Sikar Section of NH-11 to be executed as BOT(TOLL) Project on DBFOT pattern under Phase III in the State of Rajasthan. Corrigendum-II
19th December 2009
29.
Consultancy Services for Feasibility Study and Detailed Project Report for 4/6 laning of Jabalpur-Rewa Section of National Highway No. 07 in the State of Madhya Pradesh.
RFP
18th December 2009
30.
Design, Engineering,Finance,Construction,
Operation And Maintenance Of Bijapur- Hungund Section Of Nh-13 From
Km 102.000 To Km 202.000 In The State Of Karnataka Under NHDP Phase
III On Design, Build,Finance,Operate And Transfer (DBFOT) ) Toll
Basis . Addendum-VI
18th December 2009
31.
Design, Engineering,Finance,Construction,
Operation And Maintenance Of Hungund-Hospet Section Of NH-13 From Km
202.000 To Km 299.000 In The State Of Karnataka Under NHDP Phase III
On Design, Build,Finance,Operate And Transfer (DBFOT) Toll Basis.
Addendum-VI
18th December 2009
32.
Upgradation, Operation and Maintenance of km.534.720 to km 556.840 of Hyderabad – Bengaluru Section of NH-7 in Karnataka to be executed as BOT (Toll) on Design, Build, Finance, Operate & Transfer
(DBFOT) pattern under NHDP Phase-VII. Addendum-VI
18th December 2009
33.
4/6 laning of Maharashtra/Goa Border to Panaji-Goa/Karnataka Border section of NH-17 in the State of Goa under NHDP Phase-III-Reg RFP. Extension of Bid Due Date
18th December 2009
34.
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR
INDEPENDENT ENGINEER FOR THE 4- LANING AND 2-LANING WITH PAVED SHOULDER IN SELECTED STRETCHES OF NHs IN THE STATE OF RAJASTHAN AND GUJRAT ON DBFOT BASIS UNDER NHDP PHASE - III.
Reply of Queries
17th December 2009
35.
Consultancy Services for Feasibility Study and Detailed Project Report for 4 laning of Jabalpur Ring Road around Jabalpur Town and Jabalpur Flyover in the State of Madhya Pradesh.
RFQ
17th December 2009
36.
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR
INDEPENDENT ENGINEER FOR THE WORK OF SIX LANING FROM KM 102.035 TO KM 144.740 ON CHENGAPALLI TO START OF COIMBATORE BYPASS AND FOUR LANING FROM KM 170.940 TO KM 183.060 ON END OF COIMBATORE BYPASS TO TN/KERALA BORDER SECTION OF NH-47 IN THE STATE OF TAMIL NADU UNDER NHDP PHASE II ON DBFOT (TOLL) BASIS
EOI
17th December 2009
37.
Two/Four Laning of Bakhtiarpur-Khagaria Section of NH-31 (From Km 153.30 To Km 273.450) in the State of Bihar under NHDP phase III on Design, Build, Finance, Operate and Transfer (Toll) Basis. RFQ
17th December 2009
38.
PROVIDING SERVICES OF TECHNICAL MANPOWER VIZ NETWORK/ SYSTEM ADMINISTRATOR AND DESKTOP ADMINISTRATOR TO MAINTAIN COMPUTER HARDWARE, NETWORKING, CABLING & UPS etc. FOR SRINAGAR TOLL PLAZA AT KM 75 AND MAHUVAN TOLL PLAZA AT KM 164 ON NH-2 IN THE STATE OF HARYANA AND UTTAR PRADESH. Corrigendum
16th December 2009
39.
Collection of USER Fee through private contractor on the basis of competitive bidding at Km. 75.00 (Srinagar near Palwal) for Km. 18.80 to Km. 108.90 on Badarpur – Kosi Section of the National Highway No. 02 (hereinafter referred to as the said section of the National Highway).
Corrigendum
16th December 2009
40.
Improvement of At-grade rotary, construction of slip road near Radisson and Mahipalpur on NH-8 in Delhi. Volume-I,
Volume-II,
BOQ,
Drawings
16th December 2009
41.
Six laning of Tumkur- Chitradurga section (excluding Tumkur & Chitradurga Bypass ) from km 75.00 to km 189.00 of NH-4 (approx 114.00 km ) in the State of Karnataka to be executed as BOT (Toll) project on DBFO pattern under NHDP Phase V. REVISED LIST OF PRE-QUALIFIED APPLICANTS
16th December 2009
42.
Short term improvement and routine maintenance of Dankuni-Kolaghat-Kharagpur section (km. 17.60 to km. 136.00) of NH-6 and Dankuni-Palsit Section (km. 647.368 to km. 645.546) of NH-2 in the State of West Bengal.
Bid document Vol-1,Bid document Vol II, BOQ
16th December 2009
43.
Two Laning of Gopalganj-Chhapra Section of NH - 19 (From Km 0.000 To Km 94.700) in the State of Bihar under NHDP Phase III on DBFOT (Annuity) Basis.
Addendum
16th December 2009
44.
Engagement of Round the Clock Supervisors for Toll
Plazas at km 464.774 of Hyderabad-Bangalore Section of NH-7 near
Bagepalli in the State of Karnataka.
Bid Document-I
15th December 2009
45.
RFP for Development of Eastern Peripheral Expressway (National Highway No. NE-II) from km 0.00 to km 135.00 (starting from Km 36.083 on NH – I and ending at Km 64.330 on NH – 2) in the states of Haryana and Uttar Pradesh to be executed as BOT (Toll) project on DBFOT Pattern. Bid Document-I,
Bid Document-II,
Schedule-I
15th December 2009
46.
“Design, Engineering, Construction, Development, Finance, Operation and Maintenance Two Laning of Shillong Bypass Section of NH –40 & NH-44 from Km 61.800 of NH-40 to Km 34.850 of NH-44 in the State of Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis”. Extended Bid Due Date-VII
15th December 2009
47.
Design, Engineering, Construction, Development, Finance, Operation and Maintenance
Four Laning of Jorbat – Shillong (Barapani) Section of NH –40 from km 0.000 to Km. 61.800 of NH- 40 in the State of Assam and Meghalaya
under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis. Extended Bid Due Date-VI
15th December 2009
48.
Four laning of Sambalpur – Baragarh – Chattisgarh/Orissa Border Section of NH 6 Km. 0.00 to Km. 88.00 (Length – 88.00 Km.) in the State of Orissa under NHDP Phase III on DBFO pattern. Addendum/Corrigendum-III
14th December 2009
49.
Two Laning with paved shoulders of Rajmarg Chouraha –
Bareli section of NH-12 from Km 103.517 to km 201.750 in
the state of Madhya Pradesh under NHDP Phase IIIA on
BOT (Annuity) Basis. Cancellation
14th December 2009
50.
Design, Engineering, Finance, Construction, Operation and Maintenance of Two laning of Jabalpur - Rajmarg Crossing Section of NH 12 from km 10.400 to km 103.200 (92.8 km) in the State of Madhya. Cancellation
14th December 2009
51.
Invitation of Bids for round the clock Supervisor at Toll Plaza at Km. 64/200, Village Jaswantgarh, Tehsil-Gogunda, District-Udaipur of NH-76 to oversee and ensure smooth and efficient functioning of the plaza for one year. Bid Document
14th December 2009
52.
Two/Four Laning of Khagaria-Purnia Section of NH-31 (From Km 270.00 to Km 410.00) in the State of Bihar on Design, Build, Finance, Operate And Transfer on Bot (Annuity) Basis. Addendum
14th December 2009
53.
Six-Laning of Barwa Adda –Panagarh Section of NH-2 From Km 398/000 to 520/000 Including Panagarh Bypass in the States of Jharkhand & West Bengal Under NHDP Phase V on Bot(Toll) on Dbfot Pattern. Addendum
14th December 2009
54.
Design, Engineering,Finance,Construction,
Operation And Maintenance Of Hungund-Hospet Section Of NH-13 From Km
202.000 To Km 299.000 In The State Of Karnataka Under NHDP Phase III
On Design, Build,Finance,Operate And Transfer (DBFOT) Toll Basis.
Addendum-V
14th December 2009
55.
Upgradation, Operation and Maintenance of km.534.720 to km 556.840 of Hyderabad – Bengaluru Section of NH-7 in Karnataka to be executed as BOT (Toll) on Design, Build, Finance, Operate & Transfer (DBFOT) pattern under NHDP Phase-VII. Addendum-V
14th December 2009
56.
Design, Engineering,Finance,Construction,
Operation And Maintenance Of Bijapur- Hungund Section Of Nh-13 From
Km 102.000 To Km 202.000 In The State Of Karnataka Under NHDP Phase
III On Design, Build,Finance,Operate And Transfer (DBFOT) ) Toll
Basis . Addendum-V
14th December 2009
57.
Design, Engineering,Finance,Construction,
Operation and Maintenance Of Thiruvantpuram-TN/Kerala Border in The State Of
Kerala Under NHDP Phase III On Design, Build,Finance,Operate And Transfer
(DBFOT) ) Toll Basis.
Extension of Due Date
11th December 2009
58.
TWO LANING OF PIPRAKOTHI – RAXAUL SECTION OF NH - 28A (FROM KM 0.600 TO KM62.064) AND CONSTRUCTION OF 2-
LANE LINK ROAD FROM KM 62.064 TO ICP RAXAUL (7.33 KM LENGTH) IN THE STATE OF
BIHAR UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER ON
BOT (ANNUITY)BASIS.
Addendum-2(Revised RFQ)
11th December 2009
59.
Collection of USER Fee through private contractor on the basis of competitive bidding at
Km 301.700 (at Gangapada on NH – 5) for Km.362.000 to Km.297.000
on Sunakhala – Bhubaneswar Section of the National Highway No.5.
Bid Document,
Toll Notification,
Circular
11th December 2009
60.
Collection of USER Fee through private contractor on the basis of competitive bidding at
246th Km (near Manguli on NH – 5) for Km.297.000 to Km.227.000
on Bhubaneswar – Chhatia Section of the National Highway No.5.
Bid Document,
Toll Notification,
Circular
11th December 2009
61.
Collection of USER Fee through private contractor on the basis of competitive bidding
at Km 191.698 (at Panikoili on NH – 5) for Km.227.000 to Km.157.000
on Chhatia – Bhadrak Section of the National Highway No.5.
Bid Document,
Toll Notification,
Circular
11th December 2009
62.
Invitation for Prequalification of Contractor( REHABILITATION AND UPGRADATION TO 2 LANE WITH PAVED SHOULDERS OF ROAD SECTIONS IN THE STATE OF MADHYA PRADESH.
1. Narsinghpur-Amarwara Road (SH 47) 90 km
2. Amarwara-Umranala including bypass for Chindwara
(SH 47 &SH 19) 85 km
3. Umranala –Saoner ( SH 19 &SH 250) 70km
4. Multai – Chindwara (SH 26) 92 km
5. Chindwara – Seoni Road Section (SH 26) 69 km.)
Pre-Bid Meeting
2/4 Laning Of Ambala Kaithal Section
From Km 5.00 To Km 77.80 Of NH-65 To Be
Executed As BOT (Annuity) Project On
DBFO Pattern Under NHDP Phase III In The
State Of Haryana.
NIT,
RFQ
10th December 2009
66.
2/4 laning of Rohtak Jind Section from km 302.670
to km 352.250 of NH-71 to be executed
as BOT (Annuity) project on DBFO Pattern under NHDP Phase III in the
State of Haryana Project.
NIT,
RFQ
10th December 2009
67.
Consultancy Services for Feasibility study and Preparation of Detailed Project Report for widening/six laning/up gradation of
existing four lanned section of Narmada bridge & its approaches from Km. 192.00 to 198.00 on Ahmedabad-Mumbai Section of NH-8
and value addition works to Vadodara to Bharuch & Bharuch to Surat Section of NH-8.
Queries, Corrigendum
10th December 2009
68.
Four Laning Of
Ludhiana To Talwandi Section Of NH - 95 From Km 92.000 To Km 170.000 In The State Of Punjab To Be Executed
On BOT (Toll) On DBFOT Basis Under NHDP Phase III.
NIT,
RFQ
10th December 2009
69.
Design, Engineering, Finance, Construction, Operation And Maintenance Of 4 Laning Of
KNT/KL Border – Kannur Section Of NH – 17 In The State Of Kerala Under NHDP Phase III.
Amendment-II
9th December 2009
70.
Upgradation, Operation and Maintenance of km.534.720 to km 556.840
of Hyderabad – Bengaluru Section of NH-7 in Karnataka to be executed as BOT (Toll)
on Design, Build, Finance, Operate & Transfer (DBFOT) pattern under NHDP Phase-VII.
Addendum-II
9th December 2009
71.
Design, Engineering, Construction, Development, Finance, Operation and Maintenance
Four Laning of Jorbat – Shillong (Barapani) Section of NH –40 from km 0.000 to Km. 61.800 of NH- 40 in the State of Assam and Meghalaya
under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis.
Extended Bid Due Date-V
9th December 2009
72.
Design, Engineering, Construction, Development, Finance, Operation and Maintenance Two Laning of
Shillong Bypass Section of NH –40 & NH-44 from Km 61.800 of NH-40 to Km 34.850 of NH-44 in the State of Meghalaya
under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis
Extended Bid Due Date-VI
9th December 2009
73.
Short Term Improvements & Routine Maintenance of Rampur–Thariwan (Fatehpur) to Kokhraj
Section (km. 100 to km. 158) of NH-2 in the State of UP.
Volume-I,
Volume-II,
BOQ,
Summary
9th December 2009
74.
Six Laning of Indore - Dewas Section of NH-3 from Km 577.550 to Km 610.000 and Km 0.000 to Km 12.600 (Approx. Length 45.05 Km)
in the State of Madhya Pradesh under NHDP Phase-V to be executed as BOT (Toll) project on DBFOT Pattern.
Volume-I,
Volume-II,
Volume-III,
Schedule A to D,
Drawings
Consultancy Services For Operation And Maintenance Of Computerized Project Information System (CPIS).
NIT,
Bid Document
8th December 2009
77.
Four Laning of Krishnagar to Bahrampore section of NH-34 from Km. 115.000 to Km. 193.000 in the state of West Bengal (Package
No.NHDP-III/BOT/WB/02).
Extension of Bid Due date-VII
7th December 2009
78.
Four Laning of Raiganj - Dalkhola section of NH-34 from Km. 398.000 to Km. 452.7000 in the state of West Bengal (Package No.NHDP-III/BOT/WB/05).
Extension of Bid Due date-VII
7th December 2009
79.
PROCESS FOR FOUR-LANING OF NAGPUR - BETUL SECTION OF NH – 69 FROM KM 137 TO 257 IN THE STATE OF MP AND FROM KM 59.300 TO KM 3.0 IN THE
STATE OF MAHARASHTRA TO BE EXECUTED AS BOT (TOLL) ON DBFO PATTERN UNDER NHDP PHASE –IV.
NIT,
RFP
7th December 2009
80.
Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of Kolhapur – Sangli – Sholapur – Latur – Nanded – Wardha – Nagpur section of NH-7 & SH-6 in the state of Maharashtra. NIT,
RFP
7th December 2009
81.
4-Laning of Parwanoo- Solan Section of NH-22 Under NHDP III in the State of Himachal Pradesh on Design, Build, Finance, operate and transfer (DBFOT) Basis. Addendum-3 ,
Addendum-4
7th December 2009
82.
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR
INDEPENDENT ENGINEER FOR THE 4- LANING OF HAZIPUR-MUZAFFARPUR SECTION OF NH – 77 FROM KM 0.00 TO KM 46.300 AND CONSTRUCTION OF 16.870 KMS NEW MUZAFFARPUR BYPASS ON DBFOT (ANNUITY) BASIS UNDER NHDP PHASE - III.
NIT,
EOI
5th December 2009
83.
Six-Laning of Icchapuram-Srikakulam-Vishakhapatnam-Ankapalli-Rajahmundary Section of NH-5 From Km 470.000 to Km 901.753 (Length – 436km)in the State of Andhra Pradesh to be executed as Bot (Toll) on DBFOT Pattern Under Mega Infrastructure Highway Project NHDP Phase – V.
Corrigendum-II
5th December 2009
84.
PROVIDING SERVICES OF TECHNICAL MANPOWER VIZ NETWORK/ SYSTEM ADMINISTRATOR AND DESKTOP ADMINISTRATOR TO MAINTAIN COMPUTER HARDWARE, NETWORKING, CABLING & UPS etc. FOR SRINAGAR TOLL PLAZA AT KM 75 AND MAHUVAN TOLL PLAZA AT KM 164 ON NH-2 IN THE STATE OF HARYANA AND UTTAR PRADESH. NIT
4th December 2009
85.
PROVIDING SERVICES OF TECHNICAL MANPOWER VIZ NETWORK/ SYSTEM ADMINISTRATOR AND DESKTOP ADMINISTRATOR TO MAINTAIN COMPUTER HARDWARE, NETWORKING, CABLING & UPS etc. FOR SRINAGAR TOLL PLAZA AT KM 75 AND MAHUVAN TOLL PLAZA AT KM 164 ON NH-2 IN THE STATE OF HARYANA AND UTTAR PRADESH. NIT
4th December 2009
86.
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR
INDEPENDENT ENGINEER FOR THE 4- LANING OF NHs IN THE STATE OF KARNATAKA ON DBFOT BASIS UNDER NHDP PHASE - III
EOI,
Clarification
4th December 2009
87.
4 lane of new Ranchi Bypass between km 112+400 and km 134+250 (existing chainage) of
NH 33 & widening of 2 lane mainline section of NH 33 to a 4 lane divided carriageway from km
134+250 to km 277.50 (existing chainage) in the state of Jharkhand under NHDP phase III
Project Addendum-V
4th December 2009
88.
“Design, Engineering, Construction, Development, Finance, Operation and Maintenance Two Laning of Shillong Bypass Section of NH –40 & NH-44 from Km 61.800 of NH-40 to Km 34.850 of NH-44 in the State of Meghalaya under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis”. Corrigendum-II
4th December 2009
89.
Design, Engineering, Construction, Development, Finance, Operation and Maintenance
Four Laning of Jorbat – Shillong (Barapani) Section of NH –40 from km 0.000 to Km. 61.800 of NH- 40 in the State of Assam and Meghalaya
under SARDP-NE on Build, Operate and Transfer (BOT) (Annuity) Basis. Corrigendum-II
4th December 2009
90.
Rehabilitation, Strengthening and Four Laning of Ramban to Banihal Section of NH-1A, from Km 151.000 to Km 187.000 on BOT (Annuity) basis on DBFO pattern in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/I/J&K)”Project.
Addendum-I
4th December 2009
91.
Rehabilitation, Strengthening and Four Laning of Udhampur to Ramban Section of NH-1A, from Km 67.00 to Km 89.00 and Km 130.00 to Km 151.00 on BOT (Annuity) basis on DBFO Pattern, in the State of Jammu & Kashmir (Pkg No:- NHDP-Phase-II/BOT/IV/J&K) Project
Addendum-I
4th December 2009
92.
Rehabilitation, Strengthening and Four Laning of Srinagar to Banihal Section from Km 187.000 to Km 189.350 (Banihal Bypass) and Km 220.700 to Km 286.110 of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/I/J&K)”Project. Addendum-I
4th December 2009
93.
Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Quazigund - Banihal Section from Km 189.350 to Km 204.700 including two tunnels (2 Lane) of 0.69 kms and 8.45 kms of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/II/J&K)”Project on BOT (Annuity) basis.
Addendum-I
4th December 2009
94.
Four Laning of Chenani to Nashri Section of NH-1A from Km 89.00 to 130.00 (new alignment) of NH-1A including 9 Km long tunnel (2 lane) with parallel escape tunnel in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/V/J&K)”.
Addendum-I
4th December 2009
95.
Rehabilitation, Strengthening and Four Laning of Srinagar to Banihal Section from Km 187.000 to Km 189.350 (Banihal Bypass) and Km 220.700 to Km 286.110 of NH 1-A in the State of Jammu & Kashmir (Package No. NHDP-Phase-II/BOT/I/J&K)”Project.
Addendum-I
4th December 2009
96.
4/6 laning of Maharashtra/Goa Border to Panaji-Goa/Karnataka Border section of NH-17 in the State of Goa under NHDP Phase-III-Reg RFP. Corrigendum-II
4th December 2009
97.
Independent Consultancy services for Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Hyderabad-Vijayawada Section from Km 40.000 to Km 221.500 of NH-9 in the state of Andhra Pradesh under NHDP Phase-III (Package No.NHDP-III/BOT/AP/01).
. Letter
4th December 2009
98.
Independent Engineer services for development of New Four lane Elevated Road from Chennai Port to Maduravoyal (NH-4) in the State of Tamil Nadu under NHDP Ph-VII on BOT(Toll) basis. RFP
3rd December 2009
99.
Six laning of Kishangarh - Udaipur section of NH- 79A, 79 & 76 from km. 364.00 of NH-8 to km 113.800 of NH-76 (length –315.00 km.) in the State of Rajasthan on BOT (Toll) following by DBFO Pattern under NHDP Phase-V: Submission of RFP. RFP Cancelled
3rd December 2009
100.
Independent Consultancy services for Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Hyderabad-Vijayawada Section from Km 40.000 to Km 221.500 of NH-9 in the state of Andhra Pradesh under NHDP Phase-III (Package No.NHDP-III/BOT/AP/01).
. RFP
3rd December 2009
101.
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE WORK OF DESIGN, ENGINEERING, FINANCE, PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF “4 laning of Cherthalai - Ochira Section of NH – 47 from Km 379.100 to Km 465.000” AND “4 laning of Ochira – Thiruvananthapuram Section of NH – 47 from Km 465.000 to Km 551.900”IN THE STATE OF KERALA UNDER NHDP PHASE III ON DBFOT BASIS.
EOI
2nd December 2009
102.
TWO LANING OF PIPRAKOTHI – RAXAUL SECTION OF NH - 28A (FROM KM 0.600 TO KM62.064) AND CONSTRUCTION OF 2-
LANE LINK ROAD FROM KM 62.064 TO ICP RAXAUL (7.33 KM LENGTH) IN THE STATE OF
BIHAR UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER ON
BOT (ANNUITY)BASIS. Addendum-I
2nd December 2009
103.
Design, Engineering, Finance, Construction, Operation and Maintenance of Two laning of Rajmarg Crossing-Bareli Section of NH 12 from km 10.400 to km 103.200 (92.8 km) in the State of Madhya Pradesh.
RFQ
2nd December 2009
104.
“Application for the post of GM (Name of the post) for absorption”. Extend Date
2nd December 2009
105.
TWO LANING OF FORBESGANJ–JOGBANISECTION OF NH - 57A (FROM KM0.000 13.000)
AND CONSTRUCTION OF 2- LANE LINK ROAD TO ICP, JOGBANI (1.5 KM LENGTH) IN THE
STATE OF BIHAR UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER ON BOT
(ANNUITY) BASIS. Addendum-I