Title
Posted On
1.
Consultancy Services for Preparation of Detailed Project Report for improvement of Road Aesthetics on selected stretches of National Highways.
2.
User fee auditor at Srinagar Toll Plaza at Km.74.5 on NH-2 in the State of Haryana.
3.
Transplantation of trees from Andheri More of Delhi – Haryana Border) of NH-236
4.
Taking away the salvage in the form of timber & fuel wood of the felled trees from km 248.00 to 252.00 & km 255.00 to 270.00 section of NH-47 in the State of Kerala
5.
2-laning with paved shoulder of Jowai to Meghalaya /Assam Border section from km 69.200 to km 173.200 of NH - 44 in the State of Meghalaya under National Highway Development Programme (NHDP-III) on Design, Built, Finance, Operation and Transfer on BOT(Annuity) basis(Package No. NHDP-III/BOT/Mehalaya/06).
6.
4-laning of Jorhat to Demow section from km 453.00 to km 534.800 of NH - 37 in the State of Assam under Special Accelerated Road Development Programme in North Eastern Region (SARDP-NE) on Design, Built, Finance, Operation and Transfer on BOT(Annuity) basis(Package No. SARDP/BOT/Assam/03).
7.
Four laning of Numaligarh (NH 39 junction) to Jorhat from Km 403.200 to Km 454.365 of NH - 37 in the State of Assam under Special Accelerated Road Development Programme in North Eastern Region (SARDP-NE) on Design, Built, Finance, Operation and Transfer on BOT(Annuity) basis (Package No. SARDP-NE/BOT/ASM/04).
8.
PROVIDING SERVICES OF TECHNICAL MANPOWER VIZ NETWORK/ SYSTEM ADMINISTRATOR(03 Nos.) AND DESKTOP ADMINISTRATOR (03 Nos.) TO MAINTAIN COMPUTER HARDWARE, NETWORKING, CABLING & UPS etc. FOR TOLL PLAZA AT DASNA IN Km. 29/30 OF GHAZIABAD-HAPUR BYPASS SECTION OF NH-24 IN THE STATE OF UTTAR PRADESH
9.
Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation Rajasthan Border to Fatehpur section of NH-65 in the state of Rajasthan
10.
Consultancy Services for Automated Data Collection , Updation and Management of Road Information System for NHDP Corridors .
11.
BALANCE WORK OF SHIFTING, ERECTING AND LAYING OF ELECTRICAL POLES/LINES (OVERHEAD/UNDERGROUND) OF 33 KV, 11 KV AND LT LINES AND DISTRIBUTION TRANSFORMERS FROM THE EXISTING POSITION TO BEYOND TOE LINE / ROW BETWEEN KM 983.00 TO KM 1111.00 OF NH-31 IN STATE OF ASSAM
12.
DEVELOPMENT AND OPERATION OF VARANASI-GORAKHPUR SECTION OF NH-29 FROM KM 2.225 TO KM 208.5 IN THE STATE OF UTTAR PRADESH ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS.
13.
Six laning of Delhi-Agra Section of NH-2 from km 20.500 to 200.00 on DBFOT (Toll) basis under NHDP V in the State of Haryana & Uttar Pradesh.
14.
Two laning with paved shoulders of Muzaffarpur-Sonbarsa section of NH-77 from km 0.00 to km 89.00 in the State of Bihar under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis”Project.
15.
Clearing of Jungle in NHAI vacant land of NHAI, in front of NHAI HQ, G-5 & 6, Sector 10, Dwarka, New Delhi-75
16.
Short term improvement and routine maintenance of Nellore - Chilakaluripet Section from km. 1366.547 to km. 1183.027 of NH-5 in the State of Andhra Pradesh
17.
Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and Upgradation of stretches under NHDP Phase-IVA& B in the state of Maharashtra