1.
|
Providing, fixing and installation of 10 KVA Generator for office use.
Corrigendum
|
11th March 2010 |
|
2.
|
Two laning with paved shoulders of Muzaffarpur-Sonbarsa section of NH-77 from km 0.00 to km 89.00 in the State of Bihar under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis”Project.
Addendum,
Amendment-V
|
11th March 2010 |
|
3.
|
2 Laning of Rohtak Hissar section from km 87.000 to km 170.00 of NH-10 to be executed as BOT(Toll) Project on DBFO Pattern under NHDP Phase III in the State of
Haryana.
Extended Due Date-II
|
11th March 2010 |
|
4.
|
CONSULTANCY SERVICES FOR SUPERVISION OF OPERATION AND ROUTINE MAINTENANCE CONTRACT OF NHAI CORPORATE OFFICE BUILDING AT DWARKA,NEW DELHI.
RFP
|
11th March 2010 |
|
5.
|
FOR DEVELOPMENT AND MAINTENANCE OF BILL TRACKING SYSTEM
Bid Document
|
11th March 2010 |
|
6.
|
Two laning with paved shoulders of Muzaffarpur-Sonbarsa section of NH-77 from km 0.00 to km 89.00 in the State of Bihar under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis”Project.
Addendum
|
11th March 2010 |
|
7.
|
DESIGN, ENGINEERING, CONSTRUCTION, DEVELOPMENT, FINANCE, OPERATION AND MAINTENANCE OF BARASAT TO KRISHNAGAR SECTION OF NH- 34 (KM 31.000 TO KM. 115.000) IN THE STATE OF WEST BENGAL UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS.
Amendment-IV
|
11th March 2010 |
|
8.
|
Supply, Installation, Testing and Commissioning of 25 Mtr High Mast light at proposed Toll Plaza in Km 121.975 of NH-24 in the state of Uttar Pradesh.
NIT,
Cover page
|
11th March 2010 |
|
9.
|
RFP for two laning with paved shoulders of Mokama Munger section of NH-80 from km 1.430 to km 70.00 in the State of Bihar under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis” Project.
RFP ,
Addendum
|
11th March 2010 |
|
10.
|
PROVIDING GUARDING SERVICES IN NHAI HEADQUARTERS, DWARKA.
Advertisement , Financial , Technical
|
10th March 2010 |
|
11.
|
Short term improvement and routine maintenance of Nellore - Chilakaluripet Section from km. 1366.547 to km. 1183.027 of NH-5 in the State of Andhra Pradesh.
Vol-I,
Vol-II,
BOQ
|
10th March 2010 |
|
12.
|
Short term improvement and routine maintenance of Ghaziabad-Hapur Section from Km. 27.643 to km 48.638 and Hapur bypass (km. 48.638 to km 60) of NH – 24 in the State of Uttar Pradesh.
Vol-I,
Vol-II,
BOQ
|
10th March 2010 |
|
13.
|
Invitation of RFP for Two/Four-laning of Bakhtiyarpur-Khagaria section of NH-31 from km 153.300 to km 273.450 in the State of Bihar under NHDP Phase-III on BOT (Toll) Basis
Addendum
|
10th March 2010 |
|
14.
|
Result of Interview held on 22,23,24&25 Feb 2010 for recruitment of
Manager(Tech) on deputation basis in NHAI
Result
|
10th March 2010 |
|
15.
|
EXPRESSION OF INTEREST FOR PRE-QUALIFICATION OF AGENCIES FOR PROVIDING CATERING SERVICES & RUNNING OF GUEST HOUSE AT NHAI, NEW DELHI.
Bid Document
|
10th March 2010 |
|
16.
|
Four/Two Laning of Chandikhole-Dubari-Talcher Section of NH 200 from Km 301.890 to km 428.030 in the State of Orissa to be executed as BOT (Toll) project on DBFOT Pattern under NHDP Phase III – Invitation to the pre-qualified Applicants for RFP- reg.
Letter-II,
Coorigendum-II,
Replies to Pre-bid Queries
|
10th March 2010 |
|
17.
|
RFP for Four Laning of Patna to Bakhtiyarpur section of NH 30 from Km 181.300 to Km 231.950 in the State of Bihar on BOT (Toll) project on DBFO pattern under NHDP Phase III Project.
Addendum
|
9th March 2010 |
|
18.
|
Invitation of RFP for Two -Laning of Gopalganj-Chhapra section of NH-85
from km 0.00 to km 94.70 in the State of Bihar under NHDP Phase-III on BOT
(Toll) Basis.
Addendum
|
9th March 2010 |
|
19.
|
RFP for Six Laning of Varanasi - Aurangabad Section of NH-2 from km 786.000 to km 978.400 (Length – 192.400 Km) in the State of Uttar Pradesh and Bihar under NHDP Phase V to be executed as DBFOT (Toll) Project.
Prebid Clarifications & Amendment
|
9th March 2010 |
|
20.
|
Four/Two Laning of Panikoili - Rimuli Section from Km 00.00 to km 163.00 of NH-215 in the State of Orissa to be executed as BOT (Toll) project on DBFOT Pattern under NHDP Phase III – Invitation to the pre-qualified Applicant for RFP- reg.
Coorigendum
|
9th March 2010 |
|
21.
|
RFP for Four/Two Laning of Rimuli-Roxy-Rajamunda Section of NH 215 from km 163.00 to km 269.00 (design chainage Km 163.00 to Km 259.453) in the State of Orissa to be executed as BOT (Toll) Project on DBFOT Pattern under NHDP Phase III Project
Letter-II,
Coorigendum,
Letter
|
9th March 2010 |
|
22.
|
Providing, fixing and installation 6 computers and 4 printers for office use.
Bid Document
|
9th March 2010 |
|
23.
|
Four laning of Deoli-Kota Section of NH-12 from km. 165.000 to junction of NH-76 on Kota Bypass (Approx. length 83.04 km) in the State of Rajasthan on BOT (Toll) project on DBFOT pattern under NHDP Phase – III.
Addendum
|
9th March 2010 |
|
24.
|
Four Laning of Pali - Pindwara section of NH-14 from Km 115.000 to Km 244.120 (Approx. Length 129.12 Km) in the State of Rajasthan on BOT (Toll) project on DBFO Pattern under NHDP Phase III.
Addendum
|
9th March 2010 |
|
25.
|
Four Laning of Beawar - Pali section of NH-14 from Km 0+000 to Km 115+000 (Approx. Length 115 Km) in the State of Rajasthan on BOT (Toll) project on DBFO Pattern under NHDP Phase III.
Addendum
|
9th March 2010 |
|
26.
|
Four laning of Bhubaneswar – Puri Section from km 0.00 to km 59.00 of NH-203 in the State of Orissa to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase III Project
RFP,
Letter
|
9th March 2010 |
|
27.
|
Construction of Canopy at Srirampur Toll Plaza at 4th Km. on Chandikhole – Paradip Section of NH – 5A in the State of Orissa.
Bid Document,
Drawing
|
9th March 2010 |
|
28.
|
Invitation of RFP for Two/Four-laning of Purnea-Khagaria section of NH-31 from km 270.00 to km 410.00 in the State of Bihar under NHDP Phase-III on BOT (Toll) Basis
Pre Bid Meeting
|
9th March 2010 |
|
29.
|
RFP for Four Laning of Patna to Bakhtiyarpur section of NH 30 from Km 181.300 to Km 231.950 in the State of Bihar on BOT (Toll) project on DBFO pattern under NHDP Phase III Project.
Pre Bid Meeting
|
9th March 2010 |
|
30.
|
Rehabilitation and Upgrading of existing intermediate lane roads to 2 lane with paved shoulders of Forbesganj – Jogbani (km 0.000 to km 9.258) on NH-57A in the state of Bihar under NHDP Phase – III on DBFOT Annuity basis Project.
Pre Bid Meeting
|
9th March 2010 |
|
31.
|
Two Laning of Piprakothi – Raxaul Section of NH – 28A (From km 0.600 to km 62.064) and construction of 2- Lane Link Road from km 62.064 to ICP Raxaul (7.33 km length) in the state of Bihar under NHDP phase III on Design, Build, Finance, Operate and Transfer on BOT (Toll) basis.
Pre Bid Meeting
|
9th March 2010 |
|
32.
|
Toll Supervisor & Assistant Toll Supervisor at Km 250.700, 310.200 & 376.075 in the stretch of Hyderabad to Bangalore Section on NH-7 in the State of Andhra Pradesh.
Bid Document-II
|
9th March 2010 |
|
33.
|
Marking of centerline alignment using total station from Km.0.000 to Km.84.124 of Belgaum – Goa / Karnataka Border of NH-4A in the State of Karnataka.
Amendment
|
9th March 2010 |
|
34.
|
Four laning of Sambalpur – Baragarh –Orissa/Chattisgarh Border Section from km 0.00 to km 88.00 of NH-6 in the State of Orissa to be executed as BOT(Toll) project on DBFOT pattern on DBFOT pattern under NHDP Phase III –invitation to the pre-qualified Applicant for RFP.
Letter,
RFP
|
9th March 2010 |
|
35.
|
CONSULTANCY SERVICES FOR SUPERVISION OF SHORT TERM IMPROVEMENT AND ROUTINE MAINTENANCE CONTRACT OF
1. VANIYAMBADI to WALAJAPET From Km. 50.112 TO Km. 148.201 of NH-46 AND FROM WALJAPET TO CHENNAI FROM Km. 13.8 to 107.2 OF NH-4 IN THE STATE OF TAMIL NADU
2. BARWA ADDA (KM. 398.750) TO PANAGARH (KM. 515.236) IN THE STATE OF WEST BENGAL AND JHARKHAND OF NH-2.
3. DANKUNI-KOLAGHAT-KHARAGPUR SECTION (KM. 17.60 TO KM. 136.00) OF NH-6 AND DANKUNI-PALSIT SECTION (KM. 647.368 TO KM. 645.546) OF NH-2 IN THE STATE OF WEST BENGAL
RFP FOR THREE PKG,
Annexure 6,
Annexure- V _A,
Annexure- V (B),
Annexure- V _C
|
9th March 2010 |
|
36.
|
Rehabilitation and Up-gradation to 2 lane with paved shoulders of Multai – Chhindwara – Seoni section of NH 69A and Narsinghpur - Amarawara – Chhindwara – Saoner section of NH 26B, in Madhya Pradesh and Maharashtra including construction of Ring Road and connecting roads in Chhindwara Town
Corrigendum
|
9th March 2010 |
|
37.
|
Four Laning of Up/Haryana Border-Yamunanagar-Saha-Barwala-Panchkula Section of NH-73 From Km 71.640 to Km 179.285 in the State of Haryana Under NHDP Phase III on Design, Build, Finance, Operate And Transfer (The “DBFOT”) Basis.
Addendum-II
|
8th March 2010 |
|
38.
|
Supply & Erection of Prefabricated portable cabins at proposed Toll Plaza in Km 121.975 of NH-24 in the state of Uttar Pradesh.
Drawings
|
8th March 2010 |
|
39.
|
PROVIDING SERVICES OF TECHNICAL MANPOWER VIZ NETWORK/ SYSTEM ADMINISTRATOR (03 Nos) AND DESKTOP ADMINISTRATOR (03Nos) TO MAINTAIN COMPUTER HARDWARE, NETWORKING, CABLING & UPS etc. AT PROPOSED FEE PLAZAS AT Km.18+652(KAPPALUR) ON NH-7 IN THE STATE OF TAMILNADU.
Vol-I,
Vol-II
|
8th March 2010 |
|
40.
|
PROPOSAL FOR EMPANELMENT OF USER FEE AUDITOR FOR USER FEE PLAZA AT KM.74+930(ETTURVATTAM) OF VIRUDHUNAGAR TO KOVILPATTI SECTION ON NH-7 IN THE STATE OF TAMILNADU.
Vol-I,
Vol-II
|
8th March 2010 |
|
41.
|
Providing services of Technical manpower viz Network/ System Administrator and Desktop Administrator to maintain computer hardware, networking, cabling & ups etc. for the Raksha Toll Plaza at Raksha village in District Jhansi U.P. at km 85 of NH-25
NIT,
Bid Document
|
8th March 2010 |
|
42.
|
Supply, Installation, Commissioning and Maintenance of Computers & Peripherals at Raksha Toll Plaza, Km. 85.00 of NH – 25 at Jhansi district in the state of Uttar Pradesh.
NIT,
Bid Document
|
8th March 2010 |
|
43.
|
DESIGN, ENGINEERING, CONSTRUCTION, DEVELOPMENT, FINANCE, OPERATION AND MAINTENANCE OF BARASAT TO KRISHNAGAR SECTION OF NH- 34 (KM 31.000 TO KM. 115.000) IN THE STATE OF WEST BENGAL UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS.
Amendment-I
|
8th March 2010 |
|
44.
|
Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Quazigund - Banihal Section from Km 189.350 to Km 204.700 including two tunnels (2 Lane) of 0.69 kms and 8.45 kms of NH 1-A in the State of Jammu & Kashmir (Package No.
NHDP-Phase-II/BOT/II/J&K)”Project on BOT (Annuity) basis.
Corrigendum-IV
|
8th March 2010 |
|
45.
|
Four Laning of Chenani to Nashri Section of NH-1A from Km 89.00 to 130.00 (new alignment) of NH-1A including 9 Km long tunnel (2 lane) with parallel escape tunnel in the State of Jammu & Kashmir (Package No.
NHDP-Phase-II/BOT/V/J&K)”.
Corrigendum-IV
|
8th March 2010 |
|
46.
|
Rehabilitation, Strengthening and Four Laning of Jammu to Udhampur Section from Km 15.000 (Jammu Bypass) to Km 67.000 of NH 1-A in the State of Jammu & Kashmir (Package No.
NHDP-Phase-II/BOT/VI/J&K)”Project.
Corrigendum-IV
|
8th March 2010 |
|
47.
|
Rehabilitation, Strengthening and Four Laning of Ramban to Banihal Section of NH-1A, from Km 151.000 to Km 187.000 on BOT (Annuity) basis on DBFO pattern in the State of Jammu & Kashmir (Package No.
NHDP-Phase-II/BOT/I/J&K)”Project.
Corrigendum-IV
|
8th March 2010 |
|
48.
|
Rehabilitation, Strengthening and Four Laning of Udhampur to Ramban Section of NH-1A, from Km 67.00 to Km 89.00 and Km 130.00 to Km 151.00 on BOT (Annuity) basis on DBFO Pattern, in the State of Jammu & Kashmir (Pkg No:- NHDP-Phase-II/BOT/IV/J&K) Project
Corrigendum-IV
|
8th March 2010 |
|
49.
|
Rehabilitation, Strengthening and Four Laning of Srinagar to Banihal Section from Km 187.000 to Km 189.350
(Banihal Bypass) and Km 220.700 to Km 286.110 of NH 1-A in the State of Jammu & Kashmir (Package No.
NHDP-Phase-II/BOT/I/J&K)”Project.
Corrigendum-IV
|
8th March 2010 |
|
50.
|
Two-laning of Trichy-Karaikudi including Trichy bypass road Section of NH-210 (km 10.00 to km 94.00) and bypass (Km 109.558 to Km 135.930) in the State of Tamil Nadu under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis.
Letter
|
8th March 2010 |
|
51.
|
Two-laning with paved shoulder of Dindigul-Theni section km 2.750 to km 73.400 of NH-45 (Extn) and Theni-Kumili Section from km 215.500 to km 273.600 of NH-220 in the State of Tamil Nadu under NHDP III on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis.
Letter
|
8th March 2010 |
|
52.
|
Application for the post of DGM (Tech) on Deputation
basis
Interview
date postponed
|
6th March 2010 |
|
53.
|
Providing, Running & Maintenance of Non-AC vehicle for DGR agency and Generators at Kali Nadi Brideg Toll Plaza in Km 60.00 on NH-24 in the state of Uttar Pradesh.
NIT
|
6th March 2010 |
|
54.
|
Supervision of Toll Operation Kali Nadi Toll Plaza in km 60 on NH-24 in Ghaziabad District in the State of Uttar Pradesh.
NIT,
Bid Document
|
6th March 2010 |
|
55.
|
Supply & Erection of Prefabricated portable cabins at proposed Toll Plaza in Km 121.975 of NH-24 in the state of Uttar Pradesh.
NIT,
Bid Document
|
6th March 2010 |
|
56.
|
"Providing and Maintaining of Computer Hardware on Hire Basis at Kali Nadi Toll Plaza in km 60 on NH-24 in Ghaziabad District in State of Uttar Pradesh"
NIT,
Bid Document,
Cover page
|
6th March 2010 |
|
57.
|
User Fee Audit for Toll operations For Fee Plaza at Kali Nadi Bridge in Km 60 on NH-24 in the state of Uttar Pradesh.
NIT,
Bid Document
|
6th March 2010 |
|
58.
|
Toll Supervisor & Assistant Toll Supervisor at Km 250.700, 310.200 & 376.075 in the stretch of Hyderabad to Bangalore Section on NH-7 in the State of Andhra Pradesh.
Bid Document
|
5th March 2010 |
|
59.
|
Four Laning of Ranchi Rargaon Jamshedpur section from km 114.000 to km 277.500 of NH-33 in the state of Jharkhand Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis under NHDP phase-III Project
RFP
|
5th March 2010 |
|
60.
|
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR 6- LANING OF STRETCHES OF NATIONAL HIGHWAYS AND UPGRADATION OF NATIONAL HIGHWAYS IN THE STATE OF KARNATAKA UNDER NHDP PHASE – V & VII TO BE EXECUTED AS BOT PROJECT ON DBFO BASIS
NIT,
EOI
|
5th March 2010 |
|
61.
|
HOUSE-KEEPING SERVICES AT NHAI CORPORATE OFFICE (FINANCIAL BID)(2nd CALL).
Financial
HOUSE-KEEPING SERVICES AT NHAI CORPORATE OFFICE(TECHNICAL BID) (2nd CALL)
Technical
|
5th March 2010 |
|
62.
|
Marking of centerline alignment using total station from Km.0.000 to Km.84.124 of Belgaum – Goa / Karnataka Border of NH-4A in the State of Karnataka.
Bid Document
|
5th March 2010 |
|
63.
|
Providing, fixing and installation of 10 KVA Generator for office use.
Notice
|
5th March 2010 |
|
64.
|
Six laning of NH-7 from Hosur (km 33.130) to Krishnagiri(km 93.000) approx. length 59.870 km in the State of Tamil Nadu under NHDP Phase-V.
Letter
|
5th March 2010 |
|
65.
|
Four Laning of Tirupati - Tiruthani - Chennai Section of NH-205 from km 274.800 to km 341.600 in the State of Andhra Pradesh and km 0.00 to km 59.600 in the State of Tamil Nadu under NHDP Phase III A on BOT Basis.
Letter
|
5th March 2010 |
|
66.
|
Independent Engineer services for 4/6 laning of Ghaziabad-Aligarh Section of NH-91 from km 23.600 to km 140.200 in the state of Uttar Pradesh on DBFOT basis under NHDP-Phase III on DBFOT Basis under NHDP-Phase-III
RFP
|
4th March 2010 |
|
67.
|
NHAI INVITES QUOTATION FOR PRINTING OF BROCHURES OF THE FOLLOWING SPECIFICATION
Advertisement
Addendum
|
4th March 2010 |
|
68.
|
6- Laning of Chandikhole – Jagatpur – Bhubaneshwar Section from Km 413.000 to km 418.00 and from km 0.000 to km 62.000 of NH-5 in the State of Orissa to be executed as BOT (Toll) project on DBFO Pattern under NHDP Phase V – RFP regarding
.
Letter,
RFP
|
4th March 2010 |
|
69.
|
Rehabilitation and Up-gradation to 2 lane with paved shoulders of Multai – Chhindwara – Seoni section of NH 69A and Narsinghpur - Amarawara – Chhindwara – Saoner section of NH 26B, in Madhya Pradesh and Maharashtra including construction of Ring Road and connecting roads in Chhindwara Town
clarification
|
4th March 2010 |
|
70.
|
INVITATION OF PROPOSALS FOR EXPRESSION OF INTEREST FOR INDEPENDENT ENGINEER FOR THE 6- LANING OF NHs IN THE STATE OF GUJARAT ON DBFOT BASIS.
EOI
|
4th March 2010 |
|
71.
|
Quotation for Ambulance of tow way vehicle schedule.
Bid Document
|
4th March 2010 |
|
72.
|
Routine Maintenance of Road & Road property and Incident Management for the Chittorgarh Bypass (Km. 159.00 of NH-79 to Km. 213.00 of NH-76) in the State of Rajasthan.
NIT, Vol-I, Vol-II
|
3rd March 2010 |
|
73.
|
RFP for Four Laning of Barhi Hazaribagh Section from km 0.00 to km 40.500 of NH-33 in the State of Jharkhand on Design, Built, Finance, Operate and Transfer (DBFOT) Toll basis under NHDP Phase III Project
Letter,
RFP
|
3rd March 2010 |
|
74.
|
Flood Damage Repairs for Chennai – Tiruttani section of NH-205 from Km.0/000 – Km.45/200 in the State of Tamil Nadu.
Vol-I,
Vol-II
|
3rd March 2010 |
|
75.
|
Six laning of Chilakaluripeta - Nellore Section of NH-5 from km 1182.802 to km 1366.547 (appr. length-184.545 km) in the State of Andhra Pradesh under NHDP Phase V to be executed as BOT (Toll) Project on DBFO Pattern
RFP
|
3rd March 2010 |
|
76.
|
DESIGN, ENGINEERING, CONSTRUCTION, DEVELOPMENT, FINANCE, OPERATION AND MAINTENANCE OF BARASAT TO KRISHNAGAR SECTION OF NH- 34 (KM 31.000 TO KM. 115.000) IN THE STATE OF WEST BENGAL UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS.
Amendment
|
3rd March 2010 |
|
77.
|
Engagement of User fee Auditor at toll plaza Sikandra in Km 399 of NH-2.
NIT,
Bid Document,
Bid Document
|
3rd March 2010 |
|
78.
|
Engagement of User fee Auditor at toll plaza Purwameer in km 506.262 of NH-2.
NIT,
Bid Document,
Bid Document
|
3rd March 2010 |
|
79.
|
Four Laning of Up/Haryana Border-Yamunanagar-Saha-Barwala-Panchkula Section of NH-73 From Km 71.640 to Km 179.285 in the State of Haryana Under NHDP Phase III on Design, Build, Finance, Operate And Transfer (The “DBFOT”) Basis.
Extended Due Date ,
Replies to prebid queries ,
Addendum-I
|
2nd March 2010 |
|
80.
|
2/4 Laning Of Ambala Kaithal Section
From Km 5.00 To Km 77.80 Of NH-65 To Be
Executed As BOT (Toll) Project On
DBFO Pattern Under NHDP Phase III In The
State Of Haryana.
Extended Due Date-VI
|
2nd March 2010 |
|
81.
|
Rehabilitation, Strengthening and Four Laning of Jammu to Udhampur Section from Km 15.000 (Jammu Bypass) to Km 67.000 of NH 1-A in the State of Jammu & Kashmir (Package No.
NHDP-Phase-II/BOT/VI/J&K)”Project.
Addendum-III
|
2nd March 2010 |
|
82.
|
NHAI INVITES QUOTATION FOR PRINTING OF BROCHURES OF THE FOLLOWING SPECIFICATION
|
2nd March 2010 |
|
83.
|
Improvement of Dhaula Kuan ( km 11 ) to RTR ( km 13.700) section of NH-8 in Delhi.
Vol-I,
Vol-II,
BOQ
|
2nd March 2010 |