1 Rehabilitation and Upgradation to Four Laning of Banjhabahal to Telebani Section(km.414.982 to km.492.590) of NH-6 in the State of Odisha, on Design,Build,Finance,Operate and Transfer,BOT (Toll) basis under NHDP Phase-IV – Invitation of RFP

List of Pre-qualified Applicants, Reply to query, Corrigendum,

2 Four Laning / Two Laning with paved shoulder from Telebani to Sambalpur Section  (Km 492.590 to Km 567.400) of NH-6 in the State of Odisha on Design, Build, Finance, Operate and Transfer, BOT(Toll) Basis Under NHDP-IV

List of Pre-qualified Applicants,

3
Four Laning from Singhara to Binjabahal Section(Km 310.806 to Km 414.982) of NH-6 in the State of Odisha on Design, Build, Finance, Operate and Transfer, BOT(Toll) Basis Under NHDP-IV

List of Pre-qualified Applicants,

4 Turnkey implementation of Enterprise Resource Planning (ERP) Solution at MoRTH and NHAI

Letter to Bidders,

5 Expression Of Interest (EOI) from Experienced reputed Firms / Agencies having expertise service with respect to Repair / Rehabilitation work of old Bridge - short term & long term repairs as to be suggested, structural health monitoring etc for old rehabilitated Bridge across Narmada river at Km. 193.000 -194.400 at Bharuch in between section from Km 192.00 to 198.00 on Vadodara- Surat section of NH-8 in the state of Gujarat.

Letter to Bidders,

6 Short term bid for Design, Provision and Fixing of space frame structure for Toll Canopy for implementation of Electronic Toll Collection (ETC) Systems at Barsoni Toll Plaza in km 416.000 of NH-31 in the State of Bihar.- 2nd Call)

NIT, Bid Vol-I, Bid Vol-II, Bid Vol-III,

24th  February
2015(On e-Tend
ering Mode)
7 Four Laning of Parwanoo - Solan Section of NH-22 (Now NH-5) from Km. 67.000 to Km. 106.139, under NHDP Phase-III on EPC basis in the State of Himachal Pradesh.

NIT, RFP, Reply to Pre-bid Queries-I, Reply to Pre-bid Queries-II, Corrigendum-I, Corrigendum-II, Corrigendum-III, Corrigendum-IV, Corrigendum-V,

24th  February
2015(On e-Tend
ering Mode)
8 Consultancy Services for Preparation of Feasibility-cum-Detailed Project Report for 4-laning of Ropar-Nawashahir-Banga-Phagwara Section of National Highway No. 344 A in the State of Punjab on EPC mode.

NIT, RFP,

24th  February 2015(On e-Tendering Mode)
9 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING THROUGH ON E-TENDER BASIS ONLY AT MUZAINA HETIM TOLL PLAZA AT KM 307.000 IN THE SECTION FROM KM. 279.800 TO KM. 320.800 ON THE NATIONAL HIGHWAY NO. 28 (GORAKHPUR KASIYA SECTION) IN THE STATE OF UTTAR PRADESH.

NIT, Bid Document,

24th  February
2015(On e-Tend
ering Mode)
10 Providing, running & maintenance of commercial vehicle on monthly bases for PIU-Shimla at H.P.

NIQBid DocumentCorrigendum-I,

25th  February
2015
11 Operation and maintenance of Edapally – Vytilla - Aroor Section of NH – 66 (Formerly NH – 47) from km 342.000 to km. 358.750 in the state of Kerala on OMT basis.

Bid Vol-I, DCA, E-Tender Process, Corrigendum-I, Corrigendum-II, Reply to pre-bid Queries, Corrigendum-III,

26th February
2015(On e-Tend
ering Mode)
12 AUCTION OF PLANT / EQUIPMENTS / MACHINERIES, SHUTTERING, SCAFFOLDINGS, PRECAST ELEMENTS, MISCELLANEOUS ITEMS LYING AT NEAR KM. 9.4 (RHS) -TRACHE-II ALOG LUCKNOW BYPASS WHICH HAS BECOME THE DEEMED PROPERTY OF THE SELLER ON THE TERMINATION OF THE CIVIL WORK CONTRACT.

NIT, Bid Document, AnnexureAddendum-I,

26th  February
2015
13 Civil & Electrical works for Implementation of Electronic Toll Collection (ETC) on Surjapur Toll Plaza (km. 451.000 of NH-31) in the State of West Bengal.

NIT, Bid Vol-I, Bid Vol-II, Drawing, Clarification to Queries,

27th  February 2015(On e-Tendering Mode)
14 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT PASCHIM MADATI TOLL PLAZA AT KM 547.350 FOR THE SECTION FROM KM 507.000 TO KM. 551.000 (ISLAMPUR-SONAPUR-GHOSHPUKUR) OF NH-31 IN THE STATE OF WEST BENGAL.

NIT, RFP,

27th  February 2015(On e-Tendering Mode)
15 Hiring of Vehicle on monthly basis for PlU, Palakkad 

Bid Document,

27th  February
2015
16 Consultancy Services for Authority’s Engineer for supervision of project of 4-laning of Ghaghra Bridge to Varanasi section of NH-233 from km 121.800 to km 180.420 [Package-I from Ghaghra Bridge abutment on Basti side to Bhudanpur Urban section] in the State of Uttar Pradesh under NHDP Phase-IV on EPC mode.

Letter to Bidder, RFP, Integrity Pact, Financial Proposal, IEM,

2nd    March
2015(On e-Tend
ering Mode)
17 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING THROUGH ON E-TENDER BASIS ONLY AT TANUKU TOLL PLAZA AT KM 139.483 (NEW KM 964.350) FOR THE SECTION FROM KM 187.6 TO KM 81.6 NEW CHAINAGE FROM KM 914.833 T0 KM 1022.494 (MOMMURU GUNDUGOLANU SECTION) ON NH-5 IN THE STATE OF ANDHRA PRADESH.

NIT, RFP,

2nd    March
2015(On e-Tend
ering Mode)
18 Consultancy Services for Authority Engineer Services for Four laning of Ramban to Banihal Section of NH- 1A (Now NH-44), from km 151.000 to km 187.00 on EPC Mode in the State of Jammu & Kashmir under NHDP Phase-II.

NIT, Letter to Bidders, RFP, IEM, Integrity Pact, Corrigendum-I, Corrigendum-II , Corrigendum-III , Corrigendum-IV , Corrigendum-V , Reply to Pre-bid Queries ,

3rd     March
2015(On e-Tend
ering Mode)
19 Consultancy Services for Authority Engineer Services for 4-laning of Udhampur-Ramban- Section of NH-1A (now NH-44) from km. 67.00 to km. 89.00 and km. 130.00 to km. 151.00 on EPC mode in the State of Jammu & Kashmir under NHDP Phase-II.

NIT, Letter to Bidders, RFP, IEM, Integrity Pact, Corrigendum-I, Corrigendum-II , Corrigendum-III, Corrigendum-IV , Corrigendum-V , Reply to Pre-bid Queries ,

3rd     March
2015(On e-Tend
ering Mode)
20 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT HARSA MANSAR TOLL PLAZA LOCATED AT KM 84.500 FOR JALANDHAR- PATHANKOT SECTION (KM 70.000 TO KM 117.750/4.000) AND PATHANKOT - LAKHANPUR SECTION (KM 4.000 TO KM 16.350) OF NH-1A (NEW NH-44), IN THE STATE OF PUNJAB.

NIT, RFP,

3rd     March
2015(On e-Tend
ering Mode)
21 Six Laning of Handia Varanasi Section of NH-2 from Km 713.146 to Km 785.544 in the State of Uttar Pradesh under NHDP Phase-V on BOT (Toll) mode.

Letter to Bidders, RFP, DCA & Schedules, Executive Summary, E-Tender Process, Amendment-I, Reply to Pre-Bid Queries,

4th  March 2015(On e-Tendering Mode)
22 Independent Engineer services during Operation & Maintenance Period for 4-laning of Pondicherry to Tindivanam Section of NH-66 from Km 0/000 to Km 37/920 in the State of Tamil Nadu 
                                                     and
4-laning of Salem to Ulundurpet section of NH-68 from Km 0/313 to Km 136/670 in the State of Tamil Nadu (Package No.NHDP-III/TN/IE/OM/SU & PT)

RFP, Corrigendum-I,

4th     March
2015(On e-Tend
ering Mode)
23 Special Repair by Providing Periodical Renewal of Punjab/Haryana Border to Jind Section of NH-71 (New NH-52 & 352) from Km. 239.00 (Punjab/Haryana Border) to Km. 307.00 in the State of Haryana.

NIT, Bid Vol-I, Bid Vol-II, E-Tender Process,

4th     March
2015(On e-Tend
ering Mode)
24 UPGRADING THE INFRASTRUCTURE AT TOLL PLAZA GURAU (FORMERLY SEMRA ATIKABAD) LOCATED AT KM. 285.00 OF NH-2 FOR IMPLEMENTATION OF ETC ON PAN INDIA BASIS.

Bid Vol-I, Bid Vol-II, Drawings

4th  March
2015(On e-Tend
ering Mode)
25 UPGRADING THE INFRASTRUCTURE AT TOLL PLAZA TUNDLA LOCATED AT KM. 225.00 OF NH-2 FOR IMPLEMENTATION OF ETC ON PAN INDIA BASIS.

Bid Vol-I, Bid Vol-II, Drawings

4th  March
2015(On e-Tend
ering Mode)
26 Hiring of vehicle on monthly basis for PIU, Thanjavur.

Bid Document,

5th    March
2015
27 Providing, Running & Maintenance of Commercial Vehicles on monthly Hire basis for Project Implementation Unit, GWALIOR (M.P).

Bid DocumentCorrigendum-I, Corrigendum-II

9th  March
2015
28 Providing, running & maintenance of commercial vehicles for PIU, Shimla at Himachal Pradesh.

NIQ, Bid Document, Corrigendum-I,

11th  March
2015
29 Widening & Strengthening of Uncha Nagla-Khanuawa-Roppas -Dholpur Section of NH-123 (length 75.008 Km ) to 2-lane with paved shoulder under NHDP Phase-IV in the state of Rajasthan/Uttar Pradesh on EPC mode.

Letter to bidders, RFP, DCA & Schedules, Schedules, Corrigendum-I, Reply to Pre-bid Queries, Corrigendum-II & III, Corrigendum-IV , Corrigendum-V , Corrigendum-VI , Corrigendum-VII

9th     March 2015(On e-Tendering Mode)
30 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING THROUGH ON E-TENDER BASIS ONLY AT ATHUR TOLL PLAZA AT KM 103.500 FOR THE SECTION FROM KM 74.500 TO KM 121.000 (TAMBARAM TO TINDIVANAM SECTION) ON NH-45 IN THE STATE OF TAMIL NADU

NIT, RFP,

9th     March
2015(On e-Tend
ering Mode)
31 Hiring of Commercial Vehicle SUV or Equivalent (1Nos) on monthly basis for PIU-Ahmedabad.

Bid Document,

9th    March
2015
32 Supply of Commercial Vehicle at NHAI, PIU, Nandyal on monthly rent basis.

Bid Document, Corrigendum-I,

9th  March
2015
33 Providing running and maintenance of vehicles for Project Director NHAI, PIU- Hisar.

Bid Document,

10th    March
2015
34 Providing services for review, examination, measures /methodology, repair/ remedial measures & implementation thereof including implementation/ execution of Short term / Long term measures suggested by an Expert Committee (already constituted by NHAI), structural health monitoring etc. for an old rehabilitated Narmada Bridge constructed in year 1977 across Narmada river at Km. 193.000 -194.400 at Bharuch in between section from Km 192.00 to 198.00 on Vadodara- Surat section of NH-8 in the state of Gujarat.

Bid Vol-I, Bid Vol-II, BOQ, Corrigendum-I

10th  March
2015(On e-Tend
ering Mode)
35 SIX LANING OF BALESHWER – CHANDIKHOLE (KM 62.000 TO KM 199.141) SECTION OF NH 5 IN THE STATE OF ORISSA TO BE EXECUTED ON BOT (TOLL) PROJECT UNDER NHDP PHASE V.

RFP, Pre-Qualified Bidder, E-Tender Process, Amendment No- I,

10th     March
2015(On e-Tend
ering Mode)
36 Rehabilitation And Upgradation to Four Laning of NH-31D from Km 0.00 to Km 83.785 (Package-1) Ghoshpukur –Salsalabari Section in the State of West Bengal on EPC mode.

RFP, Cover Page, EPCSchedules, Addendum-IPackage-I, Plan & Profile, GAD'sPre-bid meeting, Integrity Pact, Corrigendum-I, Corrigendum-II, Corrigendum-III, Corrigendum, Addendum & Reply to Queries, Corrigendum-VAddendum-III, Corrigendum-VI, Addendum-IV,

10th   March
2015(On e-Tend
ering Mode)
37 Rehabilitation and Upgradation to Four laning of NH-31D from Km 83.785 to Km 154.854 (Package-2) Ghoshpukur –Salsalabari Section in the State of West Bengal on EPC mode.

RFP, Cover Page, EPCSchedules, Addendum-I, Package-2 Doc, Plan & Profile, GAD's, Pre-bid meeting, Integrity Pact, Corrigendum-I, Corrigendum-II, Corrigendum-III, Addendum, Corrigendum & Reply to Queries, Corrigendum-V, Addendum-III, Corrigendum-VI, Addendum-IV,

10th   March
2015(On e-Tend
ering Mode)
38 Four Laning of existing Thiruvananthapuram Bypass from Kazhakkoottam (Thiruvananthapuram) to Mukkola Junction from km 0.000 to km 26.500 under NHDP Phase IIIA in the State of Kerala on EPC Mode.

Letter to bidder, RFP, Integrity Pact, DCA & Schedules, Corrigendum-I, Corrigendum-II, Reply to Pre-bid Queries, Corrigendum-III, Schedules, Typical Drawings, P-01 TO P-06, P-07 TO P-10, P-11 TO P-15, P-21 TO P-25, Corrigendum-IV, Reply to Pre-bid Queries-II, Corrigendum-V, Typical Cross section, Revised Schedule, Geo technical Structures, Corrigendum-V,

10th   March
2015(On e-Tend
ering Mode)
39 Engagement of user fee collection agency for Lechchumanapatti toll plaza at km 19.000 on Trichy to Karaikudi section from km 10.000 to km 91.054 (Design kilometer) of NH -210 in the state of Tamil Nadu

NIT, RFP,

10th    March
2015(On e-Tend
ering Mode)
40 Engagement of user fee collection agency for Lembalakudi toll plaza at km 57.317 on Trichy to Karaikudi section from km 10.000 to km 91.054 (Design kilometer) of NH -210 in the state of Tamil Nadu

NIT, RFP,

10th    March
2015(On e-Tend
ering Mode)
41 RFP for 4/6 Laning of Raipur - Bilaspur Section From Km. 0.00 to 127.650 of NH – 30/ NH 130 (Old NH- 200) in the State of Chhattisgarh to be Executed as BOT (Toll) on DBFO Pattern under NHDP Phase – IV.

Letter to Bidder, RFP, E-Tender Process,

10th    March 2015(On e-Tendering Mode)
42 PROPOSAL FOR HIRING OF VEHICLES for PIU, Srinagar.

Bid Document, Annexure,

10th  March
2015
43 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT Chiddan Toll Plaza at Km 480.500 of Amritsar-Wagah Border Section form km 456.100 to km 492.030 on NH-1, in the State of Punjab.

RFP,

11th  March
2015(On e-Tend
ering Mode)
44 Appointment of safety consultant for carrying out safety audit for OMT package of Kanpur- Lucknow Section (Km 11+005 to Km 75+500) Stretch of NH-25 and Lucknow Bypass (Km 0+000 to Km 22.850) Stretch of NH-56A & NH-56B and Lucknow Ayodhya Section (Km 8+000 to Km 137+970) Stretch of NH-28 (Total Length 217.315 Km) in the State of Uttar Pradesh.

NIT, Bid Vol-I, Bid Vol-II, BOQ,

11th  March
2015(On e-Tend
ering Mode)
45 Independent Engineer Services during Operation & Maintenance Period for “4 laning of Lucknow -Raebareli Section of NH-24B from km 12.700 to km 82.700 in the State of Uttar Pradesh on DBFOT (annuity) basis under NHDP Phase-IV A”.

NIT, Bid Vol-I, Bid Vol-II,

11th  March
2015(On e-Tend
ering Mode)
46 Restoration works due to laying of new pipeline (dia 35cm to 80 cm) of KWA (JNNURM) Water supply scheme in NH – 47 Cochin Bypass ( New No. NH-66) between Kundannur Jn (Km 351 +682) and Aroor Junction (Km 358+792).

NIT, Bid Vol-I, Bid Vol-II, Cost Estimates

11th     March
2015(On e-Tend
ering Mode)
47 Selection of placement agency for providing manpower (support staff) to NHAI PIU Office, Jalandhar.

Bid Document,

11th  March
2015
48 Independent Engineer services during Operation & Maintenance Period for 4 laning and Strengthening of existing two lane road for Trichy to Dindigul Section of NH-45 from Km 333/300 to Km 421/273 in the State of Tamil Nadu under NHDP Phase-III on BOT basis & Four laning project of Thanjavur – Trichy Section of NH-67 from Km 80/000 to Km 136/490.

Bid Document, Corrigendum-I,

11th     March
2015(On e-Tend
ering Mode)
49 Four laning of Patna to Koilwar from Km 181.300 of NH-30 to Km 137.375 of NH-30 (Design Chainage Km 0.000 to Km 33.250) in the State of Bihar under NHDP Phase-III on (EPC) Mode. 

Bid Vol-I, Bid Vol-II, Bid Vol-III,

11th   March
2015(On e-Tend
ering Mode)
50 RFP for Four laning of Koilwar to Bhojpur from Km 137.375 of NH-30 to Km 27.370 of NH-84 (Design Chainage Km 33.250 to Km 77.100) in the State of Bihar under NHDP Phase-III on (EPC) Mode.

Bid Vol-I, Bid Vol-II, Bid Vol-III,

11th   March
2015(On e-Tend
ering Mode)
51 RFP for Four laning of Bhojpur to Buxar from Km 27.370 to Km 75.00 of NH - 84 (Design Chainage Km 77.100 to Km 125.00) in the State of Bihar under NHDP Phase-III on (EPC) Mode.

Bid Vol-I, Bid Vol-II, Bid Vol-III,

11th   March
2015(On e-Tend
ering Mode)
52 Rehabilitation and Upgradation to Four Laning of Bahargora to Singhara Section (Km 199.200 to Km 310.806) of NH-6 (Length = 111.606 Kms) in the state of Odisha under NHDP Phase IV on EPC mode.

RFP, E-tender Process, Amendment-I, Annexure,Reply of queries, Amendment-II, Amendment-III, Amendment-IV, Amendment-V, Amendment-VI,

12th March
2015(On e-Tend
ering Mode)
53 RFP for provision of dedicated telecom/ data connectivity on NHAI’s Toll Plazas 4th call of bids.

NIT, RFP,

12th  March
2015
54 Periodical renewal , Ordinary patch repair work and to complete the balance work of minor bridge and approach road at chainage 44+090 (existing chainage 43.875) of Bhopal-Sanchi section of NH-86(Ext) under PIU Bhopal in the State of Madhya Pradesh.

Bid Vol-I, Bid Vol-II,

12th     March
2015(On e-Tend
ering Mode)
55 Supply of Commercial Vehicle at NHAI, PIU, Dhanbad on monthly rent basis. (2nd call)

Bid Document,

12th  March
2015
56 Four LANING GHAGHRA BRIDGE TO VARANASI SECTION OF NH-233 FROM KM. 180.420 TO KM. 240.340 [PACKAGE-II FROM BHUDANPUR URBAN SECTION TO START OF GOSSAI BAZAR BYPASS] IN THE STATE OF UTTAR PRADESH UNDER NHDP PHASE-IV ON EPC MODE.

Letter to Bidders, RFP, Draft EPC, Schedules, Amendment-ILetter Amendment-I&IIAmendment-IV, Amendment-V, Letter to Bidder-II, Amendment-10, Amendment-11,

13th     March
2015(On e-Tend
ering Mode)
57 Independent Engineer services For Operation and Maintenance of Four laned Jalandhar–Punjab/J & K Border (Km 4.230 to Km 117.750/4.000 and Km 4.000 to Km 16.350) of NH–1A, on OMT basis In the state of Punjab, Package OMT-21A.

RFP,

13th     March
2015(On e-Tend
ering Mode)
58 IMPROVEMENT/AUGMENTATION OF CHHAPRA-REWAGHAT-MUZAFFARPUR SECTION OF NH-102 TO 2-LANE WITH PAVED SHOULDERS FROM KM 1.300 (EXISTING CHAINAGE KM 1.300) TO KM 73.080 (EXISTING CHAINAGE KM 74.200) (TOTAL DESIGN LENGTH = 73.080 KM) IN THE STATE OF BIHAR ON EPC MODE.

RFP, Revised Draft EPC

13th   March
2015(On e-Tend
ering Mode)
59 IMPROVEMENT/ AUGMENTATION OF ALIGARH MORADABAD SECTION OF NH-93 TO 2 LANE WITH PAVED SHOULDERS FROM KM 85.650 (EXISTING CHAINAGE KM 85.650) TO KM 232.020 (EXISTING CHAINAGE KM 232.000) IN THE STATE OF UTTAR PRADESH UNDER NHDP PHASE-IV ON ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) MODE.

RFP Documents, Amendment-I, Amendment-II, Amendment-III, Extension of Bid Due Date , Extension of Bid Due Date-II , Extension of Bid Due Date-III , Amendment-11, Amendment-12,

13th   March 2015(On e-Tendering Mode)
60 Four Laning Ghaghra bridge to Varanasi section of NH 233 from KM 240.340 to KM 299.350 (Package –III from start of Gossai Bazaar Bypass to Varanasi ) in the State of Uttar Pradesh Under NHDP Phase-IV. ON EPC MODE.

Letter to Bidders, RFP, Draft EPC, Schedules, Amendment-I, Amendment-II, Amendment-III, Amendment-IV, Amendment-VI, Reply to pre-bid queries, Amendment-14,

16th      March
2015(On e-Tend
ering Mode)
61 Short Term Improvements & Routine Maintenance Work of Ratanpur – Himatnagar - Ahmedabad (km.388.180 to Km.515.000) section of NH-8 in the state of Gujarat.

Bid Vol-I, Bid Vol-II, BOQ, E-Tender Process,

16th     March
2015(On e-Tend
ering Mode)
62 Cousultancy Services for Authority Engineer's for the project, Supervision of Four laning of Jabalpur –Lakhnadon section of NH-7 from Km 465.500 to Km 546.425 (Design length - 80.82 Km) in the State of Madhya Pradesh under NHDP pahse -IV on EPC mode.

NIT,

16th     March
2015(On e-Tend
ering Mode)
63 Operation and Maintenance of Punjab/ J&K border to Jammu (Km. 16.350 to Km. 97.200) including Jammu bypass (Km. 0.000 to Km. 15.000/15.200) and tolling for BOT (Annuity) project [Jammu bypass (Km. 15.000/15.200 to Km. 20.305) and Jammu-Udhampur section (Km. 9.370 to km. 52.457) including Udhampur Bypass (Km. 0.000 to Km. 16.387)] section of NH- 1A on OMT Basis.(OMT Package 21B).

RFP,DCA, Schedule

16th   March
2015(On e-Tend
ering Mode)
64 Four laning of Jabalpur – Lakhnadon section of NH-7 from km 465.500 to km 546.425 in the State of Madhya Pradesh under NHDP Phase-IV on EPC Mode.

NIT, E-Tender Process, Corrigendum-I, Addendum-II, Corrigendum-II, Corrigendum-III, Corrigendum-IV , Reply to Pre- bid queries, Corrigendum-V , Corrigendum-VI , Corrigendum-VII , Corrigendum-VIII , Corrigendum-IX ,

17th    March
2015(On e-Tend
ering Mode)
65 TWO LANING WITH PAVED SHOULDER OF CHHAPRA – GOPALGANJ SECTION OF NH-85 FROM KM 0.00 TO KM 93.500 (EXISTING CHAINAGE) and KM 0.00 to KM 94.258 (DESIGN CHAINAGE) [TOTAL DESIGN LENGTH – 94.258 KM] IN THE STATE OF BIHAR on EPC Mode.

Bid Document, Addendum-I, Addendum-II, Addendum-III, Addendum-IV, Addendum-V,

17th   March
2015(On e-Tend
ering Mode)
66 FOUR LANING OF SULTANPUR-VARANASI SECTION OF NH-56 FROM KM 205.000 (DESIGN CHAINAGE KM 209.230) TO KM 263.000 (DESIGN CHAINAGE 272.590) [PACKAGE-II] IN THE STATE OF UTTAR PRADESH UNDER NHDP PHASE-IV ON EPC MODE.

NIT, RFP, EPC Agreement, Schedules, Integrity Pact, Amendment-I, Amendment-II, Amendment-III, Amendment-IV

17th    March
2015(On e-Tend
ering Mode)
67 Selection of placement agency for providing manpower to NHAI PIU Office, Hisar 

Bid Document,

17th  March
2015
68 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF PROJECT OF CONSTRUCTION OF FOUR LANING OF HISAR TO DABWALI SECTION OF NH-10 FROM KM 170.000 TO KM 227.000 WITH PAVED SHOULDER IN THE STATE OF HARYANA ON ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) BASIS (PACKAGE-1)

Bid Document,

17th     March
2015(On e-Tend
ering Mode)
69 RFQ for PPP in Development of Delhi Meerut Expressway (from Km. 0.000 to 27.500) including 6/8 laning of NH-24 from Km. 0.000 to Km. 49.923 (Hapur Bypass) in the States of Delhi and Uttar Pradesh on BOT (Toll) (design length 49.923 Kms.)

RFQ, E-Tender Process, Integrity Pact,

17th     March
2015(On e-Tend
ering Mode)
70 F our Laning of Yadgiri-Warangal Section of NH-163( new Nh no. 202) from Km 54.000 to Km 150.000 (Design Length 99.005 Km) under NHDP Phase IV to be executed on EPC mode in the state of Telangana.

Corrigendum-13,

17th  March
2015(On e-Tend
ering Mode)
71 PROVIDING, RUNNING, & MAINTENANCE OF COMMERCIAL VEHICLES ON MONTHLY HIRE BASIS FOR NHAI, PIU Bhilwara

Bid Document,

17th  March
2015
72 Engagement of Security/Placement Agency for supply of employees on short term contract basis in the PIU – office at Bhilwara.

Bid Document, BOQ,

17th  March
2015
73 Four Laning of Rewa-Katni-Jabalpur of NH – 7 (from km 242.600 to km 311.000) inthe state of Madhya Pradesh on Engineering, Procurement and Construction (EPC) mode (Package – I)

NIT, E-Tender Process, Corrigendum-I, Corrigendum-II, Corrigendum-III, Reply to Pre-bid queries, Corrigendum-IV, Corrigendum-V, Corrigendum-VICorrigendum-VII

17th    March
2015(On e-Tend
ering Mode)
74 Four Laning of Rewa-Katni-Jabalpur (excluding Katni Bypass) of NH – 7 (from km 311+000 to km 359+500 and from km 378+500 to km 397+000) in the state of Madhya Pradesh on Engineering, Procurement and Construction (EPC) mode (Package – II)

NIT, E-Tender Process, Amendment-I, Corrigendum-I, Reply to Pre-bid Queries, Corrigendum-II, Revised Corrigendum-II, Corrigendum-III, Corrigendum-IV, Corrigendum-V, Corrigendum-VI,

18th     March
2015(On e-Tend
ering Mode)
75 Four laning of Rewa – Katni-Jabalpur section of NH-7 from km 397.00 to Km 465.500 in the State of Madhya Pradesh under NHDP Phase IV on EPC mode (Package – IV).

NIT, E-Tender Process, Corrigendum-I, Corrigendum-II, Corrigendum-III, Reply to Pre-bid Queries, Corrigendum-IV, Corrigendum-V, Corrigendum-VI, Corrigendum-VII,

18th     March
2015(On e-Tend
ering Mode)
76 Rehabilitation and Augmentation of 4- Laning of Kharar-Kurali section of NH-21 from km 15.765 to km 29.900 (design chainages) (New NH-205) in the State of Punjab on EPC Mode.

NIT, RFP, E-Tender Process, Integrity Pact, Letter to Bidders, Draft EPC, Plan & Profile, Schedules, Corrigendum-I, Appendix, Corrigendum-II, Corrigendum-III, Corrigendum-IV, Corrigendum-V, Corrigendum-VI, Corrigendum-VII, Corrigendum-VIII,

18th     March
2015(On e-Tend
ering Mode)
77 8 -Laning of Section of NH – 1 (New NH-44) from Mukarba Chowk at KM 15.500 to Panipat at KM 86.000 on BOT (TOLL) basis in the State of Haryana.

Pre-qualified Bidders, E-Tender Process, Addendum-I, Reply to Queries, Addendum-II, Corrigendum-I, Corrigendum-II, Addendum-III, Addendum & Reply to pre-bid queries-II, Addendum-VAddendum-VI

18th     March
2015(On e-Tend
ering Mode)
78 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF FOUR LANING OF HISAR TO DABWALI SECTION OF NH-10 FROM KM 227.000 TO KM 314.660 WITH PAVED SHOULDER IN THE STATE OF HARYANA ON ENGINEERING PROCUREMENT AND CONSTRUCTION (EPC) BASIS (PACKAGE-2).

Bid Document,

19th     March
2015(On e-Tend
ering Mode)
79 Construction of Balance work of 4 – lane Dalkhola Bypass (Length 5.5 Km.) including ROB on NH-34 on EPC mode in the state of West Bengal.

RFP, EPC Document, Plan Profile & GAD of ROB, Corrigendum-I,

19th  March 2015(On e-Tendering Mode)
80 Construction of 4 - lane Islampur Bypass from Km. 0.0 (Existing Chainage Km. 498.500) to Km 10.31 (Existing Chainage Km. 506.950) on NH-31 on EPC mode in the state of West Bengal.

RFP, EPC Document, Plan & Profile, GAD, Corrigendum-I,

20th  March 2015(On e-Tendering Mode)
81 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF FOUR LANING OF FOUR-LANING OF AMBALA - KAITHAL SECTION FROM KM 0.000 (AMBALA) TO KM 50.860 (PEHOWA) WITH PAVED SHOULDER IN THE STATE OF HARYANA OF NH-65 UNDER NHDP PHASE-III ON EPC MODE (PACKAGE-1).

Bid Document,

20th     March
2015(On e-Tend
ering Mode)
82 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF FOUR LANING OF FOUR-LANING OF AMBALA - KAITHAL SECTION FROM KM 50.860 (PEHOWA) TO KM 95.360 (KAITHAL) WITH PAVED SHOULDER IN THE STATE OF HARYANA OF NH-65 UNDER NHDP PHASE-III ON EPC MODE (PACKAGE-2).

Bid Document,

20th     March
2015(On e-Tend
ering Mode)
83 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT Khemana Toll Plaza located at km 339.000 for the section from km 340.000 to km 295.000 of (Palanpur / Khemana – Aburoad) of NH-14 in the State of Gujarat.

NIT, RFP

20th  March
2015(On e-Tend
ering Mode)
84 Four laning of Sultanpur to Varanasi section of NH-56 from km 134.700 (design chainage km 134.700) to km 205.000 (design chainage km 209.230) [Package-I] in the State of Uttar Pradesh under NHDP Phase-IV on EPC mode.

Letter to Bidders, RFP, EPC Agreement, Integrity Pact, Schedules, Amendment-I, Amendment-II, Amendment-III, Amendment -IV & V

23rd   March
2015(On e-Tend
ering Mode)
85 RFP for Appointment of Technical Consultant: Construction of flyover from Liberty Cinema to Mental Hospital (km 0/400 to 2/600) on Nagpur Obedullaganj Road NH-69 Hyderabad Road NH-44.

Bid Vol-I, Bid Vol-II,

23rd    March
2015(On e-Tend
ering Mode)
86 Consultancy Services for Authority’s Engineer for supervision of projects of (i) 4-laning of Ghaghra Bridge to Varanasi section of NH-233 from km 180.420 to km 240.340 [Package-II from Bhudanpur Urban section to start of Gossai Bazar bypass] in the State of Uttar Pradesh under NHDP Phase-IV on EPC mode and (ii) 4-laning of Ghaghra Bridge to Varanasi section of NH-233 from km 240.340 to km 299.350 [Package-III from start of Gossai Bazar bypass to Varanasi] in the State of Uttar Pradesh under NHDP Phase-IV on EPC mode.

Letter to Bidders, RFPFinancial Bid, Integrity Pact, IEM,

23rd  March
2015(On e-Tend
ering Mode)
87 Consultancy Services for Authority Engineer's for the project, Supervision of Four laning of Rewa - Katni - Jabalpur section of NH-7 from Km 242.600 to Km 311.000 (Design length - 69.19 Km) in the State of Madhya Pradesh under NHDP pahse -IV on EPC mode.

NIT,

24th  March
2015(On e-Tend
ering Mode)
88 Periodic Renewal Work in length of 49.700 Km in Shivpuri-Guna Section from Km 236.000 to Km 319.700 of NH-3 in the state of Madhya Pradesh (Pkg-MP/NH -3/01).

Bid Vol-I, Bid Vol-II,

24th  March
2015(On e-Tend
ering Mode)
89 Periodic Renewal Work in length of 69.900 Km in Guna-Biaora Section from Km 332.100 to Km 427.000 of NH-3 in the state of Madhya Pradesh (Pkg-MP/NH-3/ 02).

Bid Vol-I, Bid Vol-II,

24th  March
2015(On e-Tend
ering Mode)
90 Periodic Renewal Work in length of 88.450 Km in Biaora-Dewas Section from Km 427.000 to Km 566.450 of NH-3 in the state of Madhya Pradesh (Pkg-MP/NH -3/03).

Bid Vol-I, Bid Vol-II,

24th  March
2015(On e-Tend
ering Mode)
91 RFP for Appointment of Technical Consultant: (i) Construction of Flyover at Wadi / MIDC Junction at km 8/600-9/650 of Nagpur Amravati Road NH-6 (ii) Rehabilitation and improvement of existing 4 lane section with Junction improvement, footpath over RCC drain with PQC on Urban link of NH-6 Nagpur Raipur Road NH-6 in km 544/200-545-030(0.830m) Pardinaka and km 547/650 to 550/00 92.35km) Railway crossing to Sabhas Chowk.

Bid Vol-I, Bid Vol-II,

24th    March
2015(On e-Tend
ering Mode)
92 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Improvement /Augmentation of Four Laning of Km 5.000 to Km. 79.340 (Existing Chainage) [Design Chainage Km 5.000 to Km 81.000] and Two Laning with Paved Shoulders from km 79.340 to Km 118.795 (Existing Chainage) [Design Chainage Km 81.000 to Km 120.000] of Madurai- Ramanathapuram Section of NH-49 [Total Design Length 115.000 Km] in the State of Tamil Nadu on EPC mode under NHDP-III.

NIT, RFP, BOQ, E-Tender Process

24th     March
2015(On e-Tend
ering Mode)
93 Four laning of Rewa – Katni - Jabalpur section of NH-7 from km 311.000 to km 359.500 and from km 378.500 to km 397.000 (Pkg –II, Design length – 69.072 Km) in the State of Madhya Pradesh under NHDP Phase-IV on EPC Mode.

NIT,

24th  March
2015(On e-Tend
ering Mode)
94 Special Repairs Work from Bhubaneswar to Sunakhala from km 435.444 to Km. 513.570 of NH-16 (Old NH-5 from km 285.338 to km 363.464) in the state of Odisha.

NIT,

26th  March
2015(On e-Tend
ering Mode)
95 Independent Engineer Services for Operation and Maintenance of Chittorgarh -Kota section from Km. 199.929 to Km. 360.429 of NH-76 (New NH-27 km 891.929 to km 1052.429) on OMT basis in the State of Rajasthan (OMT Pkg-3)

RFP, Integrity Pact, Appendix,

27th March
2015(On e-Tend
ering Mode)
96 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT Kharik Toll Plaza at Km. 333.150 (for length of 69.961 Km) Khagaria – Purnea section from Km 270.000 to Km 410.000 of NH-31 in the State of Bihar.

NIT, RFP,

27th March
2015(On e-Tend
ering Mode)
97 FOUR LANING OF AUNTA - SIMARIA (GANGA BRIDGE WITH APPROACH ROAD) SECTION OF NH 31 FROM KM 197.900 TO 206.050(DESIGN CHAINAGE) AND (EXISTING CHAINAGE KM 204.741 TO KM 209.945 OF NH-31) [TOTAL DESIGN LENGTH – 8.150 KM] IN THE STATE OF BIHAR ON EPC MODE.

Bid Document, Addendum-I, Addendum-II,

27th March
2015(On e-Tend
ering Mode)
98 Four laning of Bakhtiyarpur – Mokama section of NH 31 from KM 153.300 to 197.900 (Design Chainage) and (Existing Chainage km 153.300 to 204.741 of NH-31) [Total Design Length – 44+600 km] in the State of Bihar on EPC Mode.

Bid Document, Addendum-I, Addendum-II,

27th March
2015(On e-Tend
ering Mode)
99 FOUR LANING OF SIMARIA- KHAGARIA SECTION OF NH 31 FROM KM 206.050 TO 266.282.0 (DESIGN CHAINAGE) AND (EXISTING CHAINAGE KM 209.945 TO KM 270.000 OF NH-31) [TOTAL DESIGN LENGTH – 60.232 KM] IN THE STATE OF BIHAR on EPC Mode.

Bid Document, Addendum-I, Addendum-II,

27th March
2015(On e-Tend
ering Mode)
100 RFP for  Operation And Maintenance of Tirunelveli-Tuticorin Section of NH-7A (New NH-138) from Km 0.00 to Km 47.250 (Total Length 47.250 Km) in the State of Tamil Nadu on OMT Basis (Pkg:OMT-34).

Bid Vol-I, Bid Vol-II, Bid Vol-III, E-tender Process,

27th  March
2015(On e-Tend
ering Mode)
101 RFP for OPERATION AND MAINTENANCE OF KOLAGHAT-HALDIA (KM 0.000 TO KM 52.700, 52.700 KM LENGTH) OF NH-41 IN THE STATE OF WEST BENGAL ON OMT BASIS (PACKAGE: OMT-17)

Bid Vol-I, Bid Vol-II, Bid Vol-III, Appendix, Cover Letter, E-Tender Process

27th  March
2015(On e-Tend
ering Mode)
102 RFP for Four laning of Hospet – Chitradurga of NH-13 (new NH-50) from Km 299.00 to Km 418.750 in the state of Karnataka under National highways development project (NHDP) Phase III on DBFOT (Toll) Basis.

Letter to Bidders, RFP, E-Tender Process,

30th     March
2015(On e-Tend
ering Mode)
103 Four laning of Rewa – Katni - Jabalpur section of NH-7 from km 397.000 to km 465.500 (Pkg –IV, Design length – 68.26 Km) in the State of Madhya Pradesh under NHDP Phase-IV on EPC Mode.

NIT, Revised NIT,

30th  March
2015(On e-Tend
ering Mode)
104 Six Laning of Chakeri Allahabad section of NH-2 (from Km 483.687 to Km 628.753) in the state of Uttar Pradesh under NHDP Phase V on BOT (Toll) Basis on DBFOT Pattern. (Design Length 145.066 Km).

Letter to Bidder, Bid Vol-I, Bid Vol-II, Schedules, E-Tender Process, Amendment-I,

6th    April 2015(On e-Tendering Mode)
105 4-Laning Of UP/Haryana border-Yamunanagar-Saha-Barwala-Panchkula Section of NH-73 from km 70.830 to km 115.400 in the State of Haryana ON EPC MODE.

Bid Document, Corrigendum-I, Addendum-I,

7th  April
2015(On e-Tend
ering Mode)
106 4-Laning of UP/Haryana border-Yamunanagar-Saha-Barwala -Panchkula Section of NH-73 from km 115.400 to km 157.192 in the State of Haryana ON EPC MODE.

Bid Document, Corrigendum-I, Addendum-I,

7th  April
2015(On e-Tend
ering Mode)
107 4-LANING OF VARANASI GORAKHPUR SECTION OF NH-29 FROM KM 88.000 (DESIGN CHAINAGE 84.160) TO KM 148.000 (DESIGN CHAINAGE 149.540) [PACKAGE-III BIRNON VILLAGE TO AMILLA VILLAGE] IN THE STATE OF UTTAR PRADESH UNDER NHDP PHASE-IV.

Letter to Bidders, RFP, Draft EPC Agreement, Schedule, Amendment-I, Amendment-II, Amendment-III, Amendment-IV, Amendment-V,

9th   April
2015(On e-Tend
ering Mode)
108 Four laning of Varanasi Gorakhpur section of NH-29 from km 148.000 (Design chainage 149.540) to km 208.300 (Design chainage 215.160) [Package-IV Amilla Village to Gorakhpur] in the State of Uttar Pradesh under NHDP Phase-IV on EPC mode.

Letter to Bidders, RFP, DCA, Schedule, Integrity Pact, Letter Plan & Profile, Amendment, Amendment-III, Amendment-IV, Amendment-V,

10th     April
2015(On e-Tend
ering Mode)
109 4-LANING OF VARANASI GORAKHPUR SECTION OF NH-29 FROM KM 12.000 TO KM 88.000 [PACKAGE-II FROM SANDAH TO BIRNON] IN THE STATE OF UTTAR PRADESH UNDER NHDP PHASE-IV on EPC mode.

Letter to Bidders, RFP, Draft EPC, Annexure & Main Report, Amendment-I & II , Amendment-III, Amendment-IV, Amendment-V, Amendment-VI & VII, Amendment-VIII,

13th  April
2015(On e-Tend
ering Mode)
110 Development of Six-Lane Eastern Peripheral Expressway (NH No. NE – II) in the states of Haryana and Uttar Pradesh on EPC mode – Package-I from km 1.000 to km 22.000 on EPC Mode.

Bid Document, Letter to Bidders,

15th  April
2015(On e-Tend
ering Mode)
111 Development of Six-Lane Eastern Peripheral Expressway (NH No. NE – II) in the state of Uttar Pradesh on EPC mode – Package-II from km 22.000 to km 46.500 on EPC Mode.

Bid Document, Letter to Bidders,

15th  April
2015(On e-Tend
ering Mode)
112 Development of Six-Lane Eastern Peripheral Expressway (NH No. NE – II) in the states of Haryana and Uttar Pradesh on EPC mode – Package-III from km 46.500 to km 71.000 on EPC Mode.

Bid Document, Letter to Bidders,

15th  April
2015(On e-Tend
ering Mode)
113 Development of Six-Lane Eastern Peripheral Expressway (NH No. NE – II) in the states of Haryana and Uttar Pradesh on EPC mode – Package-IV from km 71.000 to km 93.000 on EPC Mode.

Bid Document, Letter to Bidders,

15th  April
2015(On e-Tend
ering Mode)
114 Development of Six-Lane Eastern Peripheral Expressway (NH No. NE-II) in the States of Haryana And Uttar Pradesh from Km 93.000 to Km 114.000” Package-V on EPC Mode.

Bid Document, Letter to Bidders,

15th  April
2015(On e-Tend
ering Mode)
115 Development of Six-Lane Eastern Peripheral Expressway (NH No. NE-II) in the States of Haryana And Uttar Pradesh Package-VI from Km114.000 to Km 136.000 on EPC Mode.

Bid Document, Letter to Bidders,

15th  April
2015(On e-Tend
ering Mode)
116 Construction of Karalphata Interchange (From Km 3.600 to Km 6.000 of NH-4B & From Km 5.300 to Km 6.400 of SH-54 (NH-348A)) and connectivity to proposed 4th Terminal of JNPT Phase-II, (Package-I) on EPC mode.

RFP, E-Tendering Procedure, Corrigendum-I, Corrigendum-II, Corrigendum-III,

17th  April
2015(On e-Tend
ering Mode)
117 Construction of Gavanphata Interchange (From Km 14.800 to Km 15.800 of NH-4B, From Km 13.200 to Km 14.850 of SH-54 & from Km 5.400 to Km 6.200 of Amra Marg (NH-348A)) and NH-4B (From Km 6.000 to Km 14.800 and from Km 15.800 to Km 21.200)of JNPT Phase-II (Package –II) on EPC basis

RFP, E-Tendering Procedure, Corrigendum-I, Corrigendum-II, Corrigendum-III,

17th  April
2015(On e-Tend
ering Mode)
118 Construction of SH-54 (NH-348A) from Km 6.400 to Km 13.200 and NH-348A(Amra Marg) from Km 0.000 to Km 5.400 of JNPT Phase II (Package III) onEngineering, Procurement & Construction (EPC) Mode

RFP, E-Tendering Procedure, Corrigendum-I, Corrigendum-II, Corrigendum-III,

17th  April
2015(On e-Tend
ering Mode)
119 Construction of NH 4B from Km 21.200 to Km 27.270 (D to E Section) and from Km 0.000 to Km 4.492 (D to G Section) of JNPT Phase II (Package IV) on EPC Basis

RFP, E-Tendering Procedure, Corrigendum-I, Corrigendum-II, Corrigendum-III,

17th  April
2015(On e-Tend
ering Mode)
Request For Annual Qualification for Public Private Partnership in National Highways Projects for the year 2014.
NIT , RFAQCorrigendum No 1Reply to Queries of RFAQ-2014
Request For Annual Qualification for Public Private Partnership in National Highways Projects.
NIT , RFAQ, Letter, Modified RFAQ, Amendment No. 1, Modified RFAQ-31.03.2011 ,Reply to Queries, Amendment No. 2,Extension of due datePreliminary Evaluation of RFAQAmendment , Amendment to Clarification

User Fee (Toll) Collection at Toll Plazas of NHAI -Pre-Qualification of Contractors.

RFQ dated 10.09.2014 of NHAI Addendum to RFQ dated 10.09.2014,

Reply to query of bidders dated: 25 09 2014:  

Details of Toll Plazas of NHAI, dated 14.01.2015 ,

List of Applicants pre-qualified (Category-1): Page-1, Page-2, Page-3, Page-4, Page-5, Page-6, Page-7, Page-8, Page-9, Page-10, Page-11, Page-12, Page-13, Page-14, Page-15, Page-16, Page-17, Page-18, Page-19, Page-20, Page-21, Page-22, Page-23,

List of Applicants pre-qualified (Category-2): Page-1Page-2, Page-3, Page-4, Page-5, Page-6, Page-7, Page-8, Page-9, Page-10, Page-11, Page-12, Page-13, Page-14, Page-15, Page-16, Page-17, Page-18, Page-19, Page-20, Page-21, Page-22, Page-23, Page-24Page-25Page-26

List of Applications Received dated: 26.11.2014 , 4.12.2014, 8.12.2014, 15.12.2014, 22.12.2014, 26.12.2014, 6.01.2015 , 7.01.2015, 9.01.2015, 14.01.2015, 16.01.2015, 20.01.2015, 21.01.2015, 22.01.2015, 02.02.2015, 04.02.2015 , 05.02.2015 , 10.02.2015 ,  18.02.2015 , 24.02.2015 ,

 RFQ dated 21.10.2013 of NHAI , Corrigendum - I  to RFQ dated 21.10.2013 , Corrigendum - II   dated 16.01.2014 ,Corrigendum -III  dated 13.03.2014,  Details of Toll Plazas of NHAI , Details of Toll Plazas of NHAI dated 08.07.2014 , List of Applications received, List of Applicants pre-qualified (Category-1), Page-2(Category-1) ,  Page-3(Category-1) ,Page-4(Category-1) ,Page-5(Category-1) ,Page-6(Category-1),Page-7(Category-1) , Page-8(Category-1) , Page-9(Category-1) , Page-10(Category-1) ,Page-11(Category-1) , Page-14(Category-1) , Page-15(Category-1) , Page-16(Category-1) , Page-17(Category-1) , Page-18(Category-1) , Page-19(Category-1) ,  List of Applicants pre-qualified (Category-2) , Page-2(Category-2) ,Page-3(Category-2) ,Page-4(Category-2) ,Page-5(Category-2) , Page-6(Category-2) , Page-7(Category-2),Page-8(Category-2), Page-9(Category-2), Page-10(Category-2), Page-11(Category-2), Page-12(Category-2),Page-13(Category-2), Page-14(Category-2) ,Page-15(Category-2) , Page-16(Category-2), Page-17(Category-2) , Page-18(Category-2) ,Page-19(Category-2),  Page-20(Category-2), Page-21(Category-2), Page-22(Category-2), Page-23(Category-2), Page-24(Category-2),  Page-25(Category-2),  Page-26(Category-2),  Page-27(Category-2), Reply to query of bidders dated 06.11.2013 , Reply to query of bidders dated 20.11.2013 , Reply to query of bidders dated 12.12.2013 , Reply to query of bidders dated 28.01.2014 , List of Application Received Dated 27.11.2013 , List of Application Received Dated 29.11.2013 , List of Application Received Dated 03.12.2013  , List of Application Received Dated 05.12.2013  , List of Application Received Dated 11.12.2013  , List of Application Received Dated 19.12.2013 , List of Application Received Dated 06.01.2014  , List of Application Received Dated 31.01.2014 , List of Application Received Dated 12.02.2013 , List of Application Received Dated 20.02.2013 , List of Application Received Dated 26.02.2013 ,List of Application Received Dated 24.04.2014 ,List of Application Received Dated 15.05.2014,List of Applications received Dated 27.05.2014 ,List of Applications received Dated 24.06.2014 ,List of Applications received Dated 14.07.2014 ,List of Applications received Dated 22.07.2014 ,List of Applications received dated 28.07.14 , List of Applications received Dated 05.08.2014 , List of Applications received Dated 13.08.2014 , List of Applications received Dated 27.08.2014 , List of Applications received Dated 1.09.2014 , List of Applications received Dated 10.09.2014 , List of Applications received Dated 17.09.2014 , List of Applications received Dated 23.09.2014 , List of Applications received Dated 29.10.2014 , List of Applications received Dated 12.11.2014, List of Applications received Dated 26.11.2014 , List of Applications received Dated 04.12.2014 ,

Invitation of RFP/Financial Bids for Toll Collection at Toll Plazas of NHAI

 Invitation of RFP/Financial Bids for Toll Collection , Invitation of RFP/Financial Bids for Toll Collection-II , Invitation of RFP/Financial Bids for Toll Collection-III , Invitation of RFP/Financial Bids for Toll Collection-IV  , Invitation of RFP/Financial Bids for Toll Collection-V, Request For Proposal (RFP) ,Corrigendum-I , Revised-Invitation of RFP/Financial Bids for Toll Collection, Corrigendum-II , Corrigendum-III dated 09 07 2014  ,  Record of Financial Bids on due date 11 12 2013 , Record of Financial Bids on due date 12 12 2013 ,Record of Financial Bids on due date 13 12 2013 , Record of Financial Bids on due date 16 12 2013 ,Record of Financial Bids on due date 17 12 2013 ,Record of Financial Bids on due date 31 12 2013 ,Record of Financial Bids on due date 3 01 2014 ,Record of Financial Bids on due date 8 01 2014 , Record of Financial Bids on due date 10 01 2014 ,Record of Financial Bids on due date 15 01 2014 ,Record of Financial Bids on due date 16 01 2014 ,(i) Record of Financial Bids on due date 17 01 2014 , (ii) Record of Financial Bids on due date 17 01 2014 ,Record of Financial Bids on due date 20 01 2014 , Record of Financial Bids on due date 24 01 2014 , Record of Financial Bids on due date 30 01 2014 , Record of Financial Bids on due date 31 01 2014 , Record of Financial Bids on due date 04.02.2014 , Record of Financial Bids on due date 06.02.2014 , Record of Financial Bids on due date 07.02.2014 , Record of Financial Bids on due date 11.02.2014 , Record of Financial Bids on due date 12.02.2014 , (i) Record of Financial Bids on due date 13.02.2014 , (ii) Record of Financial Bids on due date 13.02.2014 , Record of Financial Bids on due date 14.02.2014Record of Financial Bids on due date 17.02.2014 , Record of Financial Bids on due date 18.02.2014  , Record of Financial Bids on due date 21.02.2014  , Record of Financial Bids on due date 26.02.2014 , Record of Financial Bids on due date 28.02.2014 , (i) Record of Financial Bids on due date 03.03.2014 , (ii) Record of Financial Bids on due date 03.03.2014 Record of Financial Bids on due date 05.03.2014 , Record of Financial Bids on due date 06.03.2014(i) Record of Financial Bids on due date 07.03.2014 , (ii) Record of Financial Bids on due date 07.03.2014 , (i) Record of Financial Bids on due date 10.03.2014(ii) Record of Financial Bids on due date 10.03.2014Record of Financial Bids on due date 11.03.2014 , Record of Financial Bids on due date 12.03.2014Record of Financial Bids on due date 14.03.2014 , Record of Financial Bids on due date 18.03.2014 , Record of Financial Bids on due date 19.03.2014 , Record of Financial Bids on due date 21.03.2014 , Record of Financial Bids on due date 27.03.2014 , Record of Financial Bids on due date 02.04.2014 , Record of Financial Bids on due date 04.04.2014 , Record of Financial Bids on due date 07.04.2014 , (i) Record of Financial Bids on due date 09.04.2014 , (II) Record of Financial Bids on due date 09.04.2014 , (i) Record of Financial Bids on due date 11.04.2014 , (ii) Record of Financial Bids on due date 11.04.2014 , Record of Financial Bids on due date 15.04.2014 , Record of Financial Bids on due date 16.04.2014 , Record of Financial Bids on due date 17.04.2014 , (i) Record of Financial Bids on due date 23.04.2014 , (ii) Record of Financial Bids on due date 23.04.2014 , Record of Financial Bids on due date 25.04.2014 , Record of Financial Bids on due date 30.04.2014 , Record of Financial Bids on due date 01.05.2014Record of Financial Bids on due date 02.05.2014Record of Financial Bids on due date 19.05.2014 , (i) Record of Financial Bids on due date 22.05.2014 , (ii) Record of Financial Bids on due date 22.05.2014 , (I) Record of Financial Bids on due date 23.05.2014 , (ii) Record of Financial Bids on due date 23.05.2014 , (i) Record of Financial Bids on due date 26.05.2014 , (ii) Record of Financial Bids on due date 26.05.2014Record of Financial Bids on due date 27.05.2014 , (i) Record of Financial Bids on due date 28.05.2014 ,(ii) Record of Financial Bids on due date 28.05.2014 , Record of Financial Bids on due date 30.05.2014 , (i) Record of Financial Bids on due date 02.06.2014(ii )Record of Financial Bids on due date 02.06.2014(i) Record of Financial Bids on due date 03.06.2014(ii) Record of Financial Bids on due date 03.06.2014 , Record of Financial Bids on due date 04.06.2014 , Record of Financial Bids on due date 06.06.2014 , Record of Financial Bids on due date 09.06.2014 , (i) Record of Financial Bids on due date 10.06.2014 , (ii) Record of Financial Bids on due date 10.06.2014 , Record of Financial Bids on due date 13.06.2014 , (i) Record of Financial Bids on due date 16.06.2014 , (ii) Record of Financial Bids on due date 16.06.2014 , (iii) Record of Financial Bids on due date 16.06.2014 , Record of Financial Bids on due date 17.06.2014 , Record of Financial Bids on due date 18.06.2014(i) Record of Financial Bids on due date 20.06.2014 , (ii) Record of Financial Bids on due date 20.06.2014 , (iii) Record of Financial Bids on due date 20.06.2014 , Record of Financial Bids on due date 25.06.2014Record of Financial Bids on due date 30.06.2014 , Record of Financial Bids on due date 01.07.2014 , Record of Financial Bids on due date 02.07.2014 , Record of Financial Bids on due date 03.07.2014(i) Record of Financial Bids on due date 04.07.2014 , (ii) Record of Financial Bids on due date 04.07.2014 , (iii) Record of Financial Bids on due date 04.07.2014 , Record of Financial Bids on due date 07.07.2014Record of Financial Bids on due date 08.07.2014Record of Financial Bids on due date 14.07.2014Record of Financial Bids on due date 15.07.2014Record of Financial Bids on due date 17.07.2014Record of Financial Bids on due date 21.07.2014Record of Financial Bids on due date 24.07.2014(i) Record of Financial Bids on due date 28.07.2014(ii) Record of Financial Bids on due date 28.07.2014(iii) Record of Financial Bids on due date 28.07.2014 , Record of Financial Bids on due date 31.07.2014 , Record of Financial Bids on due date 01.08.2014 , (i) Record of Financial Bids on due date 04.08.2014 , (ii) Record of Financial Bids on due date 04.08.2014 , Record of Financial Bids on due date 07.08.2014 , Record of Financial Bids on due date 11.08.2014Record of Financial Bids on due date 12.08.2014 , Record of Financial Bids on due date 13.08.2014 , Record of Financial Bids on due date 14.08.2014 , (i) Record of Financial Bids on due date 19.08.2014 , (ii) Record of Financial Bids on due date 19.08.2014 , (i) Record of Financial Bids on due date 20.08.2014 , (ii) Record of Financial Bids on due date 20.08.2014 , (i) Record of Financial Bids on due date 25.08.2014 , (ii) Record of Financial Bids on due date 25.08.2014 , Record of Financial Bids on due date 1.09.2014 , Record of Financial Bids on due date 5.09.2014 , Record of Financial Bids on due date 10.09.2014 , Record of Financial Bids on due date 16.09.2014Record of Financial Bids on due date 17.09.2014Record of Financial Bids on due date 24.09.2014(i) Record of Financial Bids on due date 29.09.2014(ii) Record of Financial Bids on due date 29.09.2014(i) Record of Financial Bids on due date 30.09.2014(ii) Record of Financial Bids on due date 30.09.2014(i) Record of Financial Bids on due date 07.10.2014(ii) Record of Financial Bids on due date 07.10. 2014(i) Record of Financial Bids on due date 20.10. 2014(ii) Record of Financial Bids on due date 20.10. 2014(iii) Record of Financial Bids on due date 20.10. 2014(iv) Record of Financial Bids on due date 20.10. 2014Record of Financial Bids on due date 21.10. 2014 , Record of Financial Bids on due date 24.10. 2014(i) Record of Financial Bids on due date 27.10. 2014 , (ii) Record of Financial Bids on due date 27.10. 2014 ,  Record of Financial Bids on due date 28.10. 2014Record of Financial Bids on due date 29.10. 2014Record of Financial Bids on due date 5.11. 2014Record of Financial Bids on due date 11.11. 2014(i) Record of Financial Bids on due date 12.11. 2014(ii) Record of Financial Bids on due date 12.11. 2014(i) Record of Financial Bids on due date 13.11. 2014(ii) Record of Financial Bids on due date 13.11. 2014(i) Record of Financial Bids on due date 14.11. 2014(ii) Record of Financial Bids on due date 14.11. 2014Record of Financial Bids on due date 18.11. 2014(i) Record of Financial Bids on due date 20.11. 2014(ii) Record of Financial Bids on due date 20.11. 2014Record of Financial Bids on due date 21.11. 2014  , Record of Financial Bids on due date 25.11. 2014Record of Financial Bids on due date 26.11. 2014, Record of Financial Bids on due date 27.11. 2014, (i) Record of Financial Bids on due date 28.11. 2014(ii) Record of Financial Bids on due date 28.11. 2014, Record of Financial Bids on due date 01.12. 2014, Record of Financial Bids on due date 03.12. 2014, Record of Financial Bids on due date 04.12. 2014, Record of Financial Bids on due date 05.12. 2014, (i) Record of Financial Bids on due date 08.12. 2014, (ii) Record of Financial Bids on due date 08.12. 2014, Record of Financial Bids on due date 11.12. 2014, (i) Record of Financial Bids on due date 12.12. 2014, (ii) Record of Financial Bids on due date 12.12. 2014, (iii) Record of Financial Bids on due date 12.12. 2014, (i) Record of Financial Bids on due date 15.12. 2014, (ii) Record of Financial Bids on due date 15.12. 2014, Record of Financial Bids on due date 16.12. 2014, (i) Record of Financial Bids on due date 18.12. 2014, (ii) Record of Financial Bids on due date 18.12. 2014, (iii) Record of Financial Bids on due date 18.12. 2014, Record of Financial Bids on due date 19.12. 2014, Record of Financial Bids on due date 24.12. 2014, Record of Financial Bids on due date 26.12. 2014, Record of Financial Bids on due date 29.12.2014, Record of Financial Bids on due date 30.12.2014, (i) Record of Financial Bids on due date 31.12.2014, (ii) Record of Financial Bids on due date 31.12.2014, Record of Financial Bids on due date 5.01.2015, Record of Financial Bids on due date 6.01.2015, (i) Record of Financial Bids on due date 12.01.2015, (ii) Record of Financial Bids on due date 12.01.2015, Record of Financial Bids on due date 13.01.2015, Record of Financial Bids on due date 16.01.2015, Record of Financial Bids on due date 19.01.2015, Record of Financial Bids on due date 22.01.2015, Record of Financial Bids on due date 23.01.2015, Record of Financial Bids on due date 23.01.2015, Record of Financial Bids on due date 29.01.2015, (i) Record of Financial Bids on due date 05.02.2015, (ii) Record of Financial Bids on due date 05.02.2015, (i) Record of Financial Bids on due date 09.02.2015, (ii) Record of Financial Bids on due date 09.02.2015, Record of Financial Bids on due date 10.02.2015, Record of Financial Bids on due date 11.02.2015, Record of Financial Bids on due date 12.02.2015, Record of Financial Bids on due date 13.02.2015, (i) Record of Financial Bids on due date 16.02.2015, (ii) Record of Financial Bids on due date 16.02.2015, (i) Record of Financial Bids on due date 18.02.2015, (ii) Record of Financial Bids on due date 18.02.2015, Record of Financial Bids on due date 19.02.2015Record of Financial Bids on due date 20.02.2015Record of Financial Bids on due date 23.02.2015(i) Record of Financial Bids on due date 24.02.2015, (ii) Record of Financial Bids on due date 24.02.2015, Record of Financial Bids on due date 25.02.2015,

Note : Tender Notices/Document is in a Pre-defined Format (PDF) that 
opens in Acrobat Reader only .In case, Acrobat Reader is not available , it can be downloaded from
www.adobe.com

This page was last updated on :
26th  February 2015
.....................
Visitors:

Number of Visitor at NHAI Web Site(http://www.nhai.org/)

In case of any difficulty in downloading the Tender Notices/Documents,
Please contact : Web Admin
Tel :+ 91 (011) 25074100 & 25074200 , Ext. 1517
Email :nhai.org@gmail.comweb-admin@nhai.org


Home | Indian Road Network | Mandate | Government Policy Incentives | Programmes | Project Maps | Concession Agreement | Procurement | Organizational Structure | Contact | Piu