National Highways Developement Project - Phase III |
S.no |
Stretch |
NH No | Length (Km) |
Total Project Cost (Rs.Cr.) | Funded By | Award Date | Contractor/Concessionaire & Nationality Supervision Consultant/IEC &Nationality |
Status |
NHDP Phase IIIA |
||||||||
1 |
Banglore - Neelamangala (Six lane) |
4 |
19.5 |
445 | BOT |
Mar 2007 |
Navyuga Engineering Co. Ltd.-Indian
Aarvee Associates in JV with Bonifica-Italy-Indian |
Under Implementation |
2 |
Chattisgarh / Maharashtra Border - Wainganga Bridge |
6 |
80 |
424 | BOT |
Dec 2006 |
Ashoka - IDFC Consortium-Indian
Zaidun-Leeng SDN.BHD-Artefact Projects Ltd(JV)-Malaysian-Indian |
Completed |
3 |
Guna Bypass |
3 |
14 |
46 | BOT |
Feb 2005 |
Guna Infrastructure Ltd.-Indian
Aarvee Associates-Indian |
Completed |
4 |
Chandikhole-Duburi |
200 |
39 |
-
- |
Balance for award |
|||
5 |
Indore-Khalghat |
3 |
80 |
472 | BOT |
Jul 2005 |
Oriental Structural Engineers Pvt. Ltd.- Delhi Brass Consortium-Indian
Sheladia Associates INC - Feedback Turnkey Engineers Pvt. Ltd.-USA -Indian |
Completed |
6 |
Khalghat - MP/Maharashtra Border |
3 |
82.8 |
549 | BOT |
Oct 2007 |
Navyuga Engineering Co. Ltd.-Indian
Grontmij/carl Bro in JV with EMA Uniborn India Pvt Ltd-Denmark |
Completed |
7 |
Zirakpur - Parwanoo |
22 |
28.69 |
295 | BOT |
Feb 2007 |
Jaiprakash Associates-(Himalyan Expressways Pvt. Ltd.)-Indian
Intercontinental Consultants & Technocrafts Pvt. Ltd.- |
Completed |
8 |
Dhule - Pimpalgaon |
3 |
118 |
556 | BOT |
Mar 2005 |
IRCON-SOMA Consortium-Indian
Wilbur smith associates Inc.(USA) - WSA Pvt. Ltd. (Indian)-USA - Indian |
Completed |
9 |
Pimpalgaon - Nasik - Gonde |
3 |
60 |
940 | BOT |
Jan 2009 |
Larsen & Toubro Ltd. - ABL Consortium-Indian
Sheldia-Theme-USA-Indian |
Under Implementation |
10 |
Gonde-Vadape (Thane) |
3 |
100 |
579 | BOT |
Jun 2005 |
Gammon India Ltd. - Sadbhav - Billimoria Consortium-Indian
Sheladia Associates INC- Artefact Projects Ltd-USA |
Completed |
11 |
Bhubneshwar-Puri(Approved Length 59 Km) |
203 |
67 |
500.29 | BOT |
May 2010 |
KSS-Valecha (Bhubneshwar Expressway Pvt. Ltd.)-Indian
CEG Ltd.-Indian |
Under Implementation |
12 |
Banglore-Hoskote-Mudbagal Section |
4 |
79.724 |
565 | BOT |
Feb 2007 |
Lanco Hoskote Highway Pvt. Ltd.-Indian
Zaidun-Leeng SDN.BHD & Artefact Projects(JV)-Malaysian-Indian |
Completed |
13 |
Elevated Highway from Silk board junction to electronic city junction |
7 |
9.98 |
450 | BOT |
Dec 2005 |
SOMA - NCC - MAYTAS Consortium-Indian
Renardet S.A - CEG Ltd.-Switzerland - India |
Completed |
14 |
Bijapur - Hungund Section (Approved Length 194 Km) |
13 |
97.22 |
748 | BOT |
Feb 2010 |
SEL-MCL Consortium-Indian
- |
Completed |
15 |
Hungund-Hospet (Approved Length 194 Km) |
13 |
97.89 |
946 | BOT |
Feb 2010 |
GMR-OSE Consortium-Indian
SMEC-Indian |
Under Implementation |
16 |
Pune - Khed |
50 |
30 |
127.6 | BOT |
Aug 2003 |
IRB - Madhujaya Consortium-Indian
To be Appointed- |
Completed |
17 |
Nagpur-Wainganga Bridge (Approved Length - 60 Km) |
6 |
45.43 |
484.19 | BOT |
May 2011 |
JMC Projects India Ltd.-Indian
Artefact Projects Ltd.-Indian |
Under Implementation |
18 |
Meerut-Muzaffarnagar |
58 |
79 |
359 | BOT |
Mar 2005 |
Nagarjuna Construction Co. Ltd. - MAYTAS Consortium-Indian
BCEOM- NICE (JV)-French - Indian |
Completed |
19 |
Nagpur - kondhali |
6 |
40 |
168 | BOT |
Sep 2005 |
Atlanta - SREI Consortium (JV)-Indian
Aarvee Associates-Indian |
Under Implementation |
20 |
Parwanoo - Shimla |
22 |
103 |
-
- |
Balance for award |
|||
21 |
Muzaffarnagar - Haridwar (Approved Length 77 ) |
58, 72 |
80 |
754 | BOT |
Dec 2009 |
ERA-SIBMOST-Indian - Russian
Nicholas O'Dwyer and SA Infra- |
Under Implementation |
22 |
4 Laning of Belgaum-Khanpur Section(Km 0.00 to Km 30.00) and 2 Laning with paved sholuders of khanpur-Knt/Goa border.(Km 30.00 to Km 84.120) |
4A |
81.89 |
359 | BOT |
Jul 2010 |
GVR Infra Projects-RMN Infrastructure Ltd-Indian
Lea Associates South Asia Ltd.-Indian |
Under Implementation |
23 |
MP/Maharashtra Border-Dhule |
3 |
88.79 |
835 | BOT |
Jan 2009 |
Hindustan Construction Company Ltd. -Laing-Sadbhav Consortium-Indian-UK
Wilbur Smith Inc.-USA |
Completed |
24 |
Chandigarh - Kurali |
21 |
30 |
-
- |
Balance for award |
|||
25 |
Rohtak - Bawal(Approved Length 97 Km) |
71 |
82.553 |
650 | BOT |
Feb 2010 |
JMC-SREI(JV)-Indian
- |
Under Implementation |
26 |
Hazaribagh-Ranchi |
33 |
75 |
625.07 | Annuity |
Aug 2009 |
ITNL-Punj Lloyd Ltd.(JV)
(Hazaribagh Ranchi Express way ltd)-Indian
Unihorn India Pvt.Ltd-Indian |
Under Implementation |
27 |
Panipat - Rohtak(Approved Length 73 Km) |
71A |
80.858 |
807 | BOT |
Jan 2010 |
Sadbhav Engineering Ltd-Indian
- |
Under Implementation |
28 |
Ambala - Zirakpur |
21, 22 |
36 |
298 | BOT |
Jun 2005 |
GMR Energy Ltd. & GMR Infrastruture Ltd. Consortium-Indian
Shela dia Associates INC-USA |
Completed |
29 |
Kondhali - Telegaon |
6 |
50 |
212 | BOT |
Aug 2005 |
Oriental Structural Engineers Pvt. Ltd.- Delhi Brass Consortium-Indian
Consulting Engineers Group Ltd - Roughton International (JV)-Indian - UK |
Completed |
30 |
Delhi/UP Border to Meerut |
58 |
46 |
-
- |
Balance for award |
|||
31 |
Trichy - Karur |
67 |
79.7 |
516 | BOT |
Mar 2007 |
Reliance Energy Limited-Indian
WSA Wilbar Smith Associates-USA |
Under Implementation |
32 |
Barasat - Krishnanagar |
34 |
84 |
867 | Annuity |
Feb 2011 |
Madhucon Projects Ltd.-Indian
LEA Associates South Asia Pvt. Ltd.-Indian |
Under Implementation |
33 |
Krishnanagar - Berhampore |
34 |
78 |
702.16 | Annuity |
Feb 2011 |
SEW Infra.-Indian
YJ Eng. Company Limited in Asso. with Feedback Infra. Services. Pvt. Ltd.-Indian |
Under Implementation |
34 |
Hyderabad-Yadgiri (Approved Length 30) |
202 |
35.65 |
388 | BOT |
Dec 2009 |
Sadbhav Engineering Ltd. (Hyderabad-Yadgiri Tollways Pvt. Ltd.)-Indian
Aarevee Associates Architects Engg. & Consultants Pvt. Ltd.-Indian |
Completed |
35 |
Amritsar - Pathankot (Approved Length 101Km) |
15 |
106 |
705 | BOT |
Jul 2009 |
IRB-MRM Pvt Ltd.-Indian
ICT in asso. With MC Consulting Eng. & Singhania & Partners-Indian |
Under Implementation |
36 |
Six Laning of Bangalore-Hosur Section of NH-7 |
7 |
14.38 |
110 | NHAI |
Apr 2007 |
GVR Construction Pvt. Ltd. Chennai-Indian
Louis Burger Inc.-USA |
Completed |
37 |
Kurali - Kiratpur |
21 |
42.9 |
309 | BOT |
Dec 2006 |
BSCPL - C & C Consortium-Indian
ICT Pvt Ltd-Indian |
Completed |
38 |
Pondicherry - Tindivanam |
66 |
38.61 |
285 | BOT |
Mar 2007 |
Maytas - NCC Consortium-Indian
Louis Berger-USA |
Completed |
39 |
Delhi - Hissar (Delhi Portion) |
10 |
20 |
-
- |
Balance for award |
|||
40 |
Patna - Bakhtiarpur |
30 |
50.6 |
574 | BOT |
Dec 2010 |
BSC-C & C (JV)-Indian
CEG-Indian |
Under Implementation |
41 |
Amritsar - Wagha border |
1 |
35.93 |
205.88 | Annuity |
Aug 2007 |
Rohan Builders Pvt. Ltd. - Rajdeep Buildcon Pvt. Ltd. - IDFC Ltd. Consortium-Indian
- |
Completed |
42 |
End of Durg Bypass - Chattisgarh / Maharashtra Border |
6 |
82.685 |
464 | BOT |
Dec 2006 |
Ashoka - IDFC Consortium-Indian
Consulting Engineers Group Ltd-Indian |
Completed |
43 |
Panikholi-Rimoli (Approved Length 106 Km) |
215 |
163 |
1410 | BOT |
Aug 2011 |
Gayatri Projects Ltd.-Indian
Aarvee Associates Pvt. Ltd.-Indian |
Under Implementation |
44 |
Tirupati -Tiruthani - Chennai(Approved Length 125.5 Km) |
205 |
124.7 |
571 | BOT |
Apr 2010 |
Transstroy -OJSC Consortium(JV)-Indian-Russian
Wilbur Smit Associates in Jv with Wilbur Smit Associates Pvt. Ltd.-USA-Indian |
Under Implementation |
45 |
Duburi - Talchar |
200 |
98 |
-
- |
Balance for award |
|||
46 |
Jalandhar - Amritsar |
1 |
49 |
263 | BOT |
May 2005 |
IVRCL Infrastructure Projects Ltd.-Indian
CES India Ltd.-Indian |
Completed |
47 |
Neelamangala Junction on NH 4 with NH 48 to Devihalli |
48 |
81 |
441 | BOT |
Apr 2007 |
Lanco Devihalli Highways Pvt. Ltd.-Indian
Consulting Engineers Group Ltd.-Indian |
Completed |
48 |
Patna-Gaya-Dobhi |
83 |
125 |
-
- |
Balance for award |
|||
49 |
Madurai-Arupukottai-Tuticorin |
45B |
128.16 |
629 | BOT |
Feb 2006 |
Madhucon Projects Ltd. - SREI - Madhucon granites Ltd (JV)-Indian
Louis Berger-USA |
Completed |
50 |
Haridwar - Dehradun (Approved Length 69) |
72 |
39 |
478 | Annuity |
Dec 2009 |
ERA - SIBMOST(JV)-Indian - Russian
Intercontinental Consultants & Technocrats Pvt. Ltd.(ICT)-Indian |
Under Implementation |
51 |
Aurang - Raipur |
6 |
43.485 |
190 | BOT |
Mar 2005 |
Apollo(UK) - JLI(UK) - DSC(Indian) - LOR(UK) Consortium-UK - Indian JV
Renardet S.A - Feedback Turnkey Engineers-Switzerland-Indian |
Under Implementation |
52 |
Rimoli - Roxy - Rajamunda(Approved Length 163Km) |
215 |
96 |
586 | BOT |
Apr 2010 |
MBL-SREI-Indian
Lea Associates Pvt. Ltd.-Indian |
Under Implementation |
53 |
Karaikudi - Ramanathapuram |
210 |
100 |
-
- |
Balance for award |
|||
54 |
Trivendrum -Kerala/TN Border |
47 |
29 |
-
- |
Balance for award |
|||
55 |
Kerala/TN Border - Kanyakumari |
47 |
56 |
-
- |
Balance for award |
|||
56 |
Sitapur - Lucknow |
24 |
75 |
322 | BOT |
Aug 2005 |
Apollo(UK) - JLI(UK) - DSC(Indian) - LOR(UK) Consortium-UK - Indian JV
Wilbur smith associates Inc.(USA) - WSA Pvt. Ltd. (Indian)-USA - Indian |
Completed |
57 |
Devihalli-Hassan(Approved Length 73 Km) |
48 |
77.23 |
453 | BOT |
Apr 2010 |
Larsen & Toubro Ltd.-Indian
Lea Associates South Asia Pvt . Ltd.-Indian |
Under Implementation |
58 |
Trichy - Dindigul |
45 |
88.273 |
576 | BOT |
Mar 2007 |
Reliance Energy Limited-Indian
Zaidung-Leeng SDN.BND-Artefact Projects Ltd(JV)-Malaysian-Indian |
Completed |
59 |
Barasat - Bangaon |
35 |
60 |
-
- |
Balance for award |
|||
60 |
Patna- Muzzaffarpur |
19 & 77 |
63 |
671.3 | Annuity |
Nov 2009 |
Gammon Infrastructure Ltd-Indian
ICT-Indian |
Under Implementation |
61 |
2-Laning of Krishnagiri-Tindivanam (Approved Length 170 Km.) |
66 |
176.51 |
624 | Annuity |
May 2011 |
Transstroy (I) Ltd. - Corporation Transstroy OJSC Consortium-Indian - Russian
- |
Under Implementation |
62 |
Two Laning of Trichy - Karaikudi and Trichy Bypass(Approved Length 100 Km) |
210 & 67 |
110.372 |
374 | Annuity |
May 2010 |
Transstroy Ltd-OJSC Consortium-Indian-Russian
Euroestudios, S.L. Spain In associated with Theme Engg. Services Pvt.Ltd.-Spain-Indian |
Under Implementation |
63 |
Nagapatanam-Thanjarur |
67 |
74 |
-
- |
Balance for award |
|||
64 |
Thanjarur - Trichy |
67 |
56 |
280 | BOT |
Feb 2006 |
Madhucon Projects Ltd.-Indian
Louis Berger-USA |
Under Implementation |
65 |
Salem-Ulundrupet (BOT-1/TN-06) |
68 |
136.357 |
941 | BOT |
Mar 2007 |
Reliance Energy Limited-Indian
Technital SPA-Italy |
Under Implementation |
66 |
Kandla - Mundra Port(Approved Length 73 Km) |
8A |
71.4 |
953.88 | BOT |
Jan 2010 |
Reliance Infra Projects Ltd.-Indian
Dorsch Gruppe-Indian |
Under Implementation |
67 |
Charthalai-ochira |
47 |
83.6 |
1535 | BOT |
Jan 2010 |
ISOLUX-SOMA-Spain-Indian
- |
Under Implementation |
68 |
Bharatpur-Mahua |
11 |
57 |
250 | BOT |
Mar 2005 |
Madhucon Projects Ltd. - SREI-Indian
Aarvee Associates-Indian |
Completed |
69 |
Hyderabad-Vijayawada |
9 |
181.63 |
1740 | BOT |
May 2009 |
GMR-Punj LLOYD Consortium(GMR-Hyderabad Vijayawada Expressway Pvt. Ltd.)-Indian
ICT Pvt. Limited-Indian |
Completed |
70 |
Vijayawada-Machhlipatnam |
9 |
64.611 |
606 | BOT |
Nov 2011 |
Madhucon Projects Ltd.-Indian
- |
Under Implementation |
71 |
Delhi/Haryana Border to Rohtak |
10 |
63.49 |
486 | BOT |
Jul 2007 |
KCT - ERA consortium-Indian
ICT Pvt Ltd-Indian |
Under Implementation |
72 |
Solapur - Maharashtra/ Karnatka Border |
13 |
30 |
-
- |
Balance for award |
|||
73 |
Reengus - Sikar |
11 |
43.887 |
333.51 | Annuity |
Mar 2011 |
G.R.Infraprojects Ltd.-Indian
- |
Under Implementation |
74 |
Agra - Bharatpur |
11 |
45 |
195 | BOT |
Jul 2005 |
Oriental Structural Engineers Pvt. Ltd.- Delhi Brass Consortium-Indian
LBG Inc-USA |
Completed |
75 |
Kundapur-Surathkal & Mangalore-KNT/Kerala Border |
17 |
90 |
671 | BOT |
Nov 2009 |
Navayuga - KPCL Consortium-Indian
Aarvee Associates Architect Engineers and Consultants Pvt. Ltd.-Indian |
Under Implementation |
76 |
Mahua-Jaipur |
11 |
108 |
483 | BOT |
Mar 2005 |
JMTPL(I) Corporation Project-Malaysian
ICT Pvt Ltd-Indian |
Completed |
77 |
Jaipur-Reengus(Approved Length 52.65 Km ) |
11 |
54 |
267.81 | BOT |
Oct 2009 |
RIL-AAA- JTEG Consortium-Indian-China
M/S Grontmij Carl Bro (Denmark) in JV with SAI Consulting Engineers Pvt. Lt-Denmark-Indian |
Under Implementation |
78 |
Kota - Jhalawar |
12 |
88.09 |
530.01 | BOT |
Apr 2011 |
Keti Constructions Ltd.-Indian
Sai Consulting-Indian |
Under Implementation |
79 |
Deoli - Kota |
12 |
83 |
593 | BOT |
Apr 2010 |
GVK Development Projects Pvt Ltd-Indian
Scott Wilson Ltd-Scott Wilson India(JV)-UK-Indian |
Under Implementation |
80 |
Jaipur-Tonk - Deoli(Approved Length 148.77 Km ) |
12 |
150 |
792.06 | BOT |
Oct 2009 |
IRB-MRM Consortium-Indian
M/S Aarvee Associates Architects, Engineers & Constt. Pvt. Ltd-Indian |
Under Implementation |
81 |
Bhopal - Bareli |
12 |
297 |
-
- |
Balance for award |
|||
NHDP Phase IIIB |
||||||||
82 |
Rampur - Kathgodam |
87 |
93.226 |
790 | BOT |
Nov 2011 |
ERA Infra Engineering Ltd.-OJSC-SIBMOST (JV)-Indian - Russian
- |
Under Implementation |
83 |
MH/ KNT Border Sangareddy |
9 |
145 |
1266.6 | BOT |
Nov 2011 |
L&T Infrasructure Developement Projects Ltd-Indian
- |
Under Implementation |
84 |
Ambala-Kaithal |
65 |
78 |
-
- |
Balance for award |
|||
85 |
Hospet - Chitradurga |
13 |
120.03 |
1033.66 | BOT |
Nov 2011 |
Ramkey Infrasructure Ltd-Indian
- |
Under Implementation |
86 |
4 Laning of Solapur - Bijapur |
13 |
110.542 |
1002.48 | BOT |
Mar 2012 |
Sadbhav Engineering Limited-Indian
- |
Under Implementation |
87 |
Panji-Goa/Karnatka Border |
4A |
69 |
471 | BOT |
Jan 2010 |
IRB-MRM Consortium-Indian
- |
Under Implementation |
88 |
4-Laning of Cuttak - Angul |
42 |
112 |
1123.69 | BOT |
Nov 2011 |
Ashoka Buildcon-Indian
- |
Under Implementation |
89 |
Pondicherry - TN/Pondicherry Border |
66 |
4 |
-
- |
Balance for award |
|||
90 |
Four lanning of Ludhiyana- Talwandi section |
95 |
78 |
479 | BOT |
Dec 2010 |
Essel Infra Projects Ltd.- Pan Indian Networks Ltd.-Indian
Louis Berger Group, Inc in Asso. With LBC Pvt. Ltd.-USA |
Under Implementation |
91 |
4-lanning of Kannur Vengalem Kuttipuram (Package -II) |
17 |
81.5 |
1312 | BOT |
Jul 2009 |
KMC Construction Ltd.-Indian
- |
Under Implementation |
92 |
KNT/Kerala Border to Kanuur Section(Approved Length 286.3) |
17 |
126.6 |
1157.16 | BOT |
May 2010 |
Transstry-OJSC Consortium-Indian-Russian
CDM Smith in Jv With Wilbur Smith Associates-Indian-USA |
Under Implementation |
93 |
up to Delhi/UP Border |
1 & 24 |
8 |
-
- |
Balance for award |
|||
94 |
4-lanning of Kannur Vengalem Kuttipuram (Package -I) |
17 |
83.2 |
1366 | BOT |
Jul 2009 |
KMC Construction Ltd.-Indian
- |
Under Implementation |
95 |
Ghaziabad-Aligarh (Approved Length 106 ) |
91 |
126 |
1141 | BOT |
Dec 2009 |
SREI - PNC - GALFAR Consortium-Indian - Dubai
SNC-Lavalin Infrastructure Pvt. Ltd.-Canada |
Under Implementation |
96 |
Raipur-Simga |
200 |
28 |
-
- |
Balance for award |
|||
97 |
4 Laning of Brahampore-Faraka |
34 |
103 |
998.79 | BOT |
Feb 2010 |
Hindustan Construction Company Ltd.-Indian
URS Scott Wilson Indian Pvt. Ltd. In Associate with Rodic Consultant P Ltd.-Indian |
Under Implementation |
98 |
4 Laning of Raiganj-Dalkola |
34 |
50 |
580.43 | BOT |
Feb 2010 |
Hindustan Construction Company Ltd.-Indian
URS Scott Wilson Indian Pvt. Ltd. In Associate with Rodic Consultant P Ltd.-Indian |
Under Implementation |
99 |
4 Laning of UP/Haryana Border-Yamunanagar-Saha-Barwala- Panchkula |
73 |
107 |
934.94 | BOT |
Mar 2012 |
Gammon Infrastructure Projects Ltd.-Indian
- |
Under Implementation |
100 |
4-Laning of Solapur - Maharashtra/ Karnatka Section |
9 |
100.06 |
923.04 | BOT |
Dec 2011 |
Coastal-SREI Consortium-Indian
Artefact Projects Ltd.-Indian |
Under Implementation |
101 |
Jhansi-Khajuraho |
75 |
100 |
-
East Consult-LRP Consultants Consortium Pvt. Ltd.-Nepal |
Balance for award |
|||
102 |
4/6 Laning of Maharastra/Goa Border - Panaji Goa/KNT Border |
17 |
139 |
1872 | BOT |
May 2010 |
IVRCL Infrastructure & Projects Ltd-Indian
- |
Under Implementation |
103 |
Bhopal-Sanchi(Approved Length 40 Km) |
86Ex |
53.78 |
209 | Annuity |
May 2010 |
Pratibha Industries-Abhyuday Housing Construction Ltd-Indian
Consulting Engg. Services (I) Pvt. Ltd.-Indian |
Under Implementation |
104 |
4 Laning of Faraka-Raiganj |
34 |
103 |
1078.84 | BOT |
Feb 2010 |
Hindustan Construction Company Ltd.-Indian
URS Scott Wilson Indian Pvt. Ltd. In Associate with Rodic Consultant P Ltd.-Indian |
Under Implementation |
105 |
4-Laning of Rohtak-Jind (Approved Length 45 Km) |
71 |
48.6 |
283.25 | BOT |
Dec 2011 |
Vijai Infrastructure Ltd.-Indian
- |
Under Implementation |
106 |
Kudapa-Mydukur-Kurnool |
18 |
188.752 |
1585 | BOT |
Feb 2009 |
KMC Construction Ltd. - IVRCL Consortium-Indian
Aarevee Associates Architects-Indian |
Under Implementation |
107 |
2 Laning of Muzaffarpur - Sonbarsa(Approved Length 89 Km) |
77 |
86 |
511.54 | Annuity |
Jul 2010 |
BSCPL-C&C(JV)-Indian
ICT Pvt Ltd.-Indian |
Under Implementation |
108 |
Talegaon-Amravat(Approved Length 58Km) |
6 |
67.8 |
567 | BOT |
Aug 2009 |
IRB-MRM Consortium-Indian
Wilbur Smith Associates Pvt. Ltd.-Indian |
Under Implementation |
109 |
Gujarat/Maharashtra Border-Surat - Hazira Port Section |
6 |
132.9 |
1509.1 | BOT |
Feb 2009 |
Isolux-Soma Consortium (JV)-Spain-Indian
Sheladia Association Inc.-Multimedia Consultant Pvt Ltd-USA-Indian |
Under Implementation |
110 |
Silchar - Assam/Mizoram Border |
54 |
50 |
-
- |
Balance for award |
|||
111 |
Kishangarh-Ajmer-Beawar |
8 |
93.56 |
795 | BOT |
Apr 2009 |
Isolux-Soma Consortium-Spain-Indian
Louis Barger Group, Inc USA-USA |
Under Implementation |
112 |
4 laning of Jetpur-Somnath section of NH-8D (approved length 127.6) |
8D |
123.45 |
828 | BOT |
Sep 2010 |
IDFC-PLUS Expessway Berhad Consortium-Indian-Malaysian (JV)
- |
Under Implementation |
113 |
Pune-Sholapur Pkg-I(Approved Length Pkg I & II 170 Km) |
9 |
110.05 |
1110 | BOT |
Feb 2009 |
Navinya Buildcon-Atlantia Spa(JV)-Indian-Italy
Renardet S.A.-Switzerland |
Under Implementation |
114 |
Pune-Sholapur Pkg-II(Approved Length I & II 170 Km) |
9 |
105 |
835 | BOT |
Aug 2009 |
IL & FS Transportation Network Ltd-Indian
ICT Pvt. Ltd.-Indian |
Under Implementation |
115 |
4-Laning of Rohtak - Hissar Section |
10 |
98.81 |
959.25 | BOT |
Mar 2013 |
Sadbhav Engg. Limited-Indian
- |
Under Implementation |
116 |
Kalamboli-Mumbra(6 laning) |
4 |
20 |
-
- |
Balance for award |
|||
117 |
Panvel-Indapur |
17 |
84 |
942.69 | BOT |
Oct 2010 |
Supreme Infrastructure India Ltd.-Mahavir Road & Infrastructure Pvt. Ltd.-China State Construction Engg. Hongkong Ltd.-Indian-China
Yongma Engg.Co.Ltd. In Asso. With Feedback Venture Pvt. Ltd.-Korea-Indian |
Under Implementation |
118 |
4 Laning of Mulbagal - Karnataka / AP border-Approved Length (11 Km) |
4 |
22.18 |
141.11 | BOT |
Mar 2012 |
J.S.R. Construction Pvt Ltd-Indian
- |
Under Implementation |
119 |
Muradabad-Bareily (Approved Length 112) |
24 |
121 |
1267 | BOT |
Dec 2009 |
IL & FS Transportation Ltd.-Indian
LBG-USA |
Under Implementation |
120 |
Bareily - Sitapur(Approved Length 134 Km) |
24 |
151.2 |
1046 | BOT |
Apr 2010 |
ERA-SIBMOST-Indian-Russian
Intercontinental Consultant Pvt. Ltd.-Indian |
Under Implementation |
121 |
Kurnud-Dhamtari |
43 |
23 |
-
- |
Balance for award |
|||
122 |
2 Laning of Dindigul-Perigulam-Theni-Kumili |
220 |
134 |
485 | Annuity |
May 2010 |
Transstroy-OJSC Consortium Ltd-Indian-Russian
ICT Private Limited-Indian |
Under Implementation |
123 |
Madurai-Ramnathpuram-Rameshwaram-Dhanuskodi |
49 |
186 |
-
- |
Balance for award |
|||
124 |
4 Laning of Ahmedabad to Godhara (Approved Length 210 Km) |
59 |
117.6 |
1008.5 | BOT |
Jan 2010 |
ESSEL Infra & CR-18 Consortium-Indian-china
Egis International-Egis India Consulting Engg. Pvt. Ltd.-France-Indian |
Under Implementation |
125 |
4 Laning of Godhara to Gujarat /MP Border(Approved Length 210 Km) |
59 |
87.285 |
785.5 | BOT |
Jan 2010 |
BSPCL Ltd-Indian
Intercontinental Consultants and Technocrats Pvt. Ltd.-Indian |
Under Implementation |
126 |
4 Laning of Coimbatore-Mettupalayam |
67 |
53.93 |
592 | BOT |
Jul 2012 |
Transstroy-OJSC Consortium-Indian
- |
Under Implementation |
127 |
Obaidullaganj-Bheembetka |
69 |
13 |
-
- |
Balance for award |
|||
128 |
Four Laning of Kiratpur-Ner Chowk Section |
21 |
84.32 |
1916.79 | BOT |
Feb 2012 |
IL & FS Transportation Networks Ltd.-Indian
Getinsa Ingenieria S.L.Spain in Asso. with Segmental Cons. & Supp. Pvt. Ltd-Spain-Indian |
Under Implementation |
129 |
Beawar-Pali-Pindwara (Approved Length - 246 Km) |
14 |
244.12 |
2388 | BOT |
May 2011 |
L&T Infrastructure Development Projects Ltd.-Indian
Sheladia-Aarvee-USA-Indian |
Under Implementation |
130 |
2-Laning with PS Motihari-Raxaul (Approved Length 67 Km) |
28A |
68.79 |
375.09 | BOT |
Jan 2011 |
Tantia-Jiangsu (JV)-Indian-China (JV)
Frischmann Prabhu (India) Pvt. Ltd.-Indian |
Under Implementation |
131 |
Ranchi - Rargaon - Jamshedpur |
33 |
163.5 |
1479 | Annuity |
Mar 2011 |
Madhucon Projects Ltd.-Indian
Aarvee-Indian |
Under Implementation |
132 |
4-Laning of Punjab/Haryana Border-Jind |
71 |
68 |
438.75 | BOT |
Mar 2012 |
Unity Infraprojects Ltd.-Indian
- |
Under Implementation |
133 |
Itanagar-Arunachal Pradesh/Assam Border |
52A |
22 |
-
- |
Balance for award |
|||
134 |
Nagaland /Manipur Border -Imphal |
39 |
111 |
-
- |
Balance for award |
|||
135 |
Assam Mizoram Border to Aizawl |
54 |
140 |
-
- |
Balance for award |
|||
136 |
Shillong (Excluding Shillong By Pass ) - Jowai |
44 |
27 |
-
- |
Balance for award |
|||
137 |
2 Laning of Jowai -Meghalaya/Assam Border (Approved length 109 Km) |
44 |
102 |
390 | BOT |
Mar 2012 |
Simplex Infrastructure Ltd.-Indian
- |
Under Implementation |
138 |
Doboka-Assam/Nagaland Border |
36 |
124 |
-
- |
Balance for award |
|||
139 |
Baihata Chariali- Banderdewa |
52 |
314 |
-
- |
Balance for award |
|||
140 |
Sambalpur-Baragarh-Chattisgarh/Orrisa Border |
6 |
88 |
909 | BOT |
May 2010 |
Ashoka Buildcon Ltd-(Ashoka Sambalpur Baragarh Expressway Pvt. Ltd.)-Indian
ICT-Indian |
Under Implementation |
141 |
2-Laning with PS khagaria - Purnea |
31 |
140 |
664 | Annuity |
Feb 2011 |
Punj Lloyd Infrastructure Ltd.-Indian
Bloom Infrastructure-USA |
Under Implementation |
142 |
4 Laning of Barhi - Hazaribagh(Approved Length 40 Km) |
33 |
41.314 |
398 | BOT |
May 2010 |
Abhijeet Infrastructure Ltd-Corporate Ispat Alloy Ltd(JV)-Indian
SAI-Indian |
Under Implementation |
143 |
2 Laning of Forbesganj-Jogwani(Approved Length 13 Km) |
57A |
9.258 |
73.55 | Annuity |
May 2010 |
GPT-RDS Consortium Ltd-Indian
Unihorn India Pvt. Ltd.-Indian |
Under Implementation |
144 |
Banderdewa - Assam/AP Border |
52A |
9 |
-
- |
Balance for award |
|||
145 |
2-Laning with PS Gopalganj-Chappra |
85 |
92 |
325 | Annuity |
Feb 2011 |
Abhijeet Infrastructure Ltd.-Indian
CEG-Indian |
Under Implementation |
146 |
4 Laning of Chappra-Hajipur(Approved Length 153 Km) |
19 |
65 |
575 | Annuity |
May 2010 |
Madhucon Projects Ltd-Indian
Stanly Cunsultant Inc-USA |
Under Implementation |
147 |
Patna - Buxar |
30 & 84 |
124.85 |
1129.11 | BOT |
Nov 2011 |
Gammon Infrastructure Projects Ltd-Indian
Bloom Infrastructure-USA |
Under Implementation |
148 |
2 Laning of Mokama-Munger(Approved Length 70 Km) |
80 |
69.27 |
351.54 | Annuity |
May 2010 |
BSCPL -C & C Consortium-Indian
Nicholoso'-Dwyer-Upham Infrastructure-Irland-Indian(JV) |
Under Implementation |
149 |
4 Laning of Obedullaganj-Betul Section |
69 |
125 |
912 | BOT |
Feb 2012 |
Transstroy (India) Ltd.-Indian
- |
Under Implementation |
150 |
Assam/Meghalaya Border - Assam/Tripura Border |
44 |
116 |
-
- |
Balance for award |
|||
151 |
Kohima-Nagaland/Manipur Border |
39 |
28 |
-
- |
Balance for award |
|||
152 |
Indore-Jhabua-Gujrat/MP (Approved Length 168) |
59 |
155.15 |
1175 | BOT |
Dec 2009 |
IVRCL Infrastructure Projects Ltd.-Indian
EURO Studios Feedback Venture- |
Under Implementation |
153 |
4 Laning of Khagaria-Bakhtiarpur |
31 |
112.982 |
1635.33 | BOT |
Mar 2012 |
Navayuga Engineering Company Ltd.-Indian
- |
Under Implementation |
|
|