Projects Under Implementation as on   31st October 2016

 NHDP Wise Details

S.no
Stretch

NH No Length(Km)
On North South & East West Corridor Phase II

East-West

1
Balance work of 4 laning of Gorakpur -Gopalganj 28 41
2
Nalbari to Bijni (AS-7) 31 27.3
3
Construction of Islampur By pass 31 10.31
4
Nalbari to Bijni (AS-6) 31 25
5
Brahmputra Bridge (AS-28) 31 5
6
Bijni to Assam/WB Border (AS-10) 31C 33
7
4 Laning of NH-31D from Ghoshpukur - Salsalabari ( km 0.00 to Km . 83.785) 31-D 83.785
8
Sonapur to Guwahati (AS-3) 37 19
9
Dharamtul to Sonapur (AS-20) 37 22
10
Maibang to Lumding (AS-24) 54 15
11
Harangajo to Maibang (AS-21) 54 26
12
Harangajo to Maibang (AS-22) 54 24
13
Harangajo to Maibang (AS-23) 54 16
14
Maibang to Lumding (AS-27) 54 21
15
Maibang to Lumding (AS-26) 54 23
16
Maibang to Lumding (AS-25) 54 28
17
Chambal Bridge (RJ-5) 76 1.4

North-South

18
Chenani-Nashri 1A 12
19
Four laning of Udhambur - Ramban section of NH-1A 1A 40.17
20
Jammu - Udhampur 1A 65
21
Quazigund-Banihal 1A 15.25
22
Srinagar to Banihal 1A 67.76
23
Four laning of Ramban - Banihal section of NH-1A 1A 32.1
24
New 4 laning Agra Bypass (NS-1/UP-1) 2,3 32.8
25
Six lanning of Vadakkancherry - Thrissure section 47 30
26
Chengapalli to Coimbatore Bypass and End of Coimbatore Bypass to TN/Kerala Border 47 54.83
27
Balance work of four laning of Nagpur - Hyderbad section of NH-7(NS-62) 7 22
28
4 Laning of four stretches of Lakhnadon - Seoni ( leftout Stretches ) of NH-7 7 9.24
29
Balance work of four laning of Nagpur - Hyderabad section of NH-7( NS-60) 7 29
30
Four laning from MP/Maharashtra border to Nagpur I/C Kamptee Kanoon and Nagpur bypass 7 95
31
Gwalior - Jhansi 75 80
On Port Connectivity

Port Connectivity

32
6/8 Laning of Road port connectivity JNPT phase II -Construction of NH-348 - PKG3 348 11.09
33
Construction of NH-4B from km.21.200 to Km.27.270( D to e section) and from km.0.000 to Km.4.492 ( D to g section) of JNPT Phase -II (PKG-IV) 4B 10.56
34
Construction of Karalphata Interchange from 3.600 to km 6.073 of NH4B & from 5.300 to km 7.422 ( Old SH -54) Pkg-1 4B & 348 10.59
35
Construction of Gavanphata Interchange from 14.740 to Km 15.894 ( Old SH -54) Pkg-2 4B & 348 18.27
36
Four laning of Balance connectivity road from Visakhapatnam Port to NH5 5 4.15
37
Development of Adiquate Road Connectivity to Chennai -Ennore Port Connectivity SR 30.2
Other Phase II Projects

38
Jalandhar - Amritsar 1 20
NHDP Phase III
39
Four laning of Hospet - Chitradurga 13 120
40
Four laning of Parwanoo -Solan 22 39.14
41
Two laning with formation of Four Lane of proposed Shimla Bypass (Kaithlighat to Shimla Section) 22 27.45
42
Four laning of Patna to Koilwar 30 33.25
43
Four laning of Koilwar to Bhojpur 30 &84 43.85
44
Four of Simaria - Khagaria section of NH-31 31 60.23
45
Four laning of Bakhtiyarpur - Mokama section of NH-31 31 44.6
46
Four Laning of Barhi - Hazaribagh 33 41.27
47
4 laning of Mahulia - Baharagora - JH/WB border 33 & 6 71.61
48
Two laning with PS of Jowai -Mehalaya /Assam border section of NH-44 44 102.55
49
4 laning of Mukkola Jn to Kerala / TN border of NH-47 47 16.2
50
4 laning of Kazhakkottam to Mukkola section of NH-47 47 26.5
51
Four laning of TN/Kerala border to Villukuri 47 27.25
52
Four laning of Villukuri to Kanyakumar section of NH-47 & Nagarcoil to Kavalkinaru section of Nh-47B 47 &47-B 42.7
53
Four Laning of Madurai - Ramanathapuram (km 5. to km 81) and Two laning with PS km 81 to km 120 49 115
54
Four Laning of Forbesganj - Jogbani 57A 9
55
Four Laning with PS of NH-6 from Chichra - Kharagpur including rehabilitation of existing 4- Lane from Km134.400to Km.129.600 6 55.5
NHDP PHASE III
56
4 laning of Ambala - Kaithal - Package -1 65 50.86
57
4 laning of Ambala - Kaithal - Package -2 65 44.5
58
Two Laning with PS of Nagapattinam - Thanjavur 67 78.53
NHDP Phase III
59
UP/Haryana border - Yamuna Nagar -Saha- Barwala - Panchkula( PKG - 2) 73 41.79
60
UP/Haryana border - Yamuna Nagar -Saha- Barwala - Panchkula ( PKG - 1) 73 44.57
61
Four Laning of UP/Haryana border - Yamunanagr -Saha-Barwala-Panchkula section NH-73 (PKG-3) 73 19.2
62
Four laning of Patna - Gaya - Dhobi section of NH-83 83 127.2
63
Four laning of Bhojpur to Buxar 84 47.9
64
Two laning with PS of Chhapra -Gopalganj 85 94.25
65
Balance work of 2- lane with PS of Bhopla - Sanchi 86(Extn) 53.77
66
Four laning of Vijayawada - Machlipatnam 9 64.61
67
Ludhiana - Talwandi 95 6.02

NHDP Phase IIIA

68
Delhi/Haryana Border to Rohtak 10 63.49
69
Deoli - Kota 12 83
70
Kundapur-Surathkal & Mangalore-KNT/Kerala Border 17 90
71
Patna- Muzzaffarpur 19 & 77 63
72
Bhubneshwar-Puri(Approved Length 59 Km) 203 67
73
Tirupati -Tiruthani - Chennai(Approved Length 125.5 Km) 205 124.7
74
Two Laning of Trichy - Karaikudi and Trichy Bypass(Approved Length 100 Km) 210 & 67 110.372
75
Rimoli - Roxy - Rajamunda(Approved Length 163Km) 215 96
76
Panikholi-Rimoli (Approved Length 106 Km) 215 163
77
2/4 Laning of Talchar -Dubari-Chandikhole section of NH-200 from Km 301.89 to Km 427.85 including km 8.5 to Km 14.86 of NH-23 23 &200 132.35
78
Pimpalgaon - Nasik - Gonde 3 60
79
Patna - Bakhtiarpur 30 50.6
80
Barasat - Krishnanagar 34 84
81
Krishnanagar - Berhampore 34 78
82
4 Laning of Belgaum-Khanpur Section(Km 0.00 to Km 30.00) and 2 Laning with paved sholuders of khanpur-Knt/Goa border.(Km 30.00 to Km 84.120) 4A 81.89
83
Muzaffarnagar - Haridwar (Approved Length 77 ) 58, 72 80
84
Nagpur - kondhali 6 40.7
85
2-Laning of Krishnagiri-Tindivanam (Approved Length 170 Km.) 66 176.51
86
Trichy - Karur 67 79.7
87
Rohtak - Bawal(Approved Length 97 Km) 71 83.66
88
Haridwar - Dehradun (Approved Length 69) 72 39
89
Kandla - Mundra Port(Approved Length 73 Km) 8A 71.4

90
Panvel-Indapur 17 84
91
Kudapa-Mydukur-Kurnool 18 188.752
92
4 Laning of Chappra-Hajipur(Approved Length 153 Km) 19 65
93
Four Laning of Kiratpur-Ner Chowk Section 21 84.32
94
2 Laning of Dindigul-Perigulam-Theni-Kumili 220 134
95
Bareily - Sitapur(Approved Length 134 Km) 24 151.2
96
Muradabad-Bareily (Approved Length 112) 24 121.3
97
2-Laning with PS Motihari-Raxaul (Approved Length 67 Km) 28A 68.79
98
2-Laning with PS khagaria - Purnea 31 140
99
Ranchi - Rargaon - Jamshedpur 33 163.5
100
4 Laning of Brahampore-Faraka 34 103
101
4 Laning of Faraka-Raiganj 34 103
102
4 Laning of Raiganj-Dalkola 34 50
103
4 Laning of Ahmedabad to Godhara (Approved Length 210 Km) 59 117.6
104
Indore-Jhabua-Gujrat/MP (Approved Length 168) 59 155.15
105
Gujarat/Maharashtra Border-Surat - Hazira Port Section 6 132.9
106
Talegaon-Amravat(Approved Length 58Km) 6 67.8
107
4-Laning of Rohtak-Jind (Approved Length 45 Km) 71 48.6
108
2 Laning of Muzaffarpur - Sonbarsa(Approved Length 89 Km) 77 86
109
2 Laning of Mokama-Munger(Approved Length 70 Km) 80 69.27
110
4 laning of Jetpur-Somnath section of NH-8D (approved length 127.6) 8D 123.45
111
4-Laning of Solapur - Maharashtra/ Karnatka Section 9 100.06
112
MH/ KNT Border Sangareddy 9 145
113
Ghaziabad-Aligarh (Approved Length 106 ) 91 126
114
Four lanning of Ludhiyana- Talwandi section 95 78
NHDP Phase V

NHDP Phase V

115
Panipat - Jalandhar (Six lane) 1 291
116
6 laning of Agra - Etawah bypass 2 124.5
117
Delhi - Agra(Approved Length 180.3 Km) 2 179.5
118
Etawah -Chakeri (Kanpur) 2 160.2
119
Six-laning of Barwa Adda-Panagarh 2 122.88
120
Varanasi-Aurangabad 2 192.4
121
Four laning of Chandigarh - Kharar 21 & 95 10.18
122
Indore-Dewas(Approved Length 55 Km) 3 45.05
123
Pune Satara(Approved Length 145) 4 140.35
124
Six Laning of Krishnagiri-walajhapet section 46 148.3
125
Vijayawada-Gundugolanu Section 5 103.59
126
Six Laning of Nellore-Chilkaluripet 5 183.52
127
Six Laning of Chandikhol-Jagatpur-Bhubaneswar(Approved Length 61 Km) 5 67
128
6-Laning of Dhankuni-Khargpur Section 6 111.4
129
Six laning of Chittorgarh - Udaipur section of NH-76 PKG-III 76 93.5
130
Six laning of Kishangarh Udaipur Ahmedabad section ( near Gulabpur - end of Chittorgarh Bypass)- PKG-2 79 124.87
131
Six Laning from Km.287.400 to Km.401.200 section of NH-8 PKG-V ( Gujarat - 13 km & Rajasthan - 100.80 km) 8 113.8
132
Ahmedabad to Vadodara Section 8 102.3
133
Surat - Dahisar (Six lane) 8 239
134
Six Laning of Kamrej - Chalthan 8 16.25
135
Gurgaon - Kotputli - Jaipur (Six lane) 8 225.6
136
six laning of greenfield proposed Udaipur Bypass 8 23.88
137
Vadodara-Surat Section 8 6.74
138
Samaikhiali-Gandhidham 8A 56.16
139
4/ 6 Laning of Kharar to Ludhiana section NH-95 95 76.01
NHDP Phase IV

140
Four laning of Rampur - Kathgodam ( PKG-I) 87 43
141
Four laning of Rampur - Kathgodam ( PKG-II) 87 45
142
Four Laning of Hisar - Dabwali section with PS - Package -2 10 87.66
143
Four Laning of Hisar - Dabwali section with PS - Package -I 10 57
144
Two laning with PS of Chhapra -Rewaghat - Muzaffarpur 102 73
145
Four laning of Bar - Bilara - Jodhpur 112 111
146
Jodhpur - Barmer section of Package -II 112 74.1
147
Jodhpur - Barmer section of Package -I 112 85.61
148
Padi - Dahod 113 85.58
149
Two lane with paved shoulders of Jodhpur - Pokaran section of NH-114 ( New NH No -50) 114 139.33
150
2 laning with PS Tonk - Sawaimadhopur 116 66.8
151
2 laning with PS of Manoharpur -Dausa section of NH-11A 11A 62.31
152
Four laning / Two Laning with PS of Dausa - Lalsot - Kauthun section of NH-11A 11A Extn 83.45
153
Two laning with Paved shoulder of KarauIi - Dholpur 11B 100.9
154
Two Laning with PS of Uncha Nagla - Khanuwara - Roppas -Dholpur 123 75.08
155
2 laning with paved shoulder of Sitarganj - Tanakur section of NH-125 125 52
156
2 Laning with PS of Gulabpura - Uniara 148-D 203.97
157
Jaisalmer - Barmer 15 131.41
158
Two laning with paved shoulder Barmer - Sanchor - Gujarat boder ( up to Gandhav Bridge) section of NH-15 15 106.3
159
Bikaner - Phalodi section to Four laning from km.4.200 to km 55.25 and Two-lane paved shoulder from 55.25 to km.163.500 15 160.3
160
Phalodi -Jaisalmer section of NH-15 to two/four lane with PS 15 160.45
161
Four laning of Yadgiri - Warangal 163 99.1
162
4-Laning of Goa/Karnataka Border-Kundapur Section 17 187.24
163
Four / Six laning of Raipur - Simga ( PKG-1) 200 48.58
164
Four laning of Simga - Saragaon 200 42.44
165
Four laning of Saragaon - Bilaspur 200 35.49
166
4-Laning of Hoskote-Dobbaspet 207 80.02
167
Two/Four laning of BRT Tiger Reserve Boundary to Bangalore section of NH-209 209 170.92
168
Four Laning of Nerchowk - Pandoh including Pandoh Bypass 21 26.29
169
Two laning with paved shoulderof Kullu - Manali 21 37.34
170
Four laning of Takoli - Kullu section of NH-21 21 28.69
171
4-Laning of Solapur - Yedishi section of NH-211 211 100
172
Four Laning of Aurangabad - Yedishi 211 190.2
173
Two lane with paved shoulders of Bijapur - Gulbarga - Homnabad - section of NH-218 ( New NH No -50) 218 220.1
174
Thanjavur - Pudukottai section of NH-226 226 55.22
175
Thirumayam - Manamadurai section 226 77.72
176
Two lane with paved shoulders of Chas -Ramgarh section of NH-23 23 78.19
177
Four Laning of Ghaghra Bridge to Varanasi (PKG-II) 233 59.95
178
Four Laning of Ghaghra Bridge to Varanasi (PKG-III) 233 59.07
179
4-laning of Ghaghra bridge to Varansi ( Package -I) 233 58.62
180
Meerut - Bulandshahar 235 61.19
181
4- laning of Varanasi - Gorakpur ( PKG-II) 29 72.15
182
4- laning of Varanasi - Gorakpur ( PKG-IV) 29 65.62
183
4- laning of Varanasi - Gorakpur ( PKG-III) 29 65.38
184
Four laning of Varanasi Bypass 29&56 16.55
185
4 Laning of Guna to Biaora 3 93.5
186
4 laning of Biaora - Dewas 3 141.26
187
Four Laning of Shivpuri - Guna Package - I 3 97.7
188
Four laning of Gwalior-Shivpuri 3 125.03
189
Four / 2 Laning with PS of Govindpur ( Raigunj) - Cahs - WB border section of NH-32 32 56.88
190
Four Laning of Angul - Sambalpur 42 153
191
Widening & strengthening to 2-Lane with PS of Nimbi Jodha-Degana-Merta City Section 458 139.9
192
Four laning of Hasan to Maranahally 48 45.14
193
Four Laning of addahole to Baniwal 48 63.05
194
4 laning of Jharpokharia - Baripada - Baleashwar section of NH-5 5 80.6
195
4-Laning of Khed - Sinnar Section 50 137.946
196
4 laning of Lucknow - Sultanpur section of NH-56 56 138.9
197
Four laning of Sultanpur to Varanasi (PKG-I) 56 74.53
198
Four laning of Sultanpur to Varanasi (PKG-II) 56 63.36
199
Four Laning of Binjhabahal - Telebani 6 78.31
200
4 Laning of Baharagora - Singhara 6 111.6
201
Four laning of Orissa/Chattisgarh Border - Aurang section 6 150.4
202
4 Laning of Amravati - Chikhli (PKG-I) 6 194
203
4 Laning of Fagne - Mah-Guj Border ( PKG-3) 6 140.79
204
Four laning with PS Talebani -Sambalpur 6 50.74
205
Four laning of Kaithal - Rajasthan border 65 166.25
NHDp Phase IV
206
Salasar - Nagaur section of NH-65 65 119.59
NHDP Phase IV
207
2-Lane with paved shoulder with provision of Capacity Augmentation of Rajasthan Border-Fatehpur-Salasar Section 65 154.141
208
4 Laning of Nagpur Betul 69 176.3
209
Four Laning of Rewa - Katni - Jabalpur - Package -IV 7 68.26
210
Four Laning of Rewa - Katni - Jabalpur - Package -I 7 69.19
211
Four Laning of Rewa - Katni - Jabalpur - Package -II 7 69.07
212
Four Laning of Jabalpur - Lakhnadon 7 80.92
213
4 laning of Chultmalpur - Ganeshpur and Roorkee - Chutmalpur- Gagalheri 72-A &73 53
214
4 laning of Gagalgeri - Saharanpur - Yamunanagar ( UP/ Haryana Border) 73 51
215
Four laning of Nagina - Kashipur 74 98.8
216
4-Laning of Kashipur-Sitarganj Section 74 77.2
217
2-Laning with PS Sitarganj Bareily Section 74 74.46
218
Four laning of Haridwar - Nagina 74 72
219
2-Laning with PS of Bhilwara-Ladpura section 758 67.75
220
4-Laning of Rajsamand-Gangapur-Bhilwara 758 87.25
221
Two laning with PS of Biharaharif -Barbigha - Mokama 82 55
222
Four laning of Kagavadar - Una 8E 40.98
223
4 laning of Kodinar to Veraval section of NH-8E 8E 41.74
224
Four laning of Talaja - Mahuva 8E 45.46
225
Four laning of Mahuva to Kagavadar section of PKG-III 8E 40.02
226
Four laning of Bhavnagar - Talaja 8E 48.04
227
Four laning of Una - Kodinar 8E 40.95
228
Two laning with paved shoulder of Aligarh - Moradabad 93 146
229
2-Laning with PS Raibariely to Allahabad 24B 119
230
4 Laning of Hospet - Bellary - Karnataka /AP Border 63 95.37
231
4 laning of Hubli - Hospet section of NH-63 63 143.29
NHDP Phase VI
232
Delhi - Meerut Expreeway (PKG-2) 24 21.92
233
Delhi - Meerut Expreeway (PKG-1) 24 8.716
234
Development of six lane Eastern Peripheral Expressway ( PKG-VI) NE-II 22
235
Development of six lane Eastern Peripheral Expressway ( PKG-I) NE-II 22
236
Development of six lane Eastern Peripheral Expressway ( PKG-II) NE-II 24.5
237
Development of six lane Eastern Peripheral Expressway ( PKG-III) NE-II 24.5
238
Development of six lane Eastern Peripheral Expressway ( PKG-IV) NE-II 22
239
Development of six lane Eastern Peripheral Expressway ( PKG-V) NE-II 21
NHDP Phase VII
240
Four lane stand alone Rind Road / bypasses for Nagpur City ( PKG-II) 28.03
241
Construction of 4 Lane Laddowal bypass linking NH-95 with NH-1 17.04
242
Four lane stand alone Rind Road / bypasses for Nagpur City ( PKG-I) 33.5
Others(Misc.)
243
Improvement of Amritsar bypass by construction of additional structure and service roads on NH-1 1 0
244
8 Laning of Mukarba Chowk to Panipat 1 69.84
245
Construction of Flyover at Bahalgarh ch.41.210 and construction of additional 2-lane bridge near Rasoi Ch.32.28 on NH-1 in the state of Haryana 1 1.14
246
Four laning of Kharar - Kurali section of NH-21 21 14.13
247
2-laning with paved shoulders of Raebareli - Banda section of NH-232 232 133.28
248
2-laning with paved shoulders of Tanda -Raebareli 232 155.9
249
Bhatinda-Suratgarh (ROB) 32-B 0
Others(Misc.,)
250
4 Laning from Phagwara to Rupnagar 344A 80.82
Others ( Misc.)
251
Construction of Flyover at Km.544.650 including ROB ,Service Roads ,Footpath for RCC drains on urban link to Nagpur -Raipur road 6 6.94
Others(Misc.,)
252
Construction of Flyover /Underpass for improvement of existing Jns at IFFCO chowk at Km.28.211,Signature Chowk at Km. 29.650 and Rajiv chowk at Km. 33 8 0
Port Connectivity

Port Connectivity

253
Construction of ROB -flyover at Ranichak , Haldia 41 1.39
SARDP

254
Jorbat-Barapani 40 61.8