Projects Under Implementation as on   31st May2017

 NHDP Wise Details

S.no
Stretch

NH No Length(Km)
On North South & East West Corridor Phase II

East-West

1
Balance work of 4 laning of Gorakpur -Gopalganj 28 41
2
Nalbari to Bijni (AS-7) 31 27.3
3
Nalbari to Bijni (AS-6) 31 25
4
Brahmputra Bridge (AS-28) 31 5
5
Construction of Islampur By pass 31 10.31
6
4 Laning of NH-31D from Ghoshpukur - Salsalabari ( km 0.00 to Km . 83.785) 31-D 83.785
7
Sonapur to Guwahati (AS-3) 37 19.1
8
Dharamtul to Sonapur (AS-20) 37 22
9
Maibang to Lumding (AS-25) 54 28
10
Harangajo to Maibang (AS-22) 54 24
11
Maibang to Lumding (AS-26) 54 23
12
Harangajo to Maibang (AS-23) 54 16
13
Maibang to Lumding (AS-24) 54 15.45
14
Maibang to Lumding (AS-27) 54 21
15
Chambal Bridge (RJ-5) 76 1.4

North-South

16
Four laning of Ramban - Banihal section of NH-1A 1A 32.1
17
Srinagar to Banihal 1A 67.76
18
Jammu - Udhampur 1A 65
19
Chenani-Nashri 1A 12
20
Quazigund-Banihal 1A 15.25
21
Four laning of Udhambur - Ramban section of NH-1A 1A 40.17
22
Chengapalli to Coimbatore Bypass and End of Coimbatore Bypass to TN/Kerala Border 47 54.83
23
Six lanning of Vadakkancherry - Thrissure section 47 30
24
4 Laning of four stretches of Lakhnadon - Seoni ( leftout Stretches ) of NH-7 7 9.24
25
Balance work of four laning of Nagpur - Hyderbad section of NH-7(NS-62) 7 22
26
Four laning from MP/Maharashtra border to Nagpur I/C Kamptee Kanoon and Nagpur bypass 7 95
27
Balance work of four laning of Nagpur - Hyderabad section of NH-7( NS-60) 7 29
28
Gwalior - Jhansi 75 80
On Port Connectivity

Port Connectivity

29
6/8 Laning of Road port connectivity JNPT phase II -Construction of NH-348 - PKG3 348 11.09
30
Construction of NH-4B from km.21.200 to Km.27.270( D to e section) and from km.0.000 to Km.4.492 ( D to g section) of JNPT Phase -II (PKG-IV) 4B 10.56
31
Construction of Gavanphata Interchange from 14.740 to Km 15.894 ( Old SH -54) Pkg-2 4B & 348 18.27
32
Construction of Karalphata Interchange from 3.600 to km 6.073 of NH4B & from 5.300 to km 7.422 ( Old SH -54) Pkg-1 4B & 348 10.59
33
Four laning of Balance connectivity road from Visakhapatnam Port to NH5 5 4.15
34
Development of Adiquate Road Connectivity to Chennai -Ennore Port Connectivity SR 30.2
Other Phase II Projects

35
Jalandhar - Amritsar 1 20
NHDP Phase III
36
Four laning of Hospet - Chitradurga 13 120
37
Four laning of Parwanoo -Solan 22 39.14
38
Two laning with formation of Four Lane of proposed Shimla Bypass (Kaithlighat to Shimla Section) 22 27.45
39
Four laning of Patna to Koilwar 30 33.25
40
Four laning of Koilwar to Bhojpur 30 &84 43.85
41
Four of Simaria - Khagaria section of NH-31 31 60.23
42
Four laning of Bakhtiyarpur - Mokama section of NH-31 31 44.6
43
Four Laning of Barhi - Hazaribagh 33 41.27
44
4 laning of Mahulia - Baharagora - JH/WB border 33 & 6 71.61
45
Two laning with PS of Jowai -Mehalaya /Assam border section of NH-44 44 102.55
46
Four laning of TN/Kerala border to Villukuri 47 27.25
47
4 laning of Mukkola Jn to Kerala / TN border of NH-47 47 16.2
48
4 laning of Kazhakkottam to Mukkola section of NH-47 47 26.5
49
Four laning of Villukuri to Kanyakumari section of NH-47 & Nagarcoil to Kavalkinaru section of NH-47B 47 &47-B 42.7
50
Four Laning of Madurai - Ramanathapuram (km 5. to km 81) and Two laning with PS km 81 to km 120 49 115
51
Four Laning of Forbesganj - Jogbani 57A 9
52
Four Laning with PS of NH-6 from Chichra - Kharagpur including rehabilitation of existing 4- Lane from Km134.400to Km.129.600 6 55.5
NHDP PHASE III
53
4 laning of Ambala - Kaithal - Package -2 65 44.5
54
4 laning of Ambala - Kaithal - Package -1 65 50.86
55
Two Laning with PS of Nagapattinam - Thanjavur 67 78.53
NHDP Phase III
56
UP/Haryana border - Yamuna Nagar -Saha- Barwala - Panchkula ( PKG - 1) 73 44.57
57
UP/Haryana border - Yamuna Nagar -Saha- Barwala - Panchkula( PKG - 2) 73 41.79
58
Four Laning of UP/Haryana border - Yamunanagr -Saha-Barwala-Panchkula section NH-73 (PKG-3) 73 19.2
59
Four laning of Jhansi - Khajuraho(PKG-I) 75&76 76.61
60
Four laning of Jhansi - Khajuraho(PKG-II) 75&76 85.4
61
Four laning of Patna - Gaya - Dhobi section of NH-83 83 127.2
62
Four laning of Bhojpur to Buxar 84 47.9
63
Two laning with PS of Chhapra -Gopalganj 85 94.25
64
Balance work of 2- lane with PS of Bhopal - Sanchi 86(Extn) 53.77
65
Construction of Flyover with approaches at Halvad cross road Ch.237.400 on Bamanbore - Garamore section 8A 0
66
Four laning of Vijayawada - Machlipatnam 9 64.61
67
Ludhiana - Talwandi 95 6.02

NHDP Phase IIIA

68
Delhi/Haryana Border to Rohtak 10 63.49
69
Deoli - Kota 12 83
70
Kundapur-Surathkal & Mangalore-KNT/Kerala Border 17 90
71
Patna- Muzzaffarpur 19 & 77 63
72
Tirupati -Tiruthani - Chennai(Approved Length 125.5 Km) 205 124.7
73
Two Laning of Trichy - Karaikudi and Trichy Bypass(Approved Length 100 Km) 210 & 67 110.372
74
Panikholi-Rimoli (Approved Length 106 Km) 215 163
75
Patna - Bakhtiarpur 30 50.6
76
Krishnanagar - Berhampore 34 78
77
Muzaffarnagar - Haridwar (Approved Length 77 ) 58, 72 80
78
Nagpur - kondhali 6 40.7
79
2-Laning of Krishnagiri-Tindivanam (Approved Length 170 Km.) 66 176.51
80
Trichy - Karur 67 79.7
81
Rohtak - Bawal(Approved Length 97 Km) 71 83.66
82
Haridwar - Dehradun (Approved Length 69) 72 39
83
Kandla - Mundra Port(Approved Length 73 Km) 8A 71.4

84
Panvel-Indapur 17 84
85
Kudapa-Mydukur-Kurnool 18 188.752
86
4 Laning of Chappra-Hajipur(Approved Length 153 Km) 19 65
87
Four Laning of Kiratpur-Ner Chowk Section 21 84.32
88
2 Laning of Dindigul-Perigulam-Theni-Kumili 220 134
89
Bareily - Sitapur(Approved Length 134 Km) 24 151.2
90
Muradabad-Bareily (Approved Length 112) 24 121.3
91
2-Laning with PS Motihari-Raxaul (Approved Length 67 Km) 28A 68.79
92
2-Laning with PS Khagaria - Purnea 31 140
93
Ranchi - Rargaon - Jamshedpur 33 163.5
94
4 Laning of Faraka-Raiganj 34 103
95
4 Laning of Brahampore-Faraka 34 103
96
Indore-Jhabua-Gujrat/MP (Approved Length 168) 59 155.15
97
Talegaon-Amravat(Approved Length 58Km) 6 67.8
98
Gujarat/Maharashtra Border-Surat - Hazira Port Section 6 132.9
99
2 Laning of Muzaffarpur - Sonbarsa(Approved Length 89 Km) 77 86
100
2 Laning of Mokama-Munger(Approved Length 70 Km) 80 69.27
101
4-Laning of Solapur - Maharashtra/ Karnatka Section 9 100.06
102
MH/ KNT Border Sangareddy 9 145
103
Ghaziabad-Aligarh (Approved Length 106 ) 91 126
104
Four lanning of Ludhiyana- Talwandi section 95 78
NHDP Phase V

NHDP Phase V

105
Panipat - Jalandhar (Six lane) 1 291
106
Six laning of Handia - Varanasi 2 72.39
107
6 laning of Agra - Etawah bypass 2 124.5
108
Six-laning of Barwa Adda-Panagarh 2 122.88
109
Varanasi-Aurangabad 2 192.4
110
Delhi - Agra(Approved Length 180.3 Km) 2 179.5
111
Etawah -Chakeri (Kanpur) 2 160.2
112
Four laning of Chandigarh - Kharar 21 & 95 10.18
113
Indore-Dewas(Approved Length 55 Km) 3 45.05
114
Pune Satara(Approved Length 145) 4 140.35
115
Six laning of Chitradurga -Davanagere 4 72.7
116
Six laning of Hubli - Haveri 4 63.4
117
Six laning of Davanagere -Haveri 4 78.92
118
Six Laning of Krishnagiri-walajhapet section 46 148.3
119
Six Laning of Chandikhol-Jagatpur-Bhubaneswar(Approved Length 61 Km) 5 67
120
Six Laning of Nellore-Chilkaluripet 5 183.52
121
Vijayawada-Gundugolanu Section 5 103.59
122
6-Laning of Dhankuni-Khargpur Section 6 111.4
123
Six laning of Chittorgarh - Udaipur section of NH-76 PKG-III 76 93.5
124
Six laning of Kishangarh Udaipur Ahmedabad section ( near Gulabpur - end of Chittorgarh Bypass)- PKG-2 79 124.87
125
6 Laning of Kishangarh to Gulabpura section of NH-79A and NH-79 (PKG-1) 79&79A 90
126
Six Laning from Km.287.400 to Km.401.200 section of NH-8 PKG-V ( Gujarat - 13 km & Rajasthan - 100.80 km) 8 113.8
127
Surat - Dahisar (Six lane) 8 239
128
Six Laning of Kamrej - Chalthan 8 16.25
129
Ahmedabad to Vadodara Section 8 102.3
130
Vadodara-Surat Section 8 6.74
131
Gurgaon - Kotputli - Jaipur (Six lane) 8 225.6
132
Six Laning from existing Km.494.410 to existing Km.509.550 of NH-8 ( PKG-VII) 8 15.31
133
Six laning of Greenfield proposed Udaipur Bypass9PKG-4) 8 23.88
134
Six laning from 401.200 to Km.494.410 of NH-8 ( PKG-6) 8 93.21
135
Construction of New 4-Lane Bridge across Varsova Creek and its approaches with interchange between Surat - Dahisar 8 2.25
136
4/ 6 Laning of Kharar to Ludhiana section NH-95 95 76.01
NHDP Phase IV

137
Four laning of Rampur - Kathgodam ( PKG-I) 87 43
138
Four laning of Rampur - Kathgodam ( PKG-II) 87 45
139
Four Laning of Hisar - Dabwali section with PS - Package -2 10 87.66
140
Four Laning of Hisar - Dabwali section with PS - Package -I 10 57
141
Two laning with PS of Chhapra -Rewaghat - Muzaffarpur 102 73
142
Two laning with PS of Maheshkunt -Saharsa-Purnea 107 87.96
143
Jodhpur - Barmer section of Package -I 112 85.61
144
Four laning of Bar - Bilara - Jodhpur 112 111
145
Padi - Dahod 113 85.58
146
Two lane with paved shoulders of Jodhpur - Pokaran section of NH-114 ( New NH No -50) 114 139.33
147
2 laning with PS Tonk - Sawaimadhopur 116 66.8
148
2 laning with PS of Manoharpur -Dausa section of NH-11A 11A 62.31
149
Four laning / Two Laning with PS of Dausa - Lalsot - Kauthun section of NH-11A 11A Extn 83.45
150
Two laning with Paved shoulder of KarauIi - Dholpur 11B 100.9
151
Two Laning with PS of Uncha Nagla - Khanuwara - Roppas -Dholpur 123 75.08
152
2 laning with paved shoulder of Sitarganj - Tanakur section of NH-125 125 52
153
2 Laning with PS of Gulabpura - Uniara 148-D 203.97
154
Phalodi -Jaisalmer section of NH-15 to two/four lane with PS 15 160.45
155
Bikaner - Phalodi section to Four laning from km.4.200 to km 55.25 and Two-lane paved shoulder from 55.25 to km.163.500 15 160.3
156
Two laning with paved shoulder Barmer - Sanchor - Gujarat boder ( up to Gandhav Bridge) section of NH-15 15 106.3
157
Jaisalmer - Barmer 15 131.41
158
Four laning of Yadgiri - Warangal 163 99.1
159
4-Laning of Goa/Karnataka Border-Kundapur Section 17 187.24
160
Four / Six laning of Raipur - Simga ( PKG-1) 200 48.58
161
Four laning of Saragaon - Bilaspur 200 35.49
162
Four laning of Simga - Saragaon 200 42.44
163
Two/Four laning of BRT Tiger Reserve Boundary to Bangalore section of NH-209 209 170.92
164
Four Lane with PS of Pollachi to Coimabtore 209 26.85
165
Four laning of Takoli - Kullu section of NH-21 21 28.69
166
Four Laning of Nerchowk - Pandoh including Pandoh Bypass 21 26.29
167
Two laning with paved shoulderof Kullu - Manali 21 37.34
168
Four lanning of Bodhare - Dhule 211 67.23
169
Four Laning of Aurangabad - Yedishi 211 190.2
170
4-Laning of Solapur - Yedishi section of NH-211 211 100
171
Two lane with paved shoulders of Bijapur - Gulbarga - Homnabad - section of NH-218 ( New NH No -50) 218 220.1
172
Thanjavur - Pudukottai section of NH-226 226 55.22
173
Thirumayam - Manamadurai section 226 77.72
174
Two lane with paved shoulders of Chas -Ramgarh section of NH-23 23 78.19
175
4-laning of Ghaghra bridge to Varansi ( Package -I) 233 58.62
176
Four Laning of Ghaghra Bridge to Varanasi (PKG-III) 233 59.07
177
Four Laning of Ghaghra Bridge to Varanasi (PKG-II) 233 59.95
178
Meerut - Bulandshahar 235 61.19
179
4- laning of Varanasi - Gorakpur ( PKG-III) 29 65.38
180
4- laning of Varanasi - Gorakpur ( PKG-IV) 29 65.62
181
4- laning of Varanasi - Gorakpur ( PKG-II) 29 72.15
182
Four laning of Varanasi Bypass 29&56 16.55
183
Construction of Gorakpur bypass 29E 18.25
184
Four laning of Gwalior-Shivpuri 3 125.03
185
4 Laning of Guna to Biaora 3 93.5
186
4 laning of Biaora - Dewas 3 141.26
187
Four Laning of Shivpuri - Guna Package - I 3 97.7
188
Four / 2 Laning with PS of Govindpur ( Raigunj) - Cahs - WB border section of NH-32 32 56.88
189
Four lanning of Waranga - Mahagaon 361 66.88
190
Four lanning of Mahagaon - Yavatmal 361 80.19
191
Four laning of Tuljapur Ausa ( including Tuljapur Bypass) 361 67.42
192
Four lanning of Yavatmal -Wardha 361 64.92
193
Four lanning of Wardha - Butibori 361 59.19
194
Six Laning of Ranastalam to Anandapuram 4 47
195
Rehabilitation and upgradation of NH-4 from Nalagampalli to AP/Karnataka Border 4 47.68
196
Four Laning of Angul - Sambalpur 42 153
197
Four laning of Kodebad - Dhamtari section of NH-43 43 38.8
198
Four laning of Raipur -Kodebad section of NH-43 43 33.2
199
Four laning of Vikaravandi - Sethiyahopu 45C 65.96
200
Four Laning of Addahole to Baniwal 48 63.05
201
Four laning of Hasan to Maranahally 48 45.14
202
4 laning of Jharpokharia - Baripada - Baleashwar section of NH-5 5 80.6
203
4-Laning of Khed - Sinnar Section 50 137.946
204
4 laning of Lucknow - Sultanpur section of NH-56 56 138.9
205
Four laning of Sultanpur to Varanasi (PKG-I) 56 74.53
206
Four laning of Sultanpur to Varanasi (PKG-II) 56 63.36
207
Four laning of Chikhali - Tarsod section of NH-6 6 62.7
208
Four Laning of Binjhabahal - Telebani 6 78.31
209
4 Laning of Baharagora - Singhara 6 111.6
210
Four laning of Orissa/Chattisgarh Border - Aurang section 6 150.4
211
4 Laning of Amravati - Chikhli (PKG-I) 6 194
212
4 Laning of Fagne - Mah-Guj Border ( PKG-3) 6 140.79
213
Four Laning of Singhara - Binjhabahal 6 103.79
214
Four Laning of Tarsod - Fagne section of NH-6 6 87.3
215
Four laning with PS Talebani -Sambalpur 6 50.74
216
2-Lane with paved shoulder with provision of Capacity Augmentation of Rajasthan Border-Fatehpur-Salasar Section 65 154.141
217
Four laning of Kaithal - Rajasthan border 65 166.25
NHDp Phase IV
218
Salasar - Nagaur section of NH-65 65 119.59
NHDP Phase IV
219
4 Laning of Nagpur Betul 69 176.3
220
Four Laning of Rewa - Katni - Jabalpur - Package -IV 7 68.26
221
Four Laning of Rewa - Katni - Jabalpur - Package -I 7 69.19
222
Four Laning of Jabalpur - Lakhnadon 7 80.92
223
Four Laning of Rewa - Katni - Jabalpur - Package -II 7 69.07
224
4 Laning of Punjab/Haryana Border - Jind 71 70.17
225
4 laning of Chultmalpur - Ganeshpur and Roorkee - Chutmalpur- Gagalheri 72-A &73 53
226
4 laning of Gagalgeri - Saharanpur - Yamunanagar ( UP/ Haryana Border) 73 51
227
4-Laning of Kashipur-Sitarganj Section 74 77.2
228
Four laning of Nagina - Kashipur 74 98.8
229
Four laning of Haridwar - Nagina 74 72
230
2-Laning with PS Sitarganj Bareily Section 74 74.46
231
2-Laning with PS of Bhilwara-Ladpura section 758 67.75
232
Two laning with PS of Biharaharif -Barbigha - Mokama 82 55
233
Four laning of Talaja - Mahuva 8E 45.46
234
Four laning of Kagavadar - Una 8E 40.98
235
Four laning of Una - Kodinar 8E 40.95
236
2 Laning with PS of Gadu - Porbander 8E 92
237
4 laning of Kodinar to Veraval section of NH-8E 8E 41.74
238
Four laning of Bhavnagar - Talaja 8E 48.04
239
Four laning of Mahuva to Kagavadar section of PKG-III 8E 40.02
240
Two laning with paved shoulder of Aligarh - Moradabad 93 146
241
Construction of Partially Acess controlled Four lane Elevated Highway between Samrala Chowk to Ludhiana Municipal Limit 95 12.95
242
2-Laning with PS Raibariely to Allahabad 24B 119
243
4 laning of Hubli - Hospet section of NH-63 63 143.29
244
4 Laning of Hospet - Bellary - Karnataka /AP Border 63 95.37
NHDP Phase VI
245
Delhi - Meerut Expreeway (PKG-3) 24 21.92
246
Delhi - Meerut Expreeway (PKG-1) 24 8.716
247
Delhi - Meerut Expressway 24 19.28
248
Development of six lane Eastern Peripheral Expressway ( PKG-II) NE-II 24.5
249
Development of six lane Eastern Peripheral Expressway ( PKG-VI) NE-II 22
250
Development of six lane Eastern Peripheral Expressway ( PKG-V) NE-II 21
251
Development of six lane Eastern Peripheral Expressway ( PKG-I) NE-II 22
252
Development of six lane Eastern Peripheral Expressway ( PKG-III) NE-II 24.5
253
Development of six lane Eastern Peripheral Expressway ( PKG-IV) NE-II 22
NHDP Phase VII
254
Four lane stand alone Rind Road / bypasses for Nagpur City ( PKG-II) 28.03
255
Four lane stand alone Rind Road / bypasses for Nagpur City ( PKG-I) 33.5
256
Construction of 4 Lane Laddowal bypass linking NH-95 with NH-1 17.04
257
Construction of NH-28 4 lane bypass starting from km.17.600 of MDR -77C and terminating at km 15.650 of NH-28 28 14.7
Others(Misc.)
258
8 Laning of Mukarba Chowk to Panipat 1 69.84
259
Improvement of Amritsar bypass by construction of additional structure and service roads on NH-1 1 0
260
Four laning of Kharar - Kurali section of NH-21 21 14.13
Others(Misc)
261
Four laning of Piska More to Palma 23 23.1
Others(Misc.)
262
2-laning with paved shoulders of Raebareli - Banda section of NH-232 232 133.28
263
2-laning with paved shoulders of Tanda -Raebareli 232 155.9
264
Construction of Balance left out works on Hapur Bypass to Moradabad 24 3
Others ( Misc.,)
265
6 Laning of PNG Balance/ Road Safety Works 3 3
Others(Misc)
266
Construction of Road approaches to Rail -Cum-Road Bridge across River Ganga at Munger Ghat Near Munger 333B 14.59
Others(Misc.)
267
4 Laning from Phagwara to Rupnagar 344A 80.82
268
Construction of Flyover at Km.544.650 including ROB ,Service Roads ,Footpath for RCC drains on urban link to Nagpur -Raipur road 6 6.94
Others(Misc.,)
269
Construction of flyover from Liberty cinema to mental hospital on Nagpur Obedullaganj Road 69 3.96
270
Construction of ROB including one minor bridge and approaches with retaining wall at 8.674 near Khapri 7 1.12
Others(Misc)
271
Development of multilane carriageway from Kanhan to Automative Square 7 17.8
272
Four laning of Kutchery Chowk to Biju Para 75 34
273
Four laning of Biju Para to Kuru 75 21
Others(Misc.)
274
Construction of Flyover /Underpass for improvement of existing Jns at IFFCO chowk at Km.28.211,Signature Chowk at Km. 29.650 and Rajiv chowk at Km. 33 8 0
Port Connectivity

Port Connectivity

275
Construction of ROB -flyover at Ranichak , Haldia 41 1.39
SARDP-NE

276
Jorbat-Barapani 40 61.8