Projects Under Implementation as on   28th February2017

 NHDP Wise Details

S.no
Stretch

NH No Length(Km)
On North South & East West Corridor Phase II

East-West

1
Balance work of 4 laning of Gorakpur -Gopalganj 28 41
2
Brahmputra Bridge (AS-28) 31 5
3
Construction of Islampur By pass 31 10.31
4
Nalbari to Bijni (AS-7) 31 27.3
5
Nalbari to Bijni (AS-6) 31 25
6
4 Laning of NH-31D from Ghoshpukur - Salsalabari ( km 0.00 to Km . 83.785) 31-D 83.785
7
Dharamtul to Sonapur (AS-20) 37 22
8
Sonapur to Guwahati (AS-3) 37 19
9
Harangajo to Maibang (AS-21) 54 26
10
Maibang to Lumding (AS-24) 54 15
11
Maibang to Lumding (AS-25) 54 28
12
Maibang to Lumding (AS-26) 54 23
13
Maibang to Lumding (AS-27) 54 21
14
Harangajo to Maibang (AS-23) 54 16
15
Harangajo to Maibang (AS-22) 54 24
16
Chambal Bridge (RJ-5) 76 1.4

North-South

17
Quazigund-Banihal 1A 15.25
18
Srinagar to Banihal 1A 67.76
19
Chenani-Nashri 1A 12
20
Four laning of Ramban - Banihal section of NH-1A 1A 32.1
21
Jammu - Udhampur 1A 65
22
Four laning of Udhambur - Ramban section of NH-1A 1A 40.17
23
Six lanning of Vadakkancherry - Thrissure section 47 30
24
Chengapalli to Coimbatore Bypass and End of Coimbatore Bypass to TN/Kerala Border 47 54.83
25
Balance work of four laning of Nagpur - Hyderabad section of NH-7( NS-60) 7 29
26
Balance work of four laning of Nagpur - Hyderbad section of NH-7(NS-62) 7 22
27
4 Laning of four stretches of Lakhnadon - Seoni ( leftout Stretches ) of NH-7 7 9.24
28
Four laning from MP/Maharashtra border to Nagpur I/C Kamptee Kanoon and Nagpur bypass 7 95
29
Gwalior - Jhansi 75 80
On Port Connectivity

Port Connectivity

30
6/8 Laning of Road port connectivity JNPT phase II -Construction of NH-348 - PKG3 348 11.09
31
Construction of NH-4B from km.21.200 to Km.27.270( D to e section) and from km.0.000 to Km.4.492 ( D to g section) of JNPT Phase -II (PKG-IV) 4B 10.56
32
Construction of Gavanphata Interchange from 14.740 to Km 15.894 ( Old SH -54) Pkg-2 4B & 348 18.27
33
Construction of Karalphata Interchange from 3.600 to km 6.073 of NH4B & from 5.300 to km 7.422 ( Old SH -54) Pkg-1 4B & 348 10.59
34
Four laning of Balance connectivity road from Visakhapatnam Port to NH5 5 4.15
35
Development of Adiquate Road Connectivity to Chennai -Ennore Port Connectivity SR 30.2
Other Phase II Projects

36
Jalandhar - Amritsar 1 20
NHDP Phase III
37
Four laning of Hospet - Chitradurga 13 120
38
Two laning with formation of Four Lane of proposed Shimla Bypass (Kaithlighat to Shimla Section) 22 27.45
39
Four laning of Parwanoo -Solan 22 39.14
40
Four laning of Patna to Koilwar 30 33.25
41
Four laning of Koilwar to Bhojpur 30 &84 43.85
42
Four of Simaria - Khagaria section of NH-31 31 60.23
43
Four laning of Bakhtiyarpur - Mokama section of NH-31 31 44.6
44
Four Laning of Barhi - Hazaribagh 33 41.27
45
4 laning of Mahulia - Baharagora - JH/WB border 33 & 6 71.61
46
Two laning with PS of Jowai -Mehalaya /Assam border section of NH-44 44 102.55
47
4 laning of Kazhakkottam to Mukkola section of NH-47 47 26.5
48
4 laning of Mukkola Jn to Kerala / TN border of NH-47 47 16.2
49
Four laning of TN/Kerala border to Villukuri 47 27.25
50
Four laning of Villukuri to Kanyakumari section of NH-47 & Nagarcoil to Kavalkinaru section of Nh-47B 47 &47-B 42.7
51
Four Laning of Madurai - Ramanathapuram (km 5. to km 81) and Two laning with PS km 81 to km 120 49 115
52
Four Laning of Forbesganj - Jogbani 57A 9
53
Four Laning with PS of NH-6 from Chichra - Kharagpur including rehabilitation of existing 4- Lane from Km134.400to Km.129.600 6 55.5
NHDP PHASE III
54
4 laning of Ambala - Kaithal - Package -2 65 44.5
55
4 laning of Ambala - Kaithal - Package -1 65 50.86
56
Two Laning with PS of Nagapattinam - Thanjavur 67 78.53
NHDP Phase III
57
UP/Haryana border - Yamuna Nagar -Saha- Barwala - Panchkula( PKG - 2) 73 41.79
58
Four Laning of UP/Haryana border - Yamunanagr -Saha-Barwala-Panchkula section NH-73 (PKG-3) 73 19.2
59
UP/Haryana border - Yamuna Nagar -Saha- Barwala - Panchkula ( PKG - 1) 73 44.57
60
Four laning of Patna - Gaya - Dhobi section of NH-83 83 127.2
61
Four laning of Bhojpur to Buxar 84 47.9
62
Two laning with PS of Chhapra -Gopalganj 85 94.25
63
Balance work of 2- lane with PS of Bhopal - Sanchi 86(Extn) 53.77
64
Construction of Flyover with approaches at Halvad cross road Ch.237.400 on Bamanbore - Garamore section 8A 0
65
Four laning of Vijayawada - Machlipatnam 9 64.61
66
Ludhiana - Talwandi 95 6.02

NHDP Phase IIIA

67
Delhi/Haryana Border to Rohtak 10 63.49
68
Deoli - Kota 12 83
69
Kundapur-Surathkal & Mangalore-KNT/Kerala Border 17 90
70
Patna- Muzzaffarpur 19 & 77 63
71
Bhubneshwar-Puri(Approved Length 59 Km) 203 67
72
Tirupati -Tiruthani - Chennai(Approved Length 125.5 Km) 205 124.7
73
Two Laning of Trichy - Karaikudi and Trichy Bypass(Approved Length 100 Km) 210 & 67 110.372
74
Panikholi-Rimoli (Approved Length 106 Km) 215 163
75
2/4 Laning of Talchar -Dubari-Chandikhole section of NH-200 from Km 301.89 to Km 427.85 including km 8.5 to Km 14.86 of NH-23 23 &200 132.35
76
Patna - Bakhtiarpur 30 50.6
77
Barasat - Krishnanagar 34 84
78
Krishnanagar - Berhampore 34 78
79
Muzaffarnagar - Haridwar (Approved Length 77 ) 58, 72 80
80
Nagpur - kondhali 6 40.7
81
2-Laning of Krishnagiri-Tindivanam (Approved Length 170 Km.) 66 176.51
82
Trichy - Karur 67 79.7
83
Rohtak - Bawal(Approved Length 97 Km) 71 83.66
84
Haridwar - Dehradun (Approved Length 69) 72 39
85
Kandla - Mundra Port(Approved Length 73 Km) 8A 71.4

86
Panvel-Indapur 17 84
87
Kudapa-Mydukur-Kurnool 18 188.752
88
4 Laning of Chappra-Hajipur(Approved Length 153 Km) 19 65
89
Four Laning of Kiratpur-Ner Chowk Section 21 84.32
90
2 Laning of Dindigul-Perigulam-Theni-Kumili 220 134
91
Muradabad-Bareily (Approved Length 112) 24 121.3
92
Bareily - Sitapur(Approved Length 134 Km) 24 151.2
93
2-Laning with PS Motihari-Raxaul (Approved Length 67 Km) 28A 68.79
94
2-Laning with PS khagaria - Purnea 31 140
95
Ranchi - Rargaon - Jamshedpur 33 163.5
96
4 Laning of Faraka-Raiganj 34 103
97
4 Laning of Raiganj-Dalkola 34 50
98
4 Laning of Brahampore-Faraka 34 103
99
Indore-Jhabua-Gujrat/MP (Approved Length 168) 59 155.15
100
Gujarat/Maharashtra Border-Surat - Hazira Port Section 6 132.9
101
Talegaon-Amravat(Approved Length 58Km) 6 67.8
102
2 Laning of Muzaffarpur - Sonbarsa(Approved Length 89 Km) 77 86
103
2 Laning of Mokama-Munger(Approved Length 70 Km) 80 69.27
104
MH/ KNT Border Sangareddy 9 145
105
4-Laning of Solapur - Maharashtra/ Karnatka Section 9 100.06
106
Ghaziabad-Aligarh (Approved Length 106 ) 91 126
107
Four lanning of Ludhiyana- Talwandi section 95 78
NHDP Phase V

NHDP Phase V

108
Panipat - Jalandhar (Six lane) 1 291
109
6 laning of Agra - Etawah bypass 2 124.5
110
Delhi - Agra(Approved Length 180.3 Km) 2 179.5
111
Etawah -Chakeri (Kanpur) 2 160.2
112
Varanasi-Aurangabad 2 192.4
113
Six-laning of Barwa Adda-Panagarh 2 122.88
114
Four laning of Chandigarh - Kharar 21 & 95 10.18
115
Indore-Dewas(Approved Length 55 Km) 3 45.05
116
Pune Satara(Approved Length 145) 4 140.35
117
Six Laning of Krishnagiri-walajhapet section 46 148.3
118
Six Laning of Chandikhol-Jagatpur-Bhubaneswar(Approved Length 61 Km) 5 67
119
Six Laning of Nellore-Chilkaluripet 5 183.52
120
Vijayawada-Gundugolanu Section 5 103.59
121
6-Laning of Dhankuni-Khargpur Section 6 111.4
122
Six laning of Chittorgarh - Udaipur section of NH-76 PKG-III 76 93.5
123
Six laning of Kishangarh Udaipur Ahmedabad section ( near Gulabpur - end of Chittorgarh Bypass)- PKG-2 79 124.87
124
6 Laning of Kishangarh to Gulabpura section of NH-79A and NH-79 (PKG-1) 79&79A 90
125
six laning of greenfield proposed Udaipur Bypass 8 23.88
126
Ahmedabad to Vadodara Section 8 102.3
127
Six Laning from existing Km.494.410 to existing Km.509.550 of NH-8 ( PKG-VII) 8 15.31
128
Six laning from 401.200 to Km.494.410 of NH-8 ( PKG-6) 8 93.21
129
Surat - Dahisar (Six lane) 8 239
130
Six Laning from Km.287.400 to Km.401.200 section of NH-8 PKG-V ( Gujarat - 13 km & Rajasthan - 100.80 km) 8 113.8
131
Gurgaon - Kotputli - Jaipur (Six lane) 8 225.6
132
Six Laning of Kamrej - Chalthan 8 16.25
133
Vadodara-Surat Section 8 6.74
134
4/ 6 Laning of Kharar to Ludhiana section NH-95 95 76.01
NHDP Phase IV

135
Four laning of Rampur - Kathgodam ( PKG-I) 87 43
136
Four laning of Rampur - Kathgodam ( PKG-II) 87 45
137
Four Laning of Hisar - Dabwali section with PS - Package -I 10 57
138
Four Laning of Hisar - Dabwali section with PS - Package -2 10 87.66
139
Two laning with PS of Chhapra -Rewaghat - Muzaffarpur 102 73
140
Jodhpur - Barmer section of Package -I 112 85.61
141
Four laning of Bar - Bilara - Jodhpur 112 111
142
Padi - Dahod 113 85.58
143
Two lane with paved shoulders of Jodhpur - Pokaran section of NH-114 ( New NH No -50) 114 139.33
144
2 laning with PS Tonk - Sawaimadhopur 116 66.8
145
2 laning with PS of Manoharpur -Dausa section of NH-11A 11A 62.31
146
Four laning / Two Laning with PS of Dausa - Lalsot - Kauthun section of NH-11A 11A Extn 83.45
147
Two laning with Paved shoulder of KarauIi - Dholpur 11B 100.9
148
Two Laning with PS of Uncha Nagla - Khanuwara - Roppas -Dholpur 123 75.08
149
2 laning with paved shoulder of Sitarganj - Tanakur section of NH-125 125 52
150
2 Laning with PS of Gulabpura - Uniara 148-D 203.97
151
Phalodi -Jaisalmer section of NH-15 to two/four lane with PS 15 160.45
152
Two laning with paved shoulder Barmer - Sanchor - Gujarat boder ( up to Gandhav Bridge) section of NH-15 15 106.3
153
Jaisalmer - Barmer 15 131.41
154
Bikaner - Phalodi section to Four laning from km.4.200 to km 55.25 and Two-lane paved shoulder from 55.25 to km.163.500 15 160.3
155
Four laning of Yadgiri - Warangal 163 99.1
156
4-Laning of Goa/Karnataka Border-Kundapur Section 17 187.24
157
Four laning of Simga - Saragaon 200 42.44
158
Four laning of Saragaon - Bilaspur 200 35.49
159
Four / Six laning of Raipur - Simga ( PKG-1) 200 48.58
160
4-Laning of Hoskote-Dobbaspet 207 80.02
161
Two/Four laning of BRT Tiger Reserve Boundary to Bangalore section of NH-209 209 170.92
162
Four laning of Takoli - Kullu section of NH-21 21 28.69
163
Two laning with paved shoulderof Kullu - Manali 21 37.34
164
Four Laning of Nerchowk - Pandoh including Pandoh Bypass 21 26.29
165
Four Laning of Aurangabad - Yedishi 211 190.2
166
4-Laning of Solapur - Yedishi section of NH-211 211 100
167
Two lane with paved shoulders of Bijapur - Gulbarga - Homnabad - section of NH-218 ( New NH No -50) 218 220.1
168
Thirumayam - Manamadurai section 226 77.72
169
Thanjavur - Pudukottai section of NH-226 226 55.22
170
Two lane with paved shoulders of Chas -Ramgarh section of NH-23 23 78.19
171
4-laning of Ghaghra bridge to Varansi ( Package -I) 233 58.62
172
Four Laning of Ghaghra Bridge to Varanasi (PKG-II) 233 59.95
173
Four Laning of Ghaghra Bridge to Varanasi (PKG-III) 233 59.07
174
Meerut - Bulandshahar 235 61.19
175
4- laning of Varanasi - Gorakpur ( PKG-II) 29 72.15
176
4- laning of Varanasi - Gorakpur ( PKG-III) 29 65.38
177
4- laning of Varanasi - Gorakpur ( PKG-IV) 29 65.62
178
Four laning of Varanasi Bypass 29&56 16.55
179
Construction of Gorakpur bypass 29E 18.25
180
4 laning of Biaora - Dewas 3 141.26
181
Four laning of Gwalior-Shivpuri 3 125.03
182
Four Laning of Shivpuri - Guna Package - I 3 97.7
183
4 Laning of Guna to Biaora 3 93.5
184
Four / 2 Laning with PS of Govindpur ( Raigunj) - Cahs - WB border section of NH-32 32 56.88
185
Four laning of Tuljapur Ausa ( including Tuljapur Bypass) 361 67.42
186
Four Laning of Angul - Sambalpur 42 153
187
Four laning of Kodebad - Dhamtari section of NH-43 43 38.8
188
Four laning of Raipur -Kodebad section of NH-43 43 33.2
189
Four laning of Hasan to Maranahally 48 45.14
190
Four Laning of Addahole to Baniwal 48 63.05
191
4 laning of Jharpokharia - Baripada - Baleashwar section of NH-5 5 80.6
192
4-Laning of Khed - Sinnar Section 50 137.946
193
4 laning of Lucknow - Sultanpur section of NH-56 56 138.9
194
Four laning of Sultanpur to Varanasi (PKG-I) 56 74.53
195
Four laning of Sultanpur to Varanasi (PKG-II) 56 63.36
196
Four laning of Chikhali - Tarsod section of NH-6 6 62.7
197
Four Laning of Binjhabahal - Telebani 6 78.31
198
Four laning with PS Talebani -Sambalpur 6 50.74
199
Four laning of Orissa/Chattisgarh Border - Aurang section 6 150.4
200
Four Laning of Tarsod - Fagne section of NH-6 6 87.3
201
4 Laning of Amravati - Chikhli (PKG-I) 6 194
202
4 Laning of Baharagora - Singhara 6 111.6
203
4 Laning of Fagne - Mah-Guj Border ( PKG-3) 6 140.79
NHDp Phase IV
204
Salasar - Nagaur section of NH-65 65 119.59
NHDP Phase IV
205
2-Lane with paved shoulder with provision of Capacity Augmentation of Rajasthan Border-Fatehpur-Salasar Section 65 154.141
206
Four laning of Kaithal - Rajasthan border 65 166.25
207
4 Laning of Nagpur Betul 69 176.3
208
Four Laning of Rewa - Katni - Jabalpur - Package -I 7 69.19
209
Four Laning of Rewa - Katni - Jabalpur - Package -II 7 69.07
210
Four Laning of Rewa - Katni - Jabalpur - Package -IV 7 68.26
211
Four Laning of Jabalpur - Lakhnadon 7 80.92
212
4 laning of Chultmalpur - Ganeshpur and Roorkee - Chutmalpur- Gagalheri 72-A &73 53
213
4 laning of Gagalgeri - Saharanpur - Yamunanagar ( UP/ Haryana Border) 73 51
214
2-Laning with PS Sitarganj Bareily Section 74 74.46
215
4-Laning of Kashipur-Sitarganj Section 74 77.2
216
Four laning of Nagina - Kashipur 74 98.8
217
Four laning of Haridwar - Nagina 74 72
218
2-Laning with PS of Bhilwara-Ladpura section 758 67.75
219
Two laning with PS of Biharaharif -Barbigha - Mokama 82 55
220
Four laning of Talaja - Mahuva 8E 45.46
221
Four laning of Mahuva to Kagavadar section of PKG-III 8E 40.02
222
Four laning of Bhavnagar - Talaja 8E 48.04
223
Four laning of Kagavadar - Una 8E 40.98
224
2 Laning with PS of Gadu - Porbander 8E 92
225
Four laning of Una - Kodinar 8E 40.95
226
4 laning of Kodinar to Veraval section of NH-8E 8E 41.74
227
Two laning with paved shoulder of Aligarh - Moradabad 93 146
228
2-Laning with PS Raibariely to Allahabad 24B 119
229
4 Laning of Hospet - Bellary - Karnataka /AP Border 63 95.37
230
4 laning of Hubli - Hospet section of NH-63 63 143.29
NHDP Phase VI
231
Delhi - Meerut Expreeway (PKG-3) 24 21.92
232
Delhi - Meerut Expreeway (PKG-1) 24 8.716
233
Development of six lane Eastern Peripheral Expressway ( PKG-IV) NE-II 22
234
Development of six lane Eastern Peripheral Expressway ( PKG-V) NE-II 21
235
Development of six lane Eastern Peripheral Expressway ( PKG-III) NE-II 24.5
236
Development of six lane Eastern Peripheral Expressway ( PKG-II) NE-II 24.5
237
Development of six lane Eastern Peripheral Expressway ( PKG-I) NE-II 22
238
Development of six lane Eastern Peripheral Expressway ( PKG-VI) NE-II 22
NHDP Phase VII
239
Construction of 4 Lane Laddowal bypass linking NH-95 with NH-1 17.04
240
Four lane stand alone Rind Road / bypasses for Nagpur City ( PKG-I) 33.5
241
Four lane stand alone Rind Road / bypasses for Nagpur City ( PKG-II) 28.03
242
Construction of NH-28 4 lane bypass starting from km.17.600 of MDR -77C and terminating at km 15.650 of NH-28 28 14.7
Others(Misc.)
243
Improvement of Amritsar bypass by construction of additional structure and service roads on NH-1 1 0
244
8 Laning of Mukarba Chowk to Panipat 1 69.84
245
Four laning of Kharar - Kurali section of NH-21 21 14.13
246
2-laning with paved shoulders of Raebareli - Banda section of NH-232 232 133.28
247
2-laning with paved shoulders of Tanda -Raebareli 232 155.9
248
Construction of Balance left out works on Hapur Bypass to Moradabad 24 3
249
4 Laning from Phagwara to Rupnagar 344A 80.82
250
Construction of Flyover at Km.544.650 including ROB ,Service Roads ,Footpath for RCC drains on urban link to Nagpur -Raipur road 6 6.94
Others(Misc.,)
251
Construction of flyover from Liberty cinema to mental hospital on Nagpur Obedullaganj Road 69 3.96
252
Construction of ROB including one minor bridge and approaches with retaining wall at 8.674 near Khapri 7 1.12
Others(Misc.)
253
Construction of Flyover /Underpass for improvement of existing Jns at IFFCO chowk at Km.28.211,Signature Chowk at Km. 29.650 and Rajiv chowk at Km. 33 8 0
Port Connectivity

Port Connectivity

254
Construction of ROB -flyover at Ranichak , Haldia 41 1.39
SARDP-NE

255
Jorbat-Barapani 40 61.8