| S.no |
State |
Title
|
Download
File |
|
1 |
Andhra
Pradesh |
DESIGN,CONSTRUCTION,DEVELOPMENT,FINANCE,OPERATION
AND MAINTENANCE OF KM 80.050 ( JADCHERLA ) TO KM 135.469 ( END OF PROPOSED
KOTAKATTA BYPASS ) ON NH-7 IN THE STATE OF ANDHRA PRADESH TOGETHER CALLED THE
"PROJECT " IN THE STATE OF ANDHRA PRADESH ON BUILD OPERATE & TRANSFER (BOT) BASIS |
CA-VOL-I
, CA-VOL-II |
|
2 |
Andhra
Pradesh |
DESIGN,ENGINEERING,FINANCE,CONSTRUCTION,OPERATION
AND MAINTENANCE OF 4 LANNING OF ARMUR-ADLOOR YELLAREDDY SECTION OF NAGPUR
HYDREBAD OF NH-7 FROM KM 308.000 TO KM 367.000 IN THE STATE OF ANDHRA PRADESH
UNDER NHDP PHASE-II ON DESIGN,BUILD,FINANCE,OPERATE
AND TRANSFER ( DBFOT ) BASIS |
CA-VOL-I
, CA-VOL-II, CA-VOL-III |
|
3 |
Andhra
Pradesh |
CONSTRUCTION
SUPERVISION CONSULTANCY PACKAGE NO. GQ/GM(E)/SC AP-2 |
CA |
|
4 |
Andhra
Pradesh |
| SIX
LANNING OF CHILKALURIPET-VIJAYWADA SECTION OF NH-5 FROM
KM 355.00 TO KM 434.15 ( LENGTH-82.5 KM) IN THE STATE OF
ANDHRA PRADESH TO BE EXECUTED AS BOT ( TOLL ) ON DBFO
PATTERN UNDER NHDP PHASE-V |
|
CA |
|
5 |
Andhra
Pradesh |
| DESIGN
CONSTRUCTION DEVELOPMENT, FINANCE,OPERATION AND
MAINTENANCE OF KM 278.00 ( KADTAL) TO 308.00 (
ARMUR ) ON NH-7 IN THE STATE OF ANDHRA PRADESH
UNDER NORTH-SOUTH CORIDOR (NHDP) PHASE II) ON BUILD
OPERATE AND TRANSFER ( ANNUITY ) BASIS |
|
CA |
|
6 |
Andhra
Pradesh |
| DESIGN,CONSTRUCTION,DEVELOPMENT,FINANCE,OPERATION
AND MAINTENANCE OF KM 135.469 ( END OF PROPOSED
KOTAKATTA BYPASS ) TO KM 211 ( KURNOOL) ON NH-7 IN THE
STATE OF ANDHRA PRADESH UNDER NORTH-SOUTH CORRIDOR (
NHDP PHASE II ) O BOT ( ANNUITY ) BASIS |
|
CA-VOL-I
, CA-VOL-II |
|
7 |
Andhra
Pradesh |
NELLORE
BYPASS |
CA |
|
8 |
Andhra
Pradesh |
WIDENING AND
STRENGTHENING OF SECTION A-TADA TO NELLORE ( NH-5 ) B- NANDIGAMA TO
IBRAHIMPATNAM TO VIJAYWADA ( NH-9) IN THE STATE OF ANDHRA PRADESH, INDIA AND
ITS OPERATION AND MAINTENANCE ON BUILD,OPERATE AND TRANSFER ( BOT ) BASIS |
CA-VOL-I
, CA-VOL-II,
CA-VOL-III
|
|
9 |
Andhra
Pradesh |
DESIGN
CONSTRUCTION DELOPMENT, FINANCE, OPERATION AND MAINTENANCE OF 4/6 LANNING OF
HYDREBAD -VIJAYWADA SECTION FROM KM 40.000 TO KM 221.500 ON NH-9 IN THE STATE
OF ANDHRA PRADESH |
CA-VOL-I
, CA-VOL-II |
|
10 |
Andhra
Pradesh |
DESIGN,CONSTRUCTION,DEVELOPMENT,FINANACE,OPERATION
AND MAINTENANCE OF KM 367.000 ( ADLOOR
YELLAREDDY ) TO KM 447.000 AND II ) IMPROVEMENT, OPERATION & MAINTENANCE
OF KM 447.000 TO KM 464.000 ( GUNDLA POCHAMAPALLI ) ON NH-7 IN THE STATE
OF ANDHRA PRADESH |
CA-VOL-I
, CA-VOL-II CA-VOL-III , CA-VOL-IV CA-VOL-V CA-VOL-VI CA-VOLVII |
|
11 |
Andhra
Pradesh |
DESIGN,CONSTRUCTION,DEVELOPMENT,FINANCE,OPERATION
AND MAINTENANCE OF ISLAM NAGAR ( KM 230.00 ) TO KADTAL ( KM 278.00 ) OF
NAGPUR-HYDREBAD SECTION ON NH-7 IN THE STATE OF ANDHRA PRADESH , UNDER
NORTH-SOUTH CORRIDOR ( NHDP PHASE-II ) ON BOT ( ANNUITY ) BASIS |
CA-VOL-I
, CA-VOL-II,
CA-VOL-III,
CA-VOL-IV, CA-VOL-V, CA-VOL-VI, CA-VOL-VII CA-VOL-VIII CA-VOL-VIII |
|
12 |
Andhra
Pradesh |
DESIGN,CONSTRUCTIO,DEVELOPMENT,FINANCE,OPERATION
AND MAINTENANCE OF KM 34.1 ( FARUKHNAGAR ) TO KM 80.00 ( JADCHERLA ) AND (II)
IMPROVEMENT,OPERATION & MAINTENANCE OF KM 22.3 ( THONDAPALLI ) TO KM 34.1
( FARUKHNAGAR ) ON NH-7 IN THE STATE OF ANDHRA PRADESH
UNDER NORTH-SOUTH CORRIDOR ( NHDP PHASE II ) ON BUILD,OPERATE AND TRANSFER (
BOT ) BASIS |
CA-VOL-I
,
CA-VOL-II
,
CA-VOL-III ,
CA-VOL-IV |
|
13 |
Andhra
Pradesh |
DESIGN,CONSTRUCTION,DEVELOPMENT,FINANCE,OPERATION
AND MAINTENANCE OF KM 175.000 TO KM 230.000 ON NH-7 IN THE STATE OF ANDHRA
PRADESH UNDER NORTH SOUTH CORRIDOR ( NHDP PHASE II ) ON BUILD, OPERATE AND
TRANSFER ( ANNUITY ) BASIS |
CA-VOL-I
, CA-VOL-II |
|
14 |
Assam |
FOUR
LANNING OF JORBAT-SHILLONG ( BARAPANI ) SECTION OF NH-40 FROM
KM 0.000 TO 61.800 IN THE STATE OF ASSAM AND MEGHALAYA ON
DBFOT PATTERN UNDER SARDP-NE ON BOT ( ANNUITY ) BASIS |
CA-VOL-I
|
|
15 |
Bihar |
DESIGN, CONSTRUCTION, FINANCE, OPERATION & MAINTENANCE OF 4 LANE BRIDGE ACROSS RIVER KOSI INCLUDES ITS APPROCHES AND GUIDE BUND & AFFLUX BUND FROM KM 155.00 TO KM 165.00 ON NH - 57 IN THE STATE OF BIHAR ON ANNUITY BASIS. |
CA-VOL-I
CA-VOL-II
|
|
16 |
Bihar |
UP GRADATION OF HAJIPUR - MUZAFFARPUR SECTION OF THE EXISTING NH - 77 TO FOUR LANE DUAL CARRIAGEWAY CONFIGURATION OF THE SECTION STARTING FROM KM 0.00 (RAMASHISH CHOWK) TO KM 46.300 AND CONNECTING NH - 28 OF EAST-WEST CORRIDOR AT KM 515.045 IN THE STATE OF BIHAR ON BOT (ANNUITY) BASIS UNDER NHDP PHASE III. |
CA-VOL-I
CA-VOL-II
CA-VOL-III
|
|
17 |
Bihar |
FOUR LANING OF BARHI HAZARIBAGH SECTION FROM KM 0.00 TO KM 40.500 OF NH 33 IN THE STATE OF JHARKHAND ON DESIGN, BUILT, FINANCE, OPERATE AND TRANSFER (DBFOT) TOLL BASIS UNDER NHDP PHASE III PROJECT. |
CA-VOL-I
CA-VOL-II
|
|
18 |
Bihar |
UPGRADING TO 4LANE DIVIDED CARRIAGE WAY CONFIGURATION OF SIX SECTIONS OF NH STRETCHES IN BIHAR UNDER 10000 KM (NON NHDP) PROGRAMME -GOPALGANJ-CHHAPRA - HAJIPUR SECTION OF NH-19 . |
CA-VOL-I
CA-VOL-II
|
|
19 |
Bihar |
| FOUR LANING OF HAZARIBAGH -
RANCHI SECTION OF NH - 33 FROM KM 40.500 TO KM 114.000
IN THE STATE OF JHARKHAND UNDER NHDP PHASE III ON BOT
(ANNUITY) BASIS | |
CA-VOL-I
CA-VOL-II
CA-VOL-III
|
|
20 |
Bihar |
| TWO LANING WITH PAVED SHOULDERS
OF MOKAMA MUNGER SECTION OF NH - 80 FROM KM 1.430 TO KM
70.00 IN THE STATE OF BIHAR UNDER NHDP III ON DESIGN,
BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY
BASIS PROJECT | |
CA |
|
21 |
Bihar |
| SIX LANING OF VARANASI -
AURANGABAD SECTION OF NH 2 FROM KM 786.00 TO KM 978.400(
LENGTH 192.400 KM) IN THE STATE OF UTTAR PRADESH AND
BIHAR ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER
(DBFOT) TOLL BASIS UNDER NHDP PHASE -
V | |
CA-VOL-I
CA-VOL-II
|
|
22 |
Bihar |
| TWO LANING OF MUZAFFARPUR -
SONBARSA SECTION OF NH 77 (FROM KM 2.8 TO KM 89.00) IN
THE STATE OF BIHAR UNDER NHDP III ON DESIGN,BUILD,
FINANCE, OPERATE AND TRANSFER (DBFOT) ANNUITY BASIS
PROJECT | |
CA |
|
23 |
Bihar |
| REHABILITATION AND UPGRADING OF
EXISTING INTERMEDIATE LANE ROADS TO 2 LANE WITH PAVED
SHOULDERS OF FORBESGANJ - JOGBANI (KM 0.000 TO KM 9.258)
ON NH 57A IN THE STATE OF BIHAR UNDER NHDP PHASE - III
ON DBFOT ANNUITY BASIS | |
CA-VOL-I
CA-VOL-II
CA-VOL-III
|
| 24 |
Delhi |
SECOND
VIVEKANAND BRIDGE TOLLWAY COMPANY 57, NEHRU PLACE NEW DELHI |
|
|
25 |
Delhi |
(BADARPUR
ELEVATED HIGHWAY) DESIGN,ENGINEERING,
FINANCE CONSTRUCTION, OPERATION AND MAINTENANCE OF 6 LANE ELEVATED HIGHWAY
FROM KM 16.100 to 20.500 ON DELHI-AGRA SECTION OF NH-2 IN THE STATES OF
DELHI/HARYANA ON BUILD OPERATE AND TRANSFER (BOT) BASIS |
CA |
|
26 |
Delhi
|
Conversion of Delhi-Gurgaon Section of NH-8 into an access controlled eight/six lane highway from km 14.30 to km 42.00 |
CA |
|
27 |
Goa
|
DESIGN, ENGINEERING, FINANCE, CONSTRUCTION, OPERATION AND MAINTENANCE OF THE FOUR LANING OF GOA/KARNATAKA BORDER TO PANAJI GOA SECTION OF NH - 4A FROM KM 84.000 TO KM 153.070 IN THE STATE OF GOA UNDER NHDP PHASE III ON, BUILD, OPERATE AND TRANSFER (BOT) TOLL BASIS |
CA-VOL-I
CA-VOL-II
CA-VOL-III
|
|
28 |
Gujarat
|
FOUR
(SIX) LANING OF GANDHIDHAM (KALDLA) MUNDRA PORT
SECTION OF NH - 8A (EXTENSION) (APPROX. LENGTH
71.400 KM) IN THE STATE OF GUJARAT UNDER NHDP
PHASE III THROUGH PUBLIC - PRIVATE/PUBLIC SECTOR
PARTNERSHIP (PPP) ON DESIGN, BUILD, FINANCE,
OPERATE AND TRANSFER (DBFOT) BASIS |
CA-VOL-I
|
|
29 |
Gujarat
|
FOUR
LANING OF AHMEDABAD TO GODHRA SECTION OF NH - 59
FROM KM 4.200 TO KM 122.420 IN STATE OF GUJARAT ON
DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBOFTO)
BASIS UNDER NHDP PHASE III |
CA-VOL-I
CA-VOL-II
|
|
30 |
Gujarat
|
FOUR
LANING OF GODHRA TO GUJARAT / MADHYA PRADESH
BORDER SECTION OF NH 59 FROM KM 129.300 TO KM
215.900 IN THE STATE OF GUJARAT UNDER NHDP PHASE
III ON DESIGN, BUILD, FINANCE, OPERATE AND
TRANSFER (DBFOT) BASIS |
CA-VOL-I
CA-VOL-II
|
|
31 |
Gujarat
|
FOUR
LANING OF GUJARAT MAHARASHTRA BORDER SURAT - HAZIRA PORT
SECTION OF NH 6 (APPROX. LENGTH 132.913 KM) IN THE STATE
OF GUJARAT UNDER NHDP PHASE III THROUGH PUBLIC -
PRIVATE.PUBLIC SECTOR PARTNERSHIP (PPP) ON DESIGN,
BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS |
CA-VOL-I
CA-VOL-II
|
|
32 |
Gujarat
|
SIX/FOUR
LANING OF KM 198.000 TO KM 263.000 BHARUCH TO SURAT
SECTION OF NH 8 IN GUJARAT
ON BUILD , OPERATE AND TRANSFER (BOT) BASIS -
PACKAGE BOT 2 |
CA-VOL-I
CA-VOL-II
|
|
33 |
Gujarat
|
SIX
LANING OF SAMAKHIALI GANDHIDHAM SECTION OF N.H - 8 A
FROM KM 306.00 TO KM 362.16 (LENGTH KM 56.16) STATE
GUJARAT |
CA-VOL-I
|
|
34 |
Gujarat
|
SIX
LANING OF SURAT - DAHISAR SECTION OF NH - 8 FROM KM
263.00 TO KM 502.00 ( LENGTH - 239 KM ) IN THE STATE OF
GUJARAT AND MAHARASHTRA TO BE EXECUTED AS BOT (TOLL) ON
DBFO PATTERN
UNDER NHDP PHASE V |
CA-VOL-I
CA-VOL-II
|
| 35 |
Gujarat |
FOUR-LANNING
OF JETPUR-SOMNATH SECTION ( KM 0.000 TO 127.000 ) OF NH-8D IN
THE STATE OF GUJARAT TO EXECUTED AS BOT ( TOLL ) PROJECT ON
DBFO PATTERN UNDER NHDP PHASE III
|
CA-VOL-I
,
CA-VOL-II
CA-VOL-III
|
| 36 |
Gujarat |
DESIGN,ENGINEERING,CONTRUCTION,DEVELOPMENT,FINANCE,OPERATION
& MAINTENANCE OF KM 340.00 TO KM 264.00 ON PALANPUR-SWAROOPGANJ
SECTION ON NATIONAL HIGHWAY NO -14 ( NH-14 ) IN THE STATE OF
GUJARAT & RAJASTHAN |
CA-VOL-I |
|
37 |
Gujarat |
WIDENING
OF THE EXISTING JETPUR-GONDAL SECTION ( KM 117.0 TO KM 143.0 )
FROM TWO LANE TO FOUR LANE MAKING IM PROVEMENTS IN THE
EXISTING FOUR LANE GONDAL RAJKOT SECTION ( KM 143.0 TO KM
175.0 ) AND WIDENING OF THE EXISTING RAJKOT BYPASS ( KM 175.0
TO KM 185.0 ) FROM TWO LANE TO FOUR LANE NATIONAL HIGHWAYS
NO.8 ( NH-8B ) IN GUJARAT,INDIA ON BOT BASIS
|
CA-VOL-I
,
CA-VOL-II
|
|
38 |
Haryana |
FOUR LANING OF ROHTAK - PANIPAT SECTION OF NH 71A FROM KM 0.000 (KM 63.300 OF NH 10) TO KM 80.858 (KM 83.500 OF NH 1) IN THE STATES OF HARYANA UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS |
CA
|
|
39 |
Haryana |
DESIGN, ENGINEERING, FINANCE, CONSTRUCTION, OPERATION AND MAINTENANCE OF ZIRAKPUR - PARWANOO SECTION INCLUDING INJORE - KALKA - PARWANOO BYPASS ON NH 22 FROM KM 39.860 TO KM 67.000 IN THE STATES OF PUNJAB , HARYANA AND HIMACHAL PRADESH UNDER NHDP PHASE IIIA ON BUILD, OPERATE AND TRANSFER (BOT) BASIS |
CA-VOL-I
CA-VOL-II
CA-VOL-III
|
| 40 |
Haryana |
FOUR LANING OF ROHTAK - BAWAL SECTION OF NH 71 FROM KM 363.300 (DESIGN KM 363.300) TO 450.800 (DESIGN KM 445.853) IN THE STATE OF HARYANA UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS.
|
CA-VOL-I
CA-VOL-II
CA-VOL-III
|
|
41 |
Jammu
Kashmir |
REHABILATION,STRENGTHENING
AND FOUR LANNING OF SRINAGAR TO BANIHAL SECTION FROM KM
187.000 TO KM 189.350 ( BANIHAL BYPASS ) AND KM 220.700 TO KM
286.110 OF NH-1-A IN THE STATE OF JAMMU & KASHMIR (
PACKAGE NO.NHDP-PHASE-II/BOT/I/J&K ) |
CA-VOL-I
,
CA-VOL-II
CA-VOL-III
CA-VOL-IV
CA-VOL-V
|
|
42 |
Jammu & Kashmir |
REHABILITATION,STRENGTHENING AND FOUR LANING OF JAMMU TO UDHAMPUR SECTION FROM KM 15.000 ( JAMMU BYPASS) TO KM 67.00 OF NH-1-A IN THE STATE OF JAMMU & KASHMIR . |
CA-VOL-I
CA-VOL-II
CA-VOL-III
CA-VOL-IV
CA-VOL-V
CA-VOL-VI
|
|
43 |
Jammu & Kashmir |
REHABILITATION,STREGTHENING AND FOUR LANNING OF CHENNAI TO NASHRI SECTION OF NH-1A FROM KM 89.00 TO 130.00 ( NEW ALIGNMENT ) INCLUDING 9 KM LONG TUNNEL (2 LANE) WITH PARALLEL ESCAPE TUNNEL IN THE STATE OF JAMMU & KASHMIR.
|
CA-VOL-I
CA-VOL-II
CA-VOL-III
CA-VOL-IV
CA-VOL-V
|
|
44 |
Jammu & Kashmir |
REHABILITATION, STRENGTHENING AND FOUR LANING OF QUAZIGUND TO BANIHAL SECTION FROM KM 189.350 TO KM 204.700 OF NH - 1A, INCLUDING 2 - TUNNELS (2 LANE) OF 0.69 KM & 8.45 KM LENGTH ON NH - 1A, DBFOT (ANNUITY) BASIS, IN THE STATE OF JAMMU & KASHMIR |
CA-VOL-I
CA-VOL-II
CA-VOL-III
|
|
45 |
kerala |
DESIGN,ENGINERING,FINANCE,PROCUREMENT,CONSTRUCTION,OPERATION
AND MAINTENANCE OF 4 LANNING OF KANNUR-VENGALAM-KUTTIPURAM SECTION OF NH-17 (
PACKAGE-II ) FROM KM 230.00 TO KM 318.00 IN THE STATE OF KERALA ON DESIGN,
BUILD, FINANCE, OPERATE AND TRANSFER ( DBFOT ) (
TOLL ) BASIS UNDER NHDP PHASE-III |
CA |
|
46 |
kerala |
DESIGN,ENGINEERING,FINANCE,PROCUREMENT,CONSTRUCTION,OPERATION
AND MAINTENANCE OF 4 LANNING OF KANNUR-VENGALAM-KUTTIPURAM SECTION OF NH-17 (
PACKAGE I ) FROM KM 148.00 TO KM 230.00 IN THE OF KERALA ON DESIGN, BUILD,
FINANCE,OPERATE AND TRANSFER ( DBFOT ) (TOLL)
BASIS UNDER NHDP PHASE III |
CA |
|
47 |
kerala |
DESIGN,CONSTRUCTION,DEVELOPMENT,FINANCE,OPERATION
AND MAINTENANCE OF 6 LANNING OF VADAKANCHERY-THRISSUR SECTION OF NH-47 ( KM
240.00 TO 270.000 ) IN THE STATE OF KERALA ON DESIGN, BUILD,FINANCE,OPERATE
AND TRANSFER ( DBFOT ) BASIS |
CA |
|
48 |
kerala |
DESIGN,CONSTRUCTION,DEVELOPMENT,FINANCE,OPERATION
AND MAINTENANCE OF KM 270.00 ( THRISSUR ) TO KM 316.70 ( ANGAMALI )
IMPROVEMENT,OPERATION AND MAINTENANCE OF KM 316.700 ( ANGAMALI ) TO KM 342.00
( EDAPALLI ) ON NH-47 TOGETHER CALLED THE PROJECT IN THE STATE OF KERALA ON BUILD OPERATE & TRANSFER ( BOT )
BASIS |
CA |
|
49 |
karnataka |
FOUR LANNING OF
BELAGUM-KHANAPUR SECTION ( KM 0+000 TO KM 30+000 ) AND TWO LANNING WITH
LANNING WITH PAVED SHOULDERS OF KHANAPUR KARNATAKA/ GOA BORDER SECTION ( KM
30+000 TO KM 84+120 ) OF NH-4A IN THE STATE OF KARNATAKA UNDER NHDP PHASE-III
THROUGH PUBLIC PRIVATE PARTICIPATION ON DESIGN, BUILD,FINANCE, OPERATE AND TRANSFER ( DBFOT ) TOLL BASIS PROJECT |
CA-VOL-I
, CA-VOL-II |
|
50 |
karnataka |
FOUR LANNING OF
HUNGUND-HOSPET SECTION OH NH-13 FROM KM 202.000 TO KM 299.000 IN THE STATE OF
KARNATAKA ON DESIGN BUILD FINANCE OPERATE AND TRANSFER ( DBFOT ) BASIS UNDER
NHDP II |
CA-VOL-I
,
CA-VOL-II |
|
51 |
Karnataka
|
DESIGN, CONSTRUCTION, DEVELOPMENT, FINANCE, OPERATION AND MAINTENANCE OF KM 463.6 (AP/KARNATAKA BORDER) TO KM 524.0 ( AVATHI VILLAGE), COVERING 60.4 KMS AND IMPROVEMENT, OPERATION AND MAINTENANCE OF KM 524 (AVATHI VILLAGE) TO KM 527 ( NANDI HILLS CROSSING AND KM 535 (DEVANHALLI VILLAGE) TO KM 539 ( MEENUKUNTE VILLAGE) ON NH7 IN THE STATE OF KARNATAKA ON BUILD, OPERATE AND TRANSFER (BOT) ANNUITY BASIS. |
CA |
|
52 |
Karnataka
|
FOUR LANING KUNDAPUR SURATHKAL SECTION OF NH 17 AND MANGALORE - KERALA BORDER TOTAL LENGTH 90.08 IN THE STATE OF KARNATAKA UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (THE DBFOT) BASIS. |
CA-VOL-I
CA-VOL-II
|
|
53 |
Karnataka
|
FOUR LANING OF BIJAPUR HUNGUND SECTION OF NH - 13 FROM KM 102.000 TO KM 202.000 IN THE STATE OF KARNATAKA UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) TOLL BASIS.
|
CA-VOL-I
CA-VOL-II
|
|
54 |
Karnataka
|
FOUR LANING OF DEVIHALLI HASSAN SECTION FROM KM110.000 TO KM 189.500 OF NH 48 INCLUDING A NEW 2 LANE WITH PAVED SHOULDER BYPASS FOR CHANNARYANAPATNA TOWN AND WIDENING OF EXISTING HASSAN BYPASS TO 2 LANE WITH PAVED SHOULDER ON DBFOT BASIS IN THE STATE OF KARNATAKA UNDER NHDP PHASE
IIIA. |
CA
|
|
55 |
Karnataka
|
UPGRADATION, OPERATION AND MAINTENANCE OF KM 534.720 TO KM 556.840 OF HYDERABAD BANGALORE SECTION OF NH 7 IN KARNATAKA UNDER NHDP PHACE VII |
CA-VOL-I
CA-VOL-II
|
|
56 |
Karnataka
|
SIX LANING OF BELGAUM - DHARWAD SECTION OF NH 4 FROM KM 433.00 TO KM 515.00 (LENGTH - 79.36 KM ) IN THE STATE OF KARNATAKA TO BE EXECUTED AS BOT (TOLL) ON DBFO PATTERN UNDER NHDP PHASE - V
|
CA
|
|
57 |
Karnataka
|
SIX LANING OF TUMKUR- CHITRADURGA (EXCLUDING TUMKUR & CHITRADURGA BYPASSES) SECTION FROM KM 75.00 TO KM 189.00 OF NH 4 (APPROX. 114.00 KM ) IN THE STATE OF KARNATAKA TO BE EXECUTED AS BOT (TOLL) PROJECT ON DBFOT PATTERN UNDER NHDP PHASE V. |
CA-VOL-I
CA-VOL-II
|
|
58 |
Karnataka
|
DESIGN,ENGINEERING,CONSTRUCTION,DEVELOPMENT
,DEVELOPMENT,FINANCE OF NEELMANGALA-TUMKUR PROJECT FROM KM 29.500 TO KM.62.000 OF NH-4 STATE OF KARNATAKA |
CA-VOL-I
CA-VOL-II
|
|
59 |
Karnataka |
DESIGN,ENGINEERING,CONSTRUCTION,DEVELOPMENT
,FINANCE,OPERATION AND MAINTENANCE OF NEELMANGALA JUNCTION ON NH-4 EITH NH-48 DEVIHALLI FROM KM 28.200 TO KM 110.000 OF NH-48 IN THE STATE OF KARNATAKA UNDER NHDP PHASE IIIA ON BUILD OPERATE AND TRANSFER (BOT) BASIS |
CA-VOL-I
CA-VOL-II
|
|
60 |
Karnataka
|
INTERNATIONAL COMPETITIVE BIDDING UNDER SINGLE STAGE BIDING PROCESS FOR DESIGN ENGINEERING FINANCE CONSTRUCTION OPERATION AND MANITENENCE OF ACCESS CONTROLLED HIGHWAY PROJECT OF BANGLORE NEELMANGALA SECTION OF NH-4 FROM KM 10.000 TO KM 29.5000 IN THE STSTE OF KARNATAKA OF BUILD OPERATE AND TRANSFER (BOT) BASIS II-IV TO IV-IV |
CA-VOL-I
CA-VOL-II |
|
61 |
Karnataka |
CONSTRUCTION OF ELEVATED
HIGHWAY PROJECT FROM SILK BOARD JUNCTION TO ELECTRONIC CITY JUNCTION ( KM.8.765 TO KM.18.750) SECTION OF NH-7 ON BUILD,OPERATE AND TRANSFER (BOT) BASIS
|
CA |
|
62 |
Madhya Pradesh |
DESIGN,CONSTRUCTION,DEVELOPMENT,FINANCE,OPERATION
AND MAINTENANCE OF KM 16.00 TO KM 96.127 ON NATIONAL HIGHWAY-75 ( NH-75 ) IN
THE STATES OF UTTAR PRADESH AND MADHYA PRADESH |
CA-VOL-I
,
CA-VOL-II
CA-VOL-III
CA-VOL-IV
CA-VOL-V
|
|
63 |
Madhya Pradesh |
| 2 LANE WITH PAVED SHOULDERS OF
BHOPAL SANCHI SECTION FROM KM 0.00 TO KM 53.775 OF NH 86
EXTN TO BE EXECUTED AS BOT (ANNUITY) PROJECT ON DBFO
PATTERN UNDER NHDP PHASE III IN THE STATE OF MADHYA
PRADESH | |
CA |
|
64 |
Madhya Pradesh |
| IMPROVEMENT, OPERATION AND
MAINTENANCE INCLUDING STRENGTHENING AND WIDENING OF
EXISTING 2 LANE ROAD TO 4 LANE DUAL CARRIAGEWAY FROM KM
12.600 - KM 84.700 OF NH - 3 (INDORE - KHALIGHAT
SECTION) IN THE STATE OF MADHYA PRADESH ON BUILD,
OPERATE AND TRANSFER (BOT)
BASIS | |
CA-VOL-I
CA-VOL-I
|
|
65 |
Madhya Pradesh |
| Design, Construction, Finance,
Operation & Maintenance of khalghat - MP /
Maharashtra border section on NH 3 from KM 84.700 to KM
167.500 in Madhya Pradesh under NHDP phase III on BOT
Basis | |
CA |
|
66 |
Madhya Pradesh |
| CONSTRUCTION, OPERATION AND
MAINTENANCE OF A NEW 2-LANE ROAD FROM KM 319.700 - KM
332.100 OF NH 3 (GUNA - BYPASS SECTION) IN THE STATE OF
MADHYA PRADESH | |
CA |
|
67 |
Madhya Pradesh |
| DESIGN, ENGINEERING,
CONSTRUCTION, DEVELOPMENT, FINANCE, OPERATION AND
MAINTENANCE OF INDORE TO GUJRAT-MP BORDER SECTION OF NH
- 59 (KM 9.500 TO KM 171.100) IN THE STATE MADHYA
PRADESH UNDER NHDP PHASE III ON BUILD, OPERATE AND
TRANSFER (BOT) ( DBFOT) BASIS | |
CA |
|
68 |
Madhya Pradesh |
| SIX LANING OF INDORE - DEWAS
SECTION OF NH - 3 FROM KM 577.550 TO KM 610.000 AND KM
0.000 TO KM 12.600 ( APPROX. LENGTH 45.05 KM )IN THE
STATE OF MADHYA PRADESH UNDER NHDP PHASE V TO BE EXECUTED
AS BOT (TOLL) PROJECT ON DESIGN, BUILD, FINANCE, OPERATE
AND TRANSFER "DBFOT" PATTERN | |
CA |
|
69 |
Madhya Pradesh |
DESIGN,CONSTRUC TION,DEVELOPMENT,FINANCE,OPERATION AND MAINTENANCE OF KM 547.400 TO KM 596.750 ON NATIONAL HIGHWAY NO.7 NH-7 IN THE STATE OF MADHYA PRADESH ( PACKAGE NO:NS1/BOT/MP-2) |
CA |
|
70 |
Madhya Pradesh |
DESIGN,CONTRUCTION,DEVELOPMENT,FINANCE,OPERATION AND MAINTENANCE OF KM 596.750 TO KM 653.225 ON NATIONAL HIGHWAY NO.7 (NH-7) IN THE STATE OF MADHYA PRADESH |
CA |
|
71 |
Madhya Pradesh |
CONSTRUCTION, MAINTENANCE & OPERATION OF DURG BYPASS ON NH 6 IN MADHYA PRADESH ON BOT BASIS |
CA |
|
72 |
Madhya Pradesh |
DESIGN, CONSTRUCTION, DEVELOPMENT, FINANCE, OPERATION AND MAINTENANCE OF THE WORK OF CONSTRUCTION OF NEW FOUR LANE GWALIOR BYPASS OF THE LENGTH 42.033 KM FROM KM 103.00 OF NH 2 TO KM 16.00 ON NH 75 IN THE STATE OF MADHYA PRADESH |
CA |
|
73 |
Madhya Pradesh |
DESIGN, ENGINEERING, FINANCE, CONSTRUCTION, OPERATION AND MAINTENANCE OF END OF DURG BYPASS -
CHATTISGARH/MAHARASHTRA BORDER SECTION FROM KM 322.400 TO KM 405.000OF NH 6 UNDER NHDP PHASE IIIA ON BUILD, OPERATE AND TRANSFER (BOT) BASIS |
CA-VOL-I
CA-VOL-II
|
|
74 |
Madhya Pradesh |
IMPROVEMENT, OPERATION, MAINTENANCE, REHABILITATION AND STRENGHTENING OF EXISTING 2 LANE ROAD AND WIDENING TO 4 LANE DIVIDED HIGHWAY FROM KM 239.000 TO 281.000 OF NH 6 (RAIPUR - AURANG SECTION) ON BUILD , OPERATE AND TRANSFER (BOT) BASIS |
CA-VOL-I
|
|
75 |
Maharashtra |
DESIGN ENGINEERING
FINANCE CONSTRUCTION DEVELOPMENT,OPERATION AND MAINTENANCE OF
6 LANING OF PIMPALGAON-NASHIK-GONDE SECTION OH NH-3 FROM KM
380.00 TO KM 440.00 IN THE STATE OF MAHARASHTRA UNDER NHDP
PHASE III ON DESIGN BUILD FINANCE OPERATE AND TRANSFER . |
CA-VOL-I
CA-VOL-II
CA-VOL-III
|
|
76 |
Maharashtra |
DESIGN
ENGINEERING ,FINANCE,CONSTRUCTION,OPERATION AND MAINTENANCE OF
CHATTISGARH MAHARASHTRA BORDER- WAIGANGA BRIDGE SECTION FROM
KM 405.000 TO KM 485.00 OF NH-6 IN THE STATE OF MAHARASHTRA
UNDER NHDP PHASE IIIA ON BUILD OPERATE AND TRANSFER (BOT)
BASISOf Nh-6 in the State Of Maharashtra
Under NHDP Phase IIIA on build Operate and Transfer (BOT)
Basis |
CA-VOL-I
CA-VOL-II
|
|
77 |
Maharashtra |
DESIGN,ENGINEERING,FINANCE,CONSTRUCTION,OPERATION
AND MAINTENANCE OF END OF DURG BYPASS-CHATTISGARH/MAHARASHTRA
BORDER SECTION FROM KM 322.400 TO KM 405.00 OF NH-6 UNDER NHDP
PHASE IIIA ON BUILD, OPERATE AND TRANSFER (BOT) BASIS. |
CA-VOL-I
CA-VOL-II
|
|
78 |
Maharashtra |
FOUR LANNING NAGPUR-SAONER-BETUL,SECTION OF NH-69 FROM KM.3.000 TO 59.30 IN THE STATE OF MAHARASHTRA AND KM .137.00 TO KM.257.400 IN THE STATE OF MADHYA PRADESH ON DBFOT ( ANNUITY) BASIS PROJECT.
|
CA-VOL-I
CA-VOL-II
CA-VOL-III
|
|
79 |
Maharashtra |
IMPROVEMENT,OPERATION AND MAINTENANCE
REHABILITATION AND STRENGTHENING OF EXISTING 2-LANE ROAD AND
WIDENING TO-4 LANE DIVIDED HIGHWAY FROM KM.380.00 TO KM.265.00
OF NH-3 ( PIMPALGAON -DHULE SECTION) IN THE STATE MAHARASHTRA
ON BUILD, OPERATE & TRANSFER (BOT) BASIS. |
CA-VOL-I
CA-VOL-II
CA-VOL-III
|
|
80 |
Maharashtra |
SIX LANING OF PUNE-SATARA
SECTION OF NH-4 FROM KM. 725.000 TO 865.350 ( LENGTH -140.350
KM) IN THE STATE OF MAHARASHTRA TO BE EXCUTED AS BOT (TOLL) ON
DBFO PATTERN UNDER NHDP PHASE-V ( PACKAGE NO. NHDP-V/MC-II/14). |
CA-VOL-I
CA-VOL-II
CA-VOL-III
|
|
81 |
Maharashtra |
DESIGN,
ENGINEERING,FINANANCE,CONSTRUCTION OPERATION AND MAINTENANCE
OF 4 LANINNG OF PUNE - SOLAPUR SECTION OF NH-9 FROM KM.40.000
TO KM 144.400 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE-III
ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS. |
CA-VOL-I
CA-VOL-II
CA-VOL-II
|
|
82 |
Maharashtra |
DESIGN,
ENGINEERING,FINANANCE,PROCUREMENT, CONSTRUCTION,OPERATION AND
MAINTENANCE OF THE 4 LANNING OF TALEGAON-AMRAVATI SECTION OF
NH-6 FROM KM 100.00 TO KM 166.725 IN THE STATE OF MAHARASHTRA
UNDER NHDP PHASE III ON DESIGN,BUILD,FINANCE,OPERATE &
TRANSFER (BOT) BASIS. |
CA-VOL-I
CA-VOL-II
|
|
83 |
Maharashtra |
IMPROVEMENT, OPERATION AND MAINTENANCE INCLUDING STRENGTHENING AND WIDEING OF EXISTING 2 LANE ROAD TO 4 LANE DUAL CARRIAGEWAY FROM KM 50.000 TO 100.000OF NH 6 (KONDHALI - TALEGAON SECTION) IN THE STATE OF MAHARASHTRA ON BUILD, OPERATE AND TRANSFER (BOT) BASIS |
CA-VOL-I
|
|
84 |
Maharashtra |
4 LANE VADAPE GONDE SECTION IN THE STATE OF MAHARASHTRA |
CA-VOL-I
CA-VOL-II
|
|
85 |
Maharashtra |
4 LANE VADAPE GONDE SECTION IN THE STATE OF MAHARASHTRA |
CA-VOL-I
CA-VOL-II
|
|
86 |
Maharashtra |
DESIGN, ENGINEERING, CONSTRUCTION, DEVEOLPMENT, FINANCE, OPERATION AND MAINTENANCEOF 4 LANING OF PUNE - SOLAPUR SECTION OF NH 9 FROM KM 144.400 TO KM 249.000 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS |
CA-VOL-I
CA-VOL-II
|
|
87 |
Maharashtra |
OPERATION AND MAINTENANCE OF OF THE FOUR LANING OF GOA (KARNATAKA BORDER TO PANAJI GOA |
CA-VOL-I
CA-VOL-II
|
|
88 |
Maharashtra |
SECTION OF NH - 4A IN THE STATE OF GOA STRENGTHENING OF EXISTING 2 LANES FROM KM 592/240 TO KM 725 ON THE SATARA KAGAL SECTION OF THE NATIONAL HIGHWAY NO.4 (NH 4) IN THE STATE OF MAHARASHTRA |
CA-VOL-I
|
|
89 |
Maharashtra |
IMROVEMENT, OPERATION AND MAINTENANCE INCLUDING STRENGTHENING AND WIDENING OF EXISTING 2 LANE ROAD TO 4 LANE DUAL CARRIAGEWAY FROM KM 9.200 - KM 50.000 OF NH - 6 (NAGPUR - KONDHALI SECTION) IN THE STATE OF MAHARASHTRA BUILD, OPERATE AND TRANSFER (BOT) BASIS |
CA-VOL-I
CA-VOL-II
|
|
90 |
Maharashtra |
DESIGN, ENGINEERING, FINANCE, CONSTRUCTION, DEVEOLPMENT, OPERATION AND MAINTENANCE OF THE 4 LANING MP/MAHARASHTRA BORDER - DHULE SECTION ON NH - 3 FROM KM 168.500 TO KM 265.000 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS |
CA-VOL-I
CA-VOL-II
CA-VOL-III
|
| 91 |
Maharashtra |
4 LANING OF MADHYA PRADESH / MAHARASHTRA BORDER - NAGPUR SECTION OF NH 7 FROM KM 652.000 (NEW KM 653.225) TO KM 729.000 INCLUDING CONSTRUCTION OF KAMPTEE-KANHAN AND NAGPUR BYPASS AND MAINTENANCE OF ALREADY 4 LANED SECTION FROM KM 14.585 TO KM 36.6000 OF NH 7 (NAGPUR - HYDERABAD SECTION) IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE II ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS |
CA-VOL-I
CA-VOL-II
CA-VOL-III
|
|
92 |
Maharashtra |
FOUR
LANNING OF PANVEL-INDAPUR SECTION NH-17 FROM KM 0.000 TO KM
84.000 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE III ON BOT
BASISI ( PACKAGE NO NHDP-III/DL4/05 ) |
CA-VOL-I,
CA-VOL-II
CA-VOL-III
|
|
93 |
Orissa |
Four Laning
of Rimuli-Roxy-Rajamunda section of NH - 215 from KM.163.00 to
KM.269.00 in the State of Orissa to be executed as BOT (Toll)
on DBFOT pattern under NHDP Phase III. |
CA-VOL-I
CA-VOL-II
|
|
94 |
Orissa |
Four Laning
of Bhubaneshwar - Puri Section of NH - 203 from KM.0.00 to
KM.59.00 in the State of Orissa to be executed as BOT (Toll)on
DBFOT pattern under NHDP Phase III. |
CA-VOL-I
, CA-VOL-II
|
|
95 |
Orissa |
Four Laning of
Sambalpur - Baragarh - Orissa/Chhatisgarh border section of
NH.6 from KM.0.00 to KM.88.00 in the State of Orissa to be
executed as BOT (Toll) on DBFOT pattern under NHDP Phase
III. |
CA-VOL-I
, CA-VOL-II
|
|
96 |
Orissa |
Six Laning of
Chandikole-Jagatpur-Bhubaneshwar section of NH.5 from
KM.413.00 to KM.418.00 and from KM.0.000 to KM.62.000 in the
State of Orissa as BOT (Toll) on DBFO patter under NHDP Phase
V. |
CA-VOL-I
, CA-VOL-II
|
|
97 |
Punjab
|
IMPROVEMENT, OPERATION AND MAINTENANCE INCLUDING STRENGTHENING AND WIDENING OF EXISTING 2 LANE ROAD TO 4 LANE DUEL CARRIAGEWAY FROM KM 407.100 TO KM 456.100 OF NH 1 (JALANDHAR - AMRITSAR SECTION) IN THE STATE OF PUNJAB ON BUILD, OPERATE AND TRANSFER (BOT) BASIS |
CA-VOL-I
CA-VOL-II
|
|
98. |
Punjab
|
WIDENING OF EXISTING 4 LANE PORTION FROM KM 86 TO KM 96, COVERING PANIPAT CITY, ON NATIONAL HIGHWAY NO.1 (NH1) IN HARYANA, TO 6 LANE ELEVATED STRUCTION COVERING GOHANA ROAD, SANAULI ROAD, ASSANDH ROAD CROSSING, CITY BUS STAND AND SKYLARK TOURIST COMPLEX AND WIDENING AND CONSTRUCTION OF PERIPHERAL LANES. |
CA |
|
99. |
Punjab
|
IMPROVEMENT, OPERATION AND MAINTENANCE INCLUDING STRENGTHENING AND WIDENING OF EXISTING 2 LANE ROAD TO 4 LANE DUAL CARRIAGEWAY FROM 1) KM 5+735 - KM 39+960 ON NH 22 AND II ) KM 0+000 - KM 0+871 ON NH21 (AMBALA - CHANDIGARH SECTION ) IN THE STATES OF HARYANA & PUNJAB ON BUILD, OPERATE AND TRANSFER (BOT) BASIS |
CA-I
CA-II
|
|
100. |
Punjab
|
FOUR LANING OF LUDHIANA TO TALWANDI SECTION OF NH 95 FROM KM 92.000 TO KM 170.000 (LENGTH - 78.00KM) IN THE STATE OF PUNJAB TO BE EXECUTED ON BOT(TOLL) ON DBFOT BASIS UNDER NHDP PHASE III |
CA-VOL-I
CA-VOL-II
|
|
101 |
Punjab
|
DESIGN, ENGINEERING, FINANCE, CONSTRUCTION, OPERATION AND MAINTENANCE OF KURALI - KIRATPUR SECTION FROM KM 28.600 TO KM 73.200 OF NH 21 IN THE STATE OF PUNJAB UNDER NHDP PHASE IIIA ON BUILD, OPERATE AND TRANSFER (BOT) BASIS |
CA-VOL-I
CA-VOL-II
CA-VOL-III
|
|
102 |
Punjab
|
DESIGN, ENGINEERING, FINANCE, CONSTRUCTION, OPERATION AND MAINTENANCE OF ZIRAKPUR - PARWANOO SECTION INCLUDING INJORE - KALKA - PARWANOO BYPASS ON NH 22 FROM KM 39.860 TO KM 67.000 IN THE STATES OF PUNJAB , HARYANA AND HIMACHAL PRADESH UNDER NHDP PHASE IIIA ON BUILD, OPERATE AND TRANSFER (BOT) BASIS |
CA-VOL-I
CA-VOL-II
CA-VOL-III
|
|
103 |
Punjab
|
DESIGN, ENGINEERING, FINANCE, CONSTRUCTION, OPERATION AND MAINTENANCE OF PATHANKOT - AMRITSAR SECTION OF NH 15 FROM KM 6.082 TO KM 108.502 IN THE STATE OF PUNJAB UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS |
CA-VOL-I
CA-VOL-II
|
|
104 |
Punjab
|
SIX LANING OF PANIPAT - JALANDHAR SECTION OF NH 1 FROM KM 96.00 TO KM 387.10 (LENGTH - 291.10 KM) IN THE STATE OF HARYANA AND PUNJAB TO BE EXECUTED AS BOT (TOLL) ON DBFO PATTERN UNDER NHDP PHASE V |
CA-VOL-I
CA-VOL-II
|
|
105. |
Punjab |
DESIGN, ENGINEERING, FINANCE, CONSTRUCTION, OPERATION AND MAINTENANCE OF AMRITSAR - WAGAH BORDER SECTION OF NH 1 FROM KM 455.400 TO KM 491.620 IN THE STATE OF PUNJAB UNDER NHDP PHASE IIIA ON BOT (ANNUITY) BASIS |
CA-VOL-I
CA-VOL-II
CA-VOL-III
|
|
106 |
Rajasthan
|
WIDENING
OF EXISTING 2 LANES TO 6 LANES DIVIDED CARRIAGEWAY
FACILITY INCLUDING REHABILITATION OF EXISTING 2 LANES
FROM KM 273.500 TO KM 363.885 ON JAIPUR - KISHANGARH
SECTION OF NH -
8 IN RAJASTHAN |
CA |
|
107 |
Rajasthan
|
IMPROVEMENT,
OPERATION AND MAINTENANCE INCLUDING STRENGTHENING AND
WIDENING OF EXISTING 2 LANE ROAD TO 4 LANE DUAL
CARRIAGEWAY FROM KM 17.756 - KM 62.295 OF NH - 11 (AGRA
- BHARATPUR SECTION) IN THE STATES OF UTTAR PRADESH
& RAJASTHAN ON BUILD, OPERATE AND TRANSFER (BOT)
BASIS |
CA |
|
108 |
Rajasthan
|
IMPROVEMENT,
OPEARATION AND MAINTENANCE OF REHABILITATION AND
STRENGTHENING OF EXISTING 2 LANE
ROAD AND WIDENING TO 4 LANE DIVIDED HIGHWAY
OF MAHUA - JAIPUR SECTION OF NATIONAL HIGHWAY
- 11 (NH 11) FROM KM 120.000 TO KM 228.000
IN THE STATE OF RAJASTHAN ON BUILD, OPERATE AND
TRANSFER (BOT) BASIS UNDER NHDP PHASE IIIA |
CA |
|
109 |
Rajasthan
|
DESIGN,
ENGINEERING, CONSTRUCTION, DEVELOPMENT, FINANCE,
OPERATION AND MAINTENANCE OF FOUR LANING OF DEOLI-KOTA
SECTION OF NH 12 FROM KM 165.00 TO JUNCTION OF NH
- 76 ON KOTA BYPASS (APPROX LENGTH 83.04KM) IN THE
STATE OF RAJASTHAN ON BOT (TOLL) PROJECT , ON
DBFOT PATTERN
UNDER NHDP PHASE III |
CA-VOL-I
CA-VOL-II
|
|
110 |
Rajasthan
|
DESIGN,
ENGINEERING, CONSTRUCTION, DEVEOLPMENT, FINANCE,
OPERATION AND MAINTENANCE OF JAIPUR TO REENGUS
SECTION OF NH - 11 (KM 246.300 TO KM 298.075) IN
THE STATE OF RAJSTHAN UNDER NHDP PHASE III ON
DESIGN , BUILD , FINANCE, OPERATE AND TRANSFER
(DBFOT) BASIS |
CA-VOL-I
CA-VOL-II
|
|
111 |
Rajasthan
|
SIX
LANING OF THE EXISTING ROAD FROM KM 364.125 TO KM
58.245 (APPROX. 93.56 KM ) ON THE KISHANGARH -
AJMER - BEAWAR
SECTION OF NH 8 IN THE STATE OF RAJASTHAN BY
BUILD, FINANCE, OPERATE AND TRANSFER ( DBFOT)
BASIS |
CA-VOL-I
CA-VOL-II
|
|
112 |
Rajasthan
|
SIX
LANING OF GURGAON - KOTPUTLI - JAIPUR SECTION OF
NH 8 FROM KM 42.70 TO KM 273.00 IN THE STATE OF
HARYANA AND RAJASTHAN TO BE EXECUTED AS BOT(TOLL)
ON DBFO PATTERN UNDER PATTERN UNDER NHDP PHASE V |
CA-VOL-I
CA-VOL-II
|
|
113 |
Rajasthan
|
SIX
LANING OF KM 108.700 TO KM 192.000 VADODARA TO
BHARUCH SECTION OF NH 8 IN GUJARAT ON BUILD ,
OPERATE AND TRANSFER (BOT) BASIS - PACKAGE BOT-1 |
CA-VOL-I
|
|
114 |
Rajasthan
|
DESIGN, ENGINEERING, CONSTRUCTION, DEVEOLPMENT, FINANCE, OPERATION AND MAINTENANCE OF JAIPUR TO DEOLI SECTION OF NH 12 (KM 18.700 TO 165.000) IN THE STATE OF RAJASTHAN UNDER NHDP PHASE III ON DESIGN , BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS |
CA-VOL-I
CA-VOL-II
|
|
115 |
Rajasthan
|
IMPROVEMENT, OPERATION AND MAINTENANCE OF
REHABILITATION AND STRENGTHENING OF EXISTING 2-LANE ROAD AND
WIDENING TO 4-LANE DIVIDED HIGHWAY OF KM 63.000 TO KM 120.000
OF NH-11 (BHARATPUR-MAHUA SECTION) IN THE STATE OF RAJASTHAN
ON BUILD,OPERATE AND TRANSFER(BOT) BASIS UNDER NHDP PHASE-III
A
|
CA-VOL-I-1
CA-VOL-I-2
CA-VOL-II-1
CA-VOL-II-2
CA-VOL-II-3
CA-VOL-II-4
CA-VOL-II-5
CA-VOL-II-6
CA-VOL-II-7
CA-VOL-II-8
CA-VOL-II-9
CA-VOL-II-10
CA-VOL-II-11
CA-VOL-II-12
CA-VOL-II-13
CA-VOL-II-14
CA-VOL-II-15
CA-VOL-II-16
CA-VOL-II-17
CA-VOL-II-18
CA-VOL-II-19
CA-VOL-II-20
CA-VOL-II-21
CA-VOL-II-22
CA-VOL-II-23
CA-VOL-II-24
CA-VOL-II-25
|
|
116 |
Tamil Nadu |
DESIGN,ENGINEERING,CONSTRUCTION,DEVELOPMENT,FINANCE,OPERATION
AND MAINTENANCE OF 4 LANNING THE EXISTING 2 LANE SECTION FROM KM 285 ( NEAR
PADALUR ) TO KM 325 ( NEAR TRICHY ) ON NH-45 IN THE STATE OF TAMILNADU ON
BUILD OPERATE TRANSFER ( BOT ) BASIS |
CA-VOL-I
|
|
117 |
Tamil Nadu |
TWO LANNING WITH
PAVED SHOULDER OF DINDIGUL-THENI SECTION KM 2.750 TO KM 73.400 OF NH-45 (
EXTN ) AND THENI-KUMILI SECTION FROM KM 215.500 TO KM 273.600 OF NH-220 IN
THE STATE OF TAMILNADU UNDER NHDP PHASE-III ON DESIGN,BUILD,FINANCE,OPERATE
AND TRANSFER (DBFOT) ANNUITY BASIS |
CA-VOL-I
CA-VOL-II
|
|
118 |
Tamil
Nadu/Andhra Pradesh |
FOUR LANNING OF
TIRUPATI-TIRUPATI-CHENNAI SECTION OF NH-205 FROM KM 274.800 TO KM 341.600 IN
THE STATE OF ANDHRA PRADESH AND FROM KM 0.00 TO KM 59.600 IN THE STATE OF
TAMIL NADU ON DESIGN BUILD,FINANCE,OPERATE AND TRANSFER ( DBFOT ) TOLL BASIS |
CA-VOL-I
, CA-VOL-II |
|
119 |
Tamil Nadu |
DESIGN,ENGINEERING,FINANCE,CONSTRUCTION,OPERATION
AND MAINTENANCE OF PONDICHERRY-TINDIVANAM SECTION FROM KM 0.000 TO KM 37.920
OF NH-66 IN THE STATE OF TAMILNADU UNDER NHDP PHASE III A ON BUILD,OPERATE
AND TRANSFER ( BOT ) BASIS |
CA-VOL-I
CA-VOL-II
CA-VOL-IV Drawings |
|
120 |
Tamil Nadu |
SIX LANNING OF
HOSUR-KRISHNAGIRI SECTION OF NH-7 FROM KM 33.130 TO KM 93.000 ( LENGTH-KM
59.87 ) IN THE STATE OF TAMIL NADU UNDER NHDP PHASE V AS BOT ( TOLL ) ON DBFO
PATTERN |
CA-VOL-I
|
|
121 |
Tamil Nadu |
SIX LANNING OF
KRISHNAGIRI-WALAJAPHET SECTION OF NH-46 FROM KM 0.000 TO KM 148.3000 ( LENGTH
148.3000 ) IN THE STATE OF TAMIL NADU UNDER NHDP PHASE-V TO BE EXECUTED AS
BOT ( TOLL ) PROJECT ON DBFO PATTERN |
CA-VOL-I
|
|
122 |
Tamil Nadu |
DESIGN,ENGINEERING,FINANCE,CONSTRUCTION,OPERATION
AND MAINTENANCE OF THANJAVUR-TRICHY SECTION FROM KM 80.000 TO KM 135.750 OF
NH-67 IN THE STATE OF TAMILNADU UNDER NHDP PHASE IIIA ON BUILD,OPERATE AND
TRANSFER (BOT) BASIS |
CA-VOL-I
, CA-VOL-II |
|
123 |
Tamil Nadu |
SIX LANNING FROM
KM 102.035 TO KM 144.680 ON THE CHENGAPALI TO START COIMBATORE BYPASS AND
FOUR LANNING FROM KM 170.880 TO KM 183.010 ON END OF COIMBATORE BYPASS TO TN/KERALA BORDER SECTION OF NH-47 IN THE STATE OF TAMIL NADU NHDP PHASE-II ON
DBFOT ( TOLL ) BASIS ( PACKAGE NO NS-II/BOT/TN-8) |
CA-VOL-I
|
|
124 |
Tamil Nadu |
TWO LANNING OF
TRICHY-KARAIKUDI-INCLIDING TRICHY BYPASS ROAD SECTION OF NH-210 FROM ( K
10.00 TO KM 94.00 ) AND BYPASS ( KM 110.016 TO KM 135.930 ) IN THE STATE OF
TAMIL NADU UNDER NHDP III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (
DBFOT ) ANNUITY BASIS |
CA-VOL-I
CA-VOL-II
|
|
125 |
Tamil Nadu |
DESIGN,ENGINEERING,FINANCE,CONSTRCTION,OPERATION
AND MAINTENANCE OF TRICHY-DINDIGUL SECTION FROM KM 333.000 TO KM 421.600 OF
NH-45 IN THE STATE OF TAMILNADU UNDER NHDP PHASE IIIA ON BUILD, OPERATE AND
TRANSFER ( BOT ) BASIS |
CA-VOL-I
CA-VOL-II
|
|
126 |
Tamil Nadu |
DESIGN,ENGINEERING,FINANCE
CONSTRUCTION,OPERATION AND MAINTENANCE OF TRICHY-KARUR SECTION FROM
KM.135.800 ( EXCLUDING LALAPET ROB ) TO KM 218.000 OF NH-67 IN THE STATE OF TAMILNADU UNDER NHDP PHASE
IIIA ON BUILD,OPERATE AND TRANSFER ( BOT ) BASIS |
CA-VOL-I
, CA-VOL-II,
CA-VOL-III |
|
127 |
Tamil Nadu |
DESIGN,,ENGINEERING,CONSTRUCTION,DEVELOPMENT,FINANCE,OPERATION
AND MAINTENANCE OF 4 LANNING THE EXISTING 2 LANE SECTION FROM KM 192.25 (
NEAR ULUNDURPET ) TO KM 285.00 ( NEAR PADALUR ) OF NH-45 IN THE STATE OF
TAMILNADU ON BUILD OPERATE TRANSFER ( BOT ) BASIS |
CA-VOL-I
|
|
128 |
Tamil Nadu |
DESIGN,ENGINEERING,FINANCE,CONSTRUCTION,OPERATION
AND MAINTENANCE OF SALEM-ULUNDURPET SECTION FROM KM 0.313 TO KM 136.670 OF
NH-68 IN THE STATE OF TAMILNADU UNDER NHDP PHASE IIIA ON BUILD,OPERATE AND
TRANSFER ( BOT ) BASIS |
CA-VOL-I
, CA-VOL-II,
CA-VOL-III |
|
129 |
Tamil Nadu |
DESIGN,CONSTRUCTION,FINANCE,OPERATION
AND MAINTENANCE OF KM 94.00 ( END OF PROPOSED KRISHNAGIRI FLYOVER ) TO KM 156
( THUKPIPADI ) AND IMPROVEMENT OPERATION AND MAINTENANCE FROM KM 156 (
THUMPIPADI ) TO KM 163.4 ( THOPURGHAT ) ON NH-7 IN THE STATE OF TAMIL NADU |
CA-VOL-I
CA-VOL-II
CA-VOL-III
CA-VOL-IV
CA-VOL-V
CA-VOL-VI
CA-VOL-VII
CA-VOL-VIII
CA-VOL-IX
CA-VOL-X
CA-VOL-XI
CA-VOL-XII
CA-VOL-XIII |
|
130 |
Tamil Nadu |
DESIGN,CONSTRUCTION,DEVELOPMENT,FINANCE
OPERATION AND MAINTENANCE OF KM 305.600 ( END OF KARUR BYPASS ) TO KM 373.725 ( DINDIGUL ) AND IMPROVEMENT OPERATION AND
MAINTENANCE OF KM 292.600 ( START OF KARUR BYPASS ) ON NH-7 IN THE STATE OF
TAMILNADU UNDER NORTH-SOUTH CORRIDOR ( NHDP PHASE
II ) ON BUILD OPERATE AND TRANSFER (BOT) BASIS |
CA-VOL-I
CA-VOL-II
CA-VOL-III
CA-VOL-IV
CA-VOL-V
CA-VOL-VICA-VOL-VII |
|
131 |
Tamil Nadu |
DESIGN,CONSTRUCTION,DEVELOPMENT,FINANCE,OPERATION
AND MAINTENANCE OF KM 53.00 ( KUMARPALYAM ) TO KM 100 ( AFTER CHENGAPALI ) ON NH-47 IN THE STATE OF TAMILNADU ON
BUILD OPERATE AND TRANSFER ( BOT ) BASIS |
CA-VOL-I
, CA-VOL-II
CA-VOL-III
CA-VOL-V
CA-VOL-VI
CA-VOL-VII
|
|
132 |
Tamil Nadu |
CONSULTANCY
SERVICES FOR THE PREPERATION OF FEASIBILITY STUDY AND DETAILED PROJECT REPORT
FOR FOUR/SIX LANNING OF SALEM KARUR ( NH-7 ) IN TAMILNADU |
CA-VOL-1
CA-VOL-II
CA-VOL-II
CA-VOL-IV
CA-VOL-V
CA-VOL-VI
|
| 133 |
Tamil Nadu |
DESIGN,CONSTRUCTION,DEVELOPMENT,FINANCE,OPERATION
AND MAINTENANCE OF KM 207.050 ( SALEM ) TO KM 248.625 ( START OF PROPOSED
FLYOVER ON NAMAKKAL BYPASS ) AND IMPROVEMENT,OPERATION AND MAINTENANCE OF KM
199.2 ( START OF SALEM BYPASS ON NH-7 0 TO KM 207.050
( SALEM ) ON NH-7 IN THE STATE OF TAMIL NADU UNDER NORTH-SOUTH CORRIDOR ( NHDP PHASE II ) ON BUILD, OPERATE AND
TRANSFER (BOT) BASIS |
CA-VOL-I
CA-VOL-II
CA-VOL-III
CA-VOL-IV
CA-VOL-V
CA-VOL-VI
CA-VOL-VII
CA-VOL-VIII
CA-VOL-VIIII
CA-VOLL-X
CA-VOL-XI
CA-VOL-XII
|
|
134 |
Tamil Nadu |
DESIGN,CONSTRUCTION,DEVELOPMENT,FINANCE,OPERATION
AND MAINTENANCE OF KM 203.96 ON NH-7 0.00 ( SALEM ) TO KM 53.00 ( KUMARPALYAM
) ON NH-47 IN THE STATE OF TAMILNADU ON BUILD, OPERATE AND TRANSFER 9 BOT )
BASIS |
CA-VOL-I
CA-VOL-II
CA-VOL-III
CA-VOL-IV
CA-VOL-V
CA-VOL-VII
|
|
135 |
Tamil
Nadu |
DESIGN,CONSTRUCTION,DEVELOPMENT,FINANCE,OPERATION
AND MAINTENANCE OF KM 373.275 ( START OF PROPOSED FLYOVER AT
DINDIGUL BYPASS ) TO KM 426.6 ( SAMYANALOORE ) ON NH-7 IN THE
STATE OF TAMILNADU ON BUILD OPERATE & TRANSFER ( BOT )
BASIS |
CA-VOL-I
,
CA-VOL-II
CA-VOL-III
CA-VOL-IV
CA-VOL-V
|
|
136 |
Uttar Pradesh |
| IMPROVEMENT, OPERATION AND
MAINTENANCE INCLUDING STRENGTHENING AND WIDENING OF
EXISTING 2 LANE ROAD TO 4 LANE DUAL CARRIAGEWAY FROM KM
17.756 - KM 62.295 OF NH - 11 (AGRA - BHARATPUR SECTION)
IN THE STATES OF UTTAR PRADESH & RAJASTHAN ON BUILD,
OPERATE AND TRANSFER (BOT)
BASIS | |
CA-VOL-I
CA-VOL-II
|
|
137 |
Uttar Pradesh |
TWO LANING WITH PAVED SHOULDERS OF AGRA - ALIGARH SECTION OF NH - 93 FROM KM 0.000 TO KM 79.000 IN THE STATE OF UTTAR PRADESH ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS |
CA |
|
138 |
Uttar Pradesh |
IMROVEMENT, OPERATION AND MAINTENANCE OF REHABILITATION AND STRENGTHENING OF EXISTING 2 LANE ROAD AND WIDENING TO 4 LANE DIVIDED HIGHWAY OF KM 52.250 TO KM 131.000 OF NH 58 (MEERUT - MUZZAFARNAGAR SECTION) IN THE STATE OF UTTAR PRADESH ON BOT BASIS UNDER NHDP PHASE III A |
CA-VOL-I
CA-VOL-II
|
|
139 |
Uttar Pradesh |
FOUR LANING OF BAREILLY - SITAPUR SECTION ON NH - 24, FROM KM 263.000 TO KM 413.000 IN THE STATE OF UTTAR PRADESH UNDER NHDP III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS |
CA-VOL-I
CA-VOL-II
|
|
140 |
Uttar Pradesh |
DESIGN, CONSTRUCTION, DEVELOPMENT, FINANCE, OPERATION AND MAINTENANCE OF KM 49.700 TO KM 99.005 COVERING 49.305OKM OF NATIONAL HIGHWAY NO.26 (NH 26) IN THE STATE OF UTTAR PRADESH ON BOT (ANNUITY) BASIS |
CA-VOL-I
CA-VOL-II
|
|
141 |
Uttar Pradesh |
DESIGN, CONSTRUCTION, DEVELOPMENT, FINANCE, OPERATION AND MAINTENANCE OF 0.000 TO KM 49.700 COVERING 49.700 KM OF NATIONAL HIGHWAY NO. 25/26 ( NH 25/26) IN THE STATE OF UTTAR PRADESH ON BOT (ANNUITY) BASIS |
CA-VOL-I
CA-VOL-II
|
|
142 |
Uttar Pradesh |
IMPROVEMENT, OPERATION AND MAINTENANCE INCLUDING STRENGTHENING AND WIDENING OF EXISTING 2 LANE ROAD TO 4 LANE DUAL CARRIAGEWAY FROM KM 488.270 TO KM 413.200 OF NH 24 (LUCKNOW - SITAPUR SECTION) IN THE STATE OF UTTAR PRADESH ON BUILD, OPERATE AND TRANSFER (BOT) BASIS |
CA-VOL-I
CA-VOL-II
|
|
143 |
Uttar Pradesh |
DESIGN, ENGINEERING, CONSTRUCTION, DEVELOPMENT, FINANCE, OPERATION AND MAINTENANCE OF KM 220.00 TO KM 255.00 ON ORAI - BHOGNIPUR SECTION ON NATIONAL HIGHWAY NO. 25 (NH 25) AND KM 421.20 TO KM 449.00 ON BHOGNIPUR - BARAH SECTION ON NATIONAL HIGHWAY NO.2 (NH 2) IN THE STATE OF UTTAR PRADESH ON BOT BASIS |
CA-VOL-I
CA-VOL-II
|
|
144 |
Uttar Pradesh |
SIX LANING OF DELHI - AGRA SECTION OF NH 2 FROM KM 20.500 TO KM 200.000 (LENGTH - KM 179.500) IN THE STATE OF HARYANA/UTTAR PRADESH UNDER NHDP PHASE V AS BOT (TOLL) ON DBFO PATTERN |
CA-VOL-I
CA-VOL-II
|
|
145 |
Uttar Pradesh |
FOUR LANING OF HARIDWAR - DEHRADUN SECTION FROM KM 211.000 TO KM 218.200 OF NH 58 AND KM 165.000 TO KM 196.825 OF NH 72 IN THE STATE OF UTTARAKHAND UNDER NHDP PHASE III AS BOT (ANNUITY) ON DBFOT PATTERN |
CA-VOL-I
CA-VOL-II
|
|
146 |
Uttar
Pradesh |
DESIGN,CONSTRUCTION,FINANCE,OPERATION
AND MAINTENANCE OF KM 0.00 TO KM 32.27 OF GORAKHPUR BYPASS ON NH-28 IN THE OF
UTTAR PRADESH ON ANNUITY BASIS |
CA |
|
147 |
Visakhapatnam |
4/6 LANNING OF
TUNI-ANAKAPALLI SECTION OF NH-5 PACKAGE IV-A FROM KM 300.00 TO KM 358.947 (
TUNI ANAKAPALLI ) DISTRICT VISHAKAPATNAM |
CA-VOL-I
, CA-VOL-II |
|
148 |
West Bengal
|
| FOUR
LANING OF BAHARAMPORE - FARAKKA SECTION OF NH - 34
FROM KM 191.416
TO KM 294.684 IN THE STATE OF WEST BENGAL
UNDER NHDP PHASE III
ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER
(DBFOT) TOLL BASIS |
|
CA
|
|
149 |
West Bengal
|
| FOUR
LANING OF FARAKKA - RAIGANJ
SECTION OF NH 34
FROM KM 295.00
TO KM 398.000
IN THE STATES OF WEST BENGAL
UNDER NHDP PHASE III ON DBFOT ( TOLL) BASIS |
|
CA-VOL-I
CA-VOL-II
|
|
150 |
West Bengal
|
| FOUR
LANING OF RAIGANJ - DALKHOLA SECTION OF NH
34 FROM
KM 398.000 TO KM 452.750 IN THE STATE OF WEST BENGAL
UNDER NHDP PHASE III
ON DBFOT (TOLL) BASIS |
|
CA-VOL-I
CA-VOL-II
|
|
151 |
West Bengal
|
| STRECH
OF NATIONAL HIGHWAY FROM KM.516 TO KM 67O IN PANAGARH -
CALCUTTA SECTION ON NH 2 IN THE STATE OF WEST BENGAL |
|
CA
|
|
152 |
West Bengal |
STRECH OF NATIONAL HIGHWAY FROM KM.581 TO KM 646 ON T HE EXISTING DURGAPUR EXPRESSWAY (DANKUNI - PALSIT SECTION OF NH 2 IN THE STATE OF WEST BENGAL |
CA |
|
153 |
Andhra Pradesh |
Consulting services as Independent Engineer during Operation & Maintenance of 4-lane divided carriageway facility of Tuni –Ankapalli (km 300 to km
359.20) section on NH-5 in the States of Andhra Pradesh, on BOT (Annuity) Basis |
CA
1
CA
2
CA
3
CA
4
|