Chainage Chart of NHDP Phase III
Status : 31st May 2014

S.NO
Stretch
State
Funded By

NH Length
(Km)

Present Status

Contractor & Nationality
NHDP Phase III

1
2 Laning of Dindigul-Perigulam-Theni-Kumili

Tamil Nadu
Annuity

220 134 Under Implementation Transstroy-OJSC Consortium Ltd
Indian-Russian

2
2 Laning of Forbesganj-Jogwani(Approved Length 13 Km)

Bihar
Annuity

57A 9.258 Contract Terminiated

3
2 Laning of Mokama-Munger(Approved Length 70 Km)

Bihar
Annuity

80 69.27 Under Implementation BSCPL -C & C Consortium
Indian

4
2 Laning of Muzaffarpur - Sonbarsa(Approved Length 89 Km)

Bihar
Annuity

77 86 Under Implementation BSCPL-C&C(JV)
Indian

5
2-Laning with PS khagaria - Purnea

Bihar
Annuity

31 140 Under Implementation Punj Lloyd Infrastructure Ltd.
Indian

6
2-Laning with PS Motihari-Raxaul (Approved Length 67 Km)

Bihar
BOT

28A 68.79 Under Implementation Tantia-Jiangsu (JV)
Indian-China (JV)

7
4 Laning of Ahmedabad to Godhara (Approved Length 210 Km)

Gujarat
BOT

59 117.6 Under Implementation ESSEL Infra & CR-18 Consortium
Indian-china

8
4 Laning of Barhi - Hazaribagh(Approved Length 40 Km)

Jharkhand
BOT

33 41.314 Under Implementation Abhijeet Infrastructure Ltd-Corporate Ispat Alloy Ltd(JV)
Indian

9
4 Laning of Chappra-Hajipur(Approved Length 153 Km)

Bihar
Annuity

19 65 Under Implementation Madhucon Projects Ltd
Indian

10
4 Laning of Godhara to Gujarat /MP Border(Approved Length 210 Km)

Gujarat
BOT

59 87.285 Under Implementation BSPCL Ltd
Indian

11
4-Laning of Cuttak - Angul

Orissa
BOT

42 112 Under Implementation Ashoka Buildcon
Indian

12
4-Laning of Rohtak-Jind (Approved Length 45 Km)

Haryana
BOT

71 48.6 Under Implementation Vijai Infrastructure Ltd.
Indian

13
Ambala-Kaithal

Haryana

65 78 Balance for award

14
Amritsar - Wagha border

Punjab
Annuity

1 35.93 Completed Rohan Builders Pvt. Ltd. - Rajdeep Buildcon Pvt. Ltd. - IDFC Ltd. Consortium
Indian

15
Assam Mizoram Border to Aizawl

Mizoram

54 140 Balance for award

16
Assam/Meghalaya Border - Assam/Tripura Border

Assam

44 116 Balance for award

17
Baihata Chariali- Banderdewa

Assam

52 314 Balance for award

18
Banderdewa - Assam/AP Border

Assam

52A 9 Balance for award

19
Banglore - Neelamangala (Six lane)

Karnataka
BOT

4 19.5 Under Implementation Navyuga Engineering Co. Ltd.
Indian

20
Barasat - Bangaon

West Bengal

35 60 Balance for award

21
Beawar-Pali-Pindwara (Approved Length - 246 Km)

Rajasthan
BOT

14 244.12 Under Implementation L&T Infrastructure Development Projects Ltd.
Indian

22
Bhopal - Bareli

Madhya Pradesh

12 297 Balance for award

23
Bhopal-Sanchi(Approved Length 40 Km)

Madhya Pradesh
Annuity

86Ex 53.78 Under Implementation Pratibha Industries-Abhyuday Housing Construction Ltd
Indian

24
Bijapur - Hungund Section (Approved Length 194 Km)

Karnataka
BOT

13 97.22 Completed SEL-MCL Consortium
Indian

25
Chandigarh - Kurali

Punjab

21 30 Balance for award

26
Chandikhole-Duburi

Orissa

200 39 Balance for award

27
Chattisgarh / Maharashtra Border - Wainganga Bridge

Maharashtra
BOT

6 80 Completed Ashoka - IDFC Consortium
Indian

28
Delhi - Hissar (Delhi Portion)

Delhi

10 20 Balance for award

29
Delhi/Haryana Border to Rohtak

Haryana
BOT

10 63.49 Under Implementation KCT - ERA consortium
Indian

30
Delhi/UP Border to Meerut

Uttar Pradesh

58 46 Balance for award

31
Deoli - Kota

Rajasthan
BOT

12 83 Under Implementation GVK Development Projects Pvt Ltd
Indian

32
Devihalli-Hassan(Approved Length 73 Km)

Karnataka
BOT

48 77.23 Under Implementation Larsen & Toubro Ltd.
Indian

33
Doboka-Assam/Nagaland Border

Assam

36 124 Balance for award

34
Duburi - Talchar

Orissa

200 98 Balance for award

35
Elevated Highway from Silk board junction to electronic city junction

Karnataka
BOT

7 9.98 Completed SOMA - NCC - MAYTAS Consortium
Indian

36
End of Durg Bypass - Chattisgarh / Maharashtra Border

Chattisgarh
BOT

6 82.685 Completed Ashoka - IDFC Consortium
Indian

37
Ghaziabad-Aligarh (Approved Length 106 )

Uttar Pradesh
BOT

91 126 Under Implementation SREI - PNC - GALFAR Consortium
Indian - Dubai

38
Haridwar - Dehradun (Approved Length 69)

Uttaranchal
Annuity

72 39 Under Implementation ERA - SIBMOST(JV)
Indian - Russian

39
Hazaribagh-Ranchi

Jharkhand
Annuity

33 75 Under Implementation ITNL-Punj Lloyd Ltd.(JV) (Hazaribagh Ranchi Express way ltd)
Indian

40
Hospet - Chitradurga

Karnataka
BOT

13 120.03 Contract Terminiated

41
Hungund-Hospet (Approved Length 194 Km)

Karnataka
BOT

13 97.89 Under Implementation GMR-OSE Consortium
Indian

42
Hyderabad-Yadgiri (Approved Length 30)

Andhra Pradesh
BOT

202 35.65 Completed Sadbhav Engineering Ltd. (Hyderabad-Yadgiri Tollways Pvt. Ltd.)
Indian

43
Indore-Jhabua-Gujrat/MP (Approved Length 168)

Madhya Pradesh
BOT

59 155.15 Under Implementation IVRCL Infrastructure Projects Ltd.
Indian

44
Itanagar-Arunachal Pradesh/Assam Border

Arunachal Pradesh

52A 22 Balance for award

45
Jaipur-Reengus(Approved Length 52.65 Km )

Rajasthan
BOT

11 54 Under Implementation RIL-AAA- JTEG Consortium
Indian-China

46
Jaipur-Tonk - Deoli(Approved Length 148.77 Km )

Rajasthan
BOT

12 150 Under Implementation IRB-MRM Consortium
Indian

47
Jhansi-Khajuraho

Madhya Pradesh

75 100 Balance for award

48
Kalamboli-Mumbra(6 laning)

Maharashtra

4 20 Balance for award

49
Kandla - Mundra Port(Approved Length 73 Km)

Gujarat
BOT

8A 71.4 Under Implementation Reliance Infra Projects Ltd.
Indian

50
Karaikudi - Ramanathapuram

Tamil Nadu

210 100 Balance for award

51
Kerala/TN Border - Kanyakumari

Tamil Nadu

47 56 Balance for award

52
Kishangarh-Ajmer-Beawar

Rajasthan
BOT

8 93.56 Under Implementation Isolux-Soma Consortium
Spain-Indian

53
Kohima-Nagaland/Manipur Border

Nagaland

39 28 Balance for award

54
Kundapur-Surathkal & Mangalore-KNT/Kerala Border

Karnataka
BOT

17 90 Under Implementation Navayuga - KPCL Consortium
Indian

55
Kurali - Kiratpur

Punjab
BOT

21 42.9 Completed BSCPL - C & C Consortium
Indian

56
Kurnud-Dhamtari

Chattisgarh

43 23 Balance for award

57
Madurai-Ramnathpuram-Rameshwaram-Dhanuskodi

Tamil Nadu

49 186 Balance for award

58
MH/ KNT Border Sangareddy

Karnataka
BOT

9 145 Under Implementation L&T Infrasructure Developement Projects Ltd
Indian

59
Muradabad-Bareily (Approved Length 112)

Uttar Pradesh
BOT

24 121 Under Implementation IL & FS Transportation Ltd.
Indian

60
Muzaffarnagar - Haridwar (Approved Length 77 )

Uttar Pradesh[21]/Uttaranchal[59]
BOT

58, 72 80 Under Implementation ERA-SIBMOST
Indian - Russian

61
Nagaland /Manipur Border -Imphal

Manipur

39 111 Balance for award

62
Nagapatanam-Thanjarur

Tamil Nadu

67 74 Balance for award

63
Nagpur-Wainganga Bridge (Approved Length - 60 Km)

Maharashtra
BOT

6 45.43 Under Implementation JMC Projects India Ltd.
Indian

64
Neelamangala Junction on NH 4 with NH 48 to Devihalli

Karnataka
BOT

48 81 Completed Lanco Devihalli Highways Pvt. Ltd.
Indian

65
Obaidullaganj-Bheembetka

Madhya Pradesh

69 13 Balance for award

66
Panipat - Rohtak(Approved Length 73 Km)

Haryana
BOT

71A 80.858 Completed Sadbhav Engineering Ltd
Indian

67
Panvel-Indapur

Maharashtra
BOT

17 84 Under Implementation Supreme Infrastructure India Ltd.-Mahavir Road & Infrastructure Pvt. Ltd.-China State Construction Engg. Hongkong Ltd.
Indian-China

68
Parwanoo - Shimla

Himanchal Pradesh

22 103 Balance for award

69
Patna- Muzzaffarpur

Bihar
Annuity

19 & 77 63 Under Implementation Gammon Infrastructure Ltd
Indian

70
Patna-Gaya-Dobhi

Bihar

83 125 Balance for award

71
Pimpalgaon - Nasik - Gonde

Maharashtra
BOT

3 60 Under Implementation Larsen & Toubro Ltd. - ABL Consortium
Indian

72
Pondicherry - Tindivanam

Tamil Nadu
BOT

66 38.61 Completed Maytas - NCC Consortium
Indian

73
Pondicherry - TN/Pondicherry Border

Pondichery

66 4 Balance for award

74
Pune-Sholapur Pkg-I(Approved Length Pkg I & II 170 Km)

Maharashtra
BOT

9 110.05 Under Implementation Navinya Buildcon-Atlantia Spa(JV)
Indian-Italy

75
Pune-Sholapur Pkg-II(Approved Length I & II 170 Km)

Maharashtra
BOT

9 105 Under Implementation IL & FS Transportation Network Ltd
Indian

76
Raipur-Simga

Chattisgarh

200 28 Balance for award

77
Rohtak - Bawal(Approved Length 97 Km)

Haryana
BOT

71 83.65 Under Implementation JMC-SREI(JV)
Indian

78
Shillong (Excluding Shillong By Pass ) - Jowai

Meghalaya

44 27 Balance for award

79
Silchar - Assam/Mizoram Border

Assam

54 50 Balance for award

80
Solapur - Maharashtra/ Karnatka Border

Maharashtra

13 30 Balance for award

81
Talegaon-Amravat(Approved Length 58Km)

Maharashtra
BOT

6 67.8 Under Implementation IRB-MRM Consortium
Indian

82
Trichy - Dindigul

Tamil Nadu
BOT

45 88.273 Completed Reliance Energy Limited
Indian

83
Trichy - Karur

Tamil Nadu
BOT

67 79.7 Under Implementation Reliance Energy Limited
Indian

84
Trivendrum -Kerala/TN Border

Kerala

47 29 Balance for award

85
up to Delhi/UP Border

Delhi

1 & 24 8 Balance for award

86
Zirakpur - Parwanoo

Haryana[20]/Himanchal Pradesh[6.69]/Punjab[2]
BOT

22 28.69 Completed Jaiprakash Associates-(Himalyan Expressways Pvt. Ltd.)
Indian

87
Rimoli - Roxy - Rajamunda(Approved Length 163Km)
163 to 269 Km
Orissa
BOT

215 96 Under Implementation MBL-SREI
Indian

88
4 Laning of Mulbagal - Karnataka / AP border-Approved Length (11 Km)
Km .216.912 to Km.239.10
Karnataka
BOT

4 22.18 Under Implementation J.S.R. Construction Pvt Ltd
Indian

89
4 laning of Jetpur-Somnath section of NH-8D (approved length 127.6)
km 0 to km 127.6
Gujarat
BOT

8D 123.45 Under Implementation IDFC-PLUS Expessway Berhad Consortium
Indian-Malaysian (JV)

90
Vijayawada-Machhlipatnam
km 0.0 to 63.8
Andhra Pradesh
BOT

9 64.611 Under Implementation Madhucon Projects Ltd.
Indian

91
Panikholi-Rimoli (Approved Length 106 Km)
Km 0.00 to Km 163.00
Orissa
BOT

215 163 Under Implementation Gayatri Projects Ltd.
Indian

92
Bhubneshwar-Puri(Approved Length 59 Km)
Km 0.00 to Km 59
Orissa
BOT

203 67 Under Implementation KSS-Valecha (Bhubneshwar Expressway Pvt. Ltd.)
Indian

93
Sambalpur-Baragarh-Chattisgarh/Orrisa Border
Km 0.00 to Km 88
Orissa
BOT

6 88 Under Implementation Ashoka Buildcon Ltd-(Ashoka Sambalpur Baragarh Expressway Pvt. Ltd.)
Indian

94
2-Laning with PS Gopalganj-Chappra
Km 0.00 to Km 94.7
Bihar
Annuity

85 92 Contract Terminiated

95
Two Laning of Trichy - Karaikudi and Trichy Bypass(Approved Length 100 Km)
KM 10.00 to Km 94.00 & Km 110.016 to Km 135.930
Tamil Nadu
Annuity

210 & 67 110.372 Under Implementation Transstroy Ltd-OJSC Consortium
Indian-Russian

96
Madurai-Arupukottai-Tuticorin
km 138.8 to km 264.5
Tamil Nadu
BOT

45B 128.16 Completed Madhucon Projects Ltd. - SREI - Madhucon granites Ltd (JV)
Indian

97
4-lanning of Kannur Vengalem Kuttipuram (Package -I)
Km 148 to km 230
Kerala
BOT

17 83.2 Contract Terminiated

98
Kudapa-Mydukur-Kurnool
Km 167.750 to 356.502
Andhra Pradesh
BOT

18 188.752 Under Implementation KMC Construction Ltd. - IVRCL Consortium
Indian

99
Six Laning of Bangalore-Hosur Section of NH-7
km 18.750 to 33.130
Karnataka
NHAI

7 14.38 Completed GVR Construction Pvt. Ltd. Chennai
Indian

100
4 Laning of Brahampore-Faraka
Km 191.416 to Km 294.684
West Bengal
BOT

34 103 Under Implementation Hindustan Construction Company Ltd.
Indian

101
4-lanning of Kannur Vengalem Kuttipuram (Package -II)
Km 230 to km 318
Kerala
BOT

17 81.5 Contract Terminiated

102
Banglore-Hoskote-Mudbagal Section
km 237.700 to km 318.000
Karnataka
BOT

4 79.724 Completed Lanco Hoskote Highway Pvt. Ltd.
Indian

103
4-Laning of Solapur - Maharashtra/ Karnatka Section
Km 249.00 to Km 348.80
Maharashtra
BOT

9 100.06 Under Implementation Coastal-SREI Consortium
Indian

104
Bareily - Sitapur(Approved Length 134 Km)
Km 262 to Km 413.200
Uttar Pradesh
BOT

24 151.2 Under Implementation ERA-SIBMOST
Indian-Russian

105
Tirupati -Tiruthani - Chennai(Approved Length 125.5 Km)
Km 274.800 - Km 341.6 to Km 0.00 to Km 59.6
Tamil Nadu[61.47]/Andhra Pradesh[63.23]
BOT

205 124.7 Under Implementation Transstroy -OJSC Consortium(JV)
Indian-Russian

106
4 Laning of Faraka-Raiganj
Km 295.00 to Km 398.00
West Bengal
BOT

34 103 Under Implementation Hindustan Construction Company Ltd.
Indian

107
4 Laning of Raiganj-Dalkola
Km 398.00 to Km 452.75
West Bengal
BOT

34 50 Under Implementation Hindustan Construction Company Ltd.
Indian

108
Hyderabad-Vijayawada
km 40 to 221.50
Andhra Pradesh
BOT

9 181.63 Completed GMR-Punj LLOYD Consortium(GMR-Hyderabad Vijayawada Expressway Pvt. Ltd.)
Indian

109
Amritsar - Pathankot (Approved Length 101Km)
Km 6.082 to 108.502/102.4 Km
Punjab
BOT

15 106 Under Implementation IRB-MRM Pvt Ltd.
Indian

110
4 Laning of UP/Haryana Border-Yamunanagar-Saha-Barwala- Panchkula
Km 71.64 to Km 179.249
Haryana
BOT

73 107 Contract Terminiated

111
Thanjarur - Trichy
km 80 - km 135.750
Tamil Nadu
BOT

67 56.49 Under Implementation Madhucon Projects Ltd.
Indian

112
Gujarat/Maharashtra Border-Surat - Hazira Port Section
Km. 0.0 to Km. 132.913
Gujarat
BOT

6 132.9 Under Implementation Isolux-Soma Consortium (JV)
Spain-Indian

113
4 Laning of Khagaria-Bakhtiarpur
Km. 0.00 to Km 112.982 (existing chainage from Km. 153.30 to Km. 270.00)
Bihar
BOT

31 112.982 Contract Terminiated

114
Salem-Ulundrupet (BOT-1/TN-06)
km. 0.313 to km. 136.670
Tamil Nadu
BOT

68 136.357 Completed Reliance Energy Limited
Indian

115
Krishnanagar - Berhampore
Km. 115.00 to Km.193.00
West Bengal
Annuity

34 78 Under Implementation SEW Infra.
Indian

116
Patna - Bakhtiarpur
km. 181.3 to km. 231.95
Bihar
BOT

30 50.6 Under Implementation BSC-C & C (JV)
Indian

117
4 Laning of Obedullaganj-Betul Section
Km. 2.80 to Km 8.30
Madhya Pradesh
BOT

69 125 Under Implementation Transstroy (India) Ltd.
Indian

118
4-Laning of Punjab/Haryana Border-Jind
Km. 239.00 to Km 307.00
Haryana
BOT

71 68 Under Implementation Unity Infraprojects Ltd.
Indian

119
Barasat - Krishnanagar
Km. 31.00 to Km.115.00
West Bengal
Annuity

34 84 Under Implementation Madhucon Projects Ltd.
Indian

120
2-Laning of Krishnagiri-Tindivanam (Approved Length 170 Km.)
Km. 37.6 to Km. 214.11
Tamil Nadu
Annuity

66 176.51 Under Implementation Transstroy (I) Ltd. - Corporation Transstroy OJSC Consortium
Indian - Russian

121
2 Laning of Jowai -Meghalaya/Assam Border (Approved length 109 Km)
Km. 69.20 to Km. 173.20
Meghalaya
BOT

44 102 Under Implementation Simplex Infrastructure Ltd.
Indian

122
Four Laning of Kiratpur-Ner Chowk Section
Km. 73.20 to Km. 186.50
Himanchal Pradesh
BOT

21 84.32 Under Implementation IL & FS Transportation Networks Ltd.
Indian

123
Four lanning of Ludhiyana- Talwandi section
km. 92.00 to km. 170.00
Punjab
BOT

95 78 Under Implementation Essel Infra Projects Ltd.- Pan Indian Networks Ltd.
Indian

124
Kota - Jhalawar

Rajasthan
BOT

12 88.09 Under Implementation Keti Constructions Ltd.
Indian

125
Patna - Buxar

Bihar
BOT

30 & 84 124.85 Under Implementation Gammon Infrastructure Projects Ltd
Indian

126
4-Laning of Rohtak - Hissar Section
Km87.0 to Km170.0 includ. conn. Link from Km87.0(NH-10) to Km348.0(NH-71)
Haryana
BOT

10 98.81 Under Implementation Sadbhav Engg. Limited
Indian

127
Rampur - Kathgodam

Uttaranchal
BOT

87 93.226 Under Implementation ERA Infra Engineering Ltd.-OJSC-SIBMOST (JV)
Indian - Russian

128
Ranchi - Rargaon - Jamshedpur
Km 114.00 to Km 277.50
Jharkhand
Annuity

33 163.5 Under Implementation Madhucon Projects Ltd.
Indian

129
Reengus - Sikar
Km. 298.075 to Km 341.962
Rajasthan
Annuity

11 43.887 Under Implementation G.R.Infraprojects Ltd.
Indian

130
4 Laning of Coimbatore-Mettupalayam
Km 323/850 to Km 377/780
Tamil Nadu
BOT

67 53.93 Under Implementation Transstroy-OJSC Consortium
Indian

131
MP/Maharashtra Border-Dhule

Maharashtra
BOT

3 88.79 Completed Hindustan Construction Company Ltd. -Laing-Sadbhav Consortium
Indian-UK

132
4 Laning of Belgaum-Khanpur Section(Km 0.00 to Km 30.00) and 2 Laning with paved sholuders of khanpur-Knt/Goa border.(Km 30.00 to Km 84.120)

Karnataka
BOT

4A 81.89 Under Implementation GVR Infra Projects-RMN Infrastructure Ltd
Indian

133
KNT/Kerala Border to Kanuur Section(Approved Length 286.3)

Kerala
BOT

17 126.6 Contract Terminiated

134
4 Laning of Solapur - Bijapur
Km . 0.00 to Km. 110.542
Maharashtra[35]/Karnataka[75.542]
BOT

13 110.542 Under Implementation Sadbhav Engineering Limited
Indian

135
4/6 Laning of Maharastra/Goa Border - Panaji Goa/KNT Border

Goa
BOT

17 139 Under Implementation IVRCL Infrastructure & Projects Ltd
Indian

136
Panji-Goa/Karnatka Border

Goa
BOT

4A 69 Under Implementation IRB-MRM Consortium
Indian

137
Charthalai-ochira

Kerala
BOT

47 83.6 Under Implementation ISOLUX-SOMA
Spain-Indian

138
Pune - Khed
Km 12/190 to Km.42/000
Maharashtra
BOT

50 30 Completed IRB - Madhujaya Consortium
Indian

139
Guna Bypass
Km. 319/700 to Km. 332/100
Madhya Pradesh
BOT

3 14 Completed Guna Infrastructure Ltd.
Indian

140
Meerut-Muzaffarnagar
Km 52.250 to Km.131.00
Uttar Pradesh
BOT

58 79 Completed Nagarjuna Construction Co. Ltd. - MAYTAS Consortium
Indian

141
Dhule - Pimpalgaon
Km. 380/0 to Km. 265/0
Maharashtra
BOT

3 118 Completed IRCON-SOMA Consortium
Indian

142
Mahua-Jaipur
Km. 120 to Km 228
Rajasthan
BOT

11 108 Completed JMTPL(I) Corporation Project
Malaysian

143
Bharatpur-Mahua
km. 63 to Km. 120
Rajasthan
BOT

11 57 Completed Madhucon Projects Ltd. - SREI
Indian

144
Gonde-Vadape (Thane)
Km. 440/000 to Km. 539/500
Maharashtra
BOT

3 100 Completed Gammon India Ltd. - Sadbhav - Billimoria Consortium
Indian

145
Aurang - Raipur
Km 232 to Km. 281
Chattisgarh
BOT

6 43.485 Under Implementation Apollo(UK) - JLI(UK) - DSC(Indian) - LOR(UK) Consortium
UK - Indian JV

146
Jalandhar - Amritsar
Km. 407/100 to Km. 456/100
Punjab
BOT

1 49 Completed IVRCL Infrastructure Projects Ltd.
Indian

147
Ambala - Zirakpur
Km. 5/735 to Km. 39/961 of NH-22 and Km. 0/0 to Km. 0/871 of NH-21
Haryana[6]/Punjab[30]
BOT

21, 22 36 Completed GMR Energy Ltd. & GMR Infrastruture Ltd. Consortium
Indian

148
Kondhali - Telegaon
Km 50 to Km 100
Maharashtra
BOT

6 50 Completed Oriental Structural Engineers Pvt. Ltd.- Delhi Brass Consortium
Indian

149
Khalghat - MP/Maharashtra Border
Km 12.600 to Km 84.70
Madhya Pradesh
BOT

3 82.8 Completed Navyuga Engineering Co. Ltd.
Indian

150
Indore-Khalghat
Km 84.00 to Km 167.50
Madhya Pradesh
BOT

3 80 Completed Oriental Structural Engineers Pvt. Ltd.- Delhi Brass Consortium
Indian

151
Agra - Bharatpur
km 17.756 - km 63
Uttar Pradesh[24.75]/Rajasthan[20.25]
BOT

11 45 Completed Oriental Structural Engineers Pvt. Ltd.- Delhi Brass Consortium
Indian

152
Sitapur - Lucknow
Km 488.27 to km 413.20
Uttar Pradesh
BOT

24 75 Completed Apollo(UK) - JLI(UK) - DSC(Indian) - LOR(UK) Consortium
UK - Indian JV

153
Nagpur - kondhali
Km 9.2 to Km 50
Maharashtra
BOT

6 40 Under Implementation Atlanta - SREI Consortium (JV)
Indian