Chainage Chart of Corridor East - West
Status : 30th June 2016

S.NO
Stretch
State
Funded By

NH Length
(Km)
Total Project Cost

Present Status

Contractor & Nationality
East - West Corridor

1
Silchar-Udarband (AS-1)
Km 309 to Km 275.00
Assam
NHAI

54 25.87 154.57  Under Implementation Punj Lloyd Ltd.
Indian

2
Udarband to Harangajo (AS-14)
Km 275.00 to Km 244.00
Assam

54 31   Balance for award

3
Harangajo to Maibang (AS-21)
Km 165.4.00 to Km 190.587
Assam
NHAI

54 26 386.1  Under Implementation N.K.C - JKM (JV)
Indian

4
Harangajo to Maibang (AS-22)
Km 140.70 to Km 164.08
Assam
NHAI

54 24 363.74  Under Implementation N.K.C - JKM (JV)
Indian

5
Harangajo to Maibang (AS-23)
Km 126.450 to Km 140.700 , km 164.080 to km. 165.400
Assam
NHAI

54 16 280  Under Implementation Hindustan Construction Company Ltd.
Indian

6
Maibang to Lumding (AS-27)
Km 40.000 to Km 60.500
Assam
NHAI

54 21 200  Under Implementation Gayatri -ECI (JV)
Indian

7
Maibang to Lumding (AS-26)
Km 60.500 to Km 83.400
Assam
NHAI

54 23 167.64  Under Implementation Simplex Infrastructure Ltd.
Indian

8
Maibang to Lumding (AS-25)
Km 83.400 to Km 111.000
Assam
NHAI

54 28 385.13  Under Implementation IL&FS Engineering Con Co Ltd
Indian

9
Maibang to Lumding (AS-24)
Km 111.000 to Km 126.450
Assam
NHAI

54 15 280.13  Under Implementation N.K.C Projects Pvt. Ltd.
Indian

10
Lumding to Daboka (AS-15)
Km 40.00 to Km 22.00
Assam
NHAI

54 18 130  Completed Patel - KNR (JV)
Indian

11
Lanka to Daboka (AS-16)
Km 22.00 to Km 2.4
Assam
NHAI

54 24.03 225  Completed Punj Lloyd Ltd.
Indian

12
Daboka to Nagaon (AS-17)
Km 36 to Km 5.5
Assam
NHAI

36 30.5 225  Completed Maytas Infrastructure Ltd.
Indian

13
Nagaon bypass (AS-18)
Km 5.5(NH-36) to km 262.7(NH-37) and from km 262.70 to km 255
Assam
NHAI

37 23.66 230  Completed Patel - KNR (JV)
Indian

14
Nagaon to Dharmatul (AS-2)
km 255 to km 230
Assam
NHAI

37 25 264.72  Under Implementation Madhucon Projects Ltd.
Indian

15
Dharamtul to Sonapur (AS-19)
Km 230.5 to Km 205
Assam
NHAI

37 25.5 200  Completed IL&FS Engineering Con Co Ltd
Indian

16
Dharamtul to Sonapur (AS-20)
Km 205.00 to Km 183
Assam
NHAI

37 22 160  Under Implementation KMC Construction Ltd.
Indian

17
Sonapur to Guwahati (AS-3)
km 183 to km 163.895
Assam
NHAI

37 19 245  Under Implementation Maheshwari Brothers Ltd.-Telecommunication Consultant India Ltd.
Indian

18
Guahati bypass (EW/7)
km 163.895 - km 156
Assam
NHAI

37 8 54.87  Completed Valecha Engineering Ltd.
Indian

19
Guwahati Bypass (EW-14/AS)
Km. 156.00 to Km. 146.00
Assam
NHAI

37 10.5 63.69  Completed Banvari Lal Agarwal (BLA) - CISC - C&C Construction (JV)
Indian

20
Brahmputra Bridge (AS-28)
Km.1126.00 to Km.1121.00
Assam
NHAI

31 5 217.61  Under Implementation Gammon India Ltd.
Indian

21
Guwahati to Nalbari (AS-4)
Km.1121.00 to Km.1093.00
Assam
NHAI

31 28 175.96  Under Implementation Punj Lloyd Ltd.
Indian

22
Guwahati to Nalbari (AS-5)
Km.1093.00 to Km.1065.00
Assam
NHAI

31 28 198.16  Under Implementation Punj Lloyd Ltd.
Indian

23
Nalbari to Bijni (AS-6)
Km.1065.00 to Km.1040.3
Assam
NHAI

31 25 225  Under Implementation Dinesh Chandra R. Agarwal - Infracon Pvt. Ltd. - Banowari Lal Agarwalla Pvt. Ltd. - Brahmaputra Constorium Ltd.
Indian

24
Nalbari to Bijni (AS-7)
Km.1040.3 to Km.1013.00
Assam
NHAI

31 27.3 208  Under Implementation KMC Construction Ltd.
Indian

25
Nalbari to Bijni (AS-8)
Km.1013.00 to Km.983.00
Assam
NHAI

31 30 200  Under Implementation Punj Lloyd Ltd.
Indian

26
Nalbari to Bijni (AS-9)
Km.983.00 to Km.961.5
Assam
NHAI

31 21.5 142  Under Implementation Punj Lloyd Ltd.
Indian

27
Bijni to Assam/WB Border (AS-10)
Km.93.00 to Km. 60.00
Assam
NHAI

31C 33 237.8  Under Implementation GPL-ECI (JV)
Indian

28
Bijni to Assam/WB Border (AS-11)
Km.60.00 to Km.30.00
Assam
NHAI

31C 30 195  Under Implementation GPL-ECI (JV)
Indian

29
Bijni to Assam/WB Border (AS-12)
Km.30.00 to Km. 0.00
Assam
NHAI

31C 30 230  Under Implementation Progressive Construction Ltd.
Indian

30
Assam/WB Border to Gairkatta (WB-1)
Km.255.00 to Km.223.00
West Bengal
NHAI

31C 26.5 221.82  Completed Italian Thai Dev. Projects Co. Ltd.
Thailand

31
Ghoshukur (km 351 of NH 31) to Salsalabari (km 226 of NH 31C) via Fulbari- Mainagnri - Dhumpgiri - Falkata (3 Packages)

West Bengal

31, 31C 201   Balance for award

32
Silliguri to Islampur (WB-6)
Km.551.00 to Km.526.00
West Bengal
NHAI

31 25 155  Completed B. Seenaiah & Co. (Projects) Ltd.
Indian

33
Siliguri to Islampur (WB-7)
Km.526.00 to Km.500
West Bengal
NHAI

31 19.25 225  Completed IRCON International Ltd.
Indian

34
Dalkola Islampur Sub section 2(EW/6)
km 500 to km 476.15
West Bengal
NHAI

31 23.85 90.06  Completed Lanco Construction Ltd
Indian

35
Dalkola - Islampur (EW/5)
km 470 - km 447
West Bengal
NHAI

31 23 72.56  Completed Progressive Construction Ltd.
Indian

36
Purnea - Gayakota (EW/4)
km 476.15 - km 470 & km 419 - km 410
Bihar
NHAI

31 15.15 62.98  Completed Progressive Construction Ltd.
Indian

37
Purnea - Gayakota (EW-12/BR)
km 447 - km 419
Bihar
NHAI

31 28 205.73  Completed Lanco Construction Ltd - Rani (JV)
Indian

38
Purnea-Forbesganj (BR-1)
km 309.0 to km.268
Bihar
NHAI

57 42.5 276  Completed Progressive Construction Ltd.
Indian

39
Purnea-Forbesganj (BR-2)
km 268.0 to km.230
Bihar
NHAI

57 36.7 310  Completed Progressive Construction Ltd.
Indian

40
Forbesganj-Simrahi (BR-3)
km 230 to km 190
Bihar
NHAI

57 34.87 332.94  Under Implementation Gammon India Ltd.
Indian

41
Simrahi to Ring bund (missing link) (BR-4)
km 190 to km 165
Bihar
NHAI

57 15.15 100.5  Completed Simplex Infrastructure Ltd.
Indian

42
Kosi Bridge including approaches and Guide Bond & Afflux Bond (BR-5)
km 155 to km 165
Bihar
Annuity

57 10.63 418.04  Completed Gammon india Ltd. - GIPL Consortium
Indian

43
Ring bunds to Jhanjharpur (BR-6)
km 155 to km 110
Bihar
NHAI

57 38.55 340  Completed BSCPL - C&C (JV)
Indian

44
Jhanjhapur to Darbanga (BR-7)
km 110 to km 70
Bihar
NHAI

57 37.59 340  Completed Madhucon Projects Ltd.
Indian

45
Darbanga to Muzzaffarpur (BR-8)
km 70 to km 30
Bihar
NHAI

57 32.05 305  Completed B. Seenaiah & Co. (Projects) Ltd. - C & C (JV)
Indian

46
Darbanga to Muzzaffarpur (BR-9)
km 30 to km 0
Bihar
NHAI

57 37.75 291.8  Completed B. Seenaiah & Co. (Projects) Ltd. - C & C (JV)
Indian

47
Muzzaffarpur to Mehsi (LMNHP-12)
km 520 to km 480
Bihar
WB

28 40 275  Completed Progressive Construction Ltd. - MVR (JV)
Indian

48
Mehsi to Kotwa (LMNHP-11)
km 480 to km 440
Bihar
WB

28 40 239  Completed Madhucon Projects Ltd.
Indian

49
Kotwa to Dewapur (LMNHP-10)
km 440 to km 402
Bihar
WB/NHAI

28 38 240  Contract Terminiated

50
Deewapur to UP/Bihar Border (LMNHP-9)
km 402 to km 360.915
Bihar
WB/NHAI

28 41.085 300  Contract Terminiated

51
UP/Bihar Border to Kasia (LMNHP-8)
km 360.915 to km 319.8
Uttar Pradesh
WB

28 41.16 227  Completed Simplex
Indian

52
Kasia to Gorakhpur (LMNHP-7)
km 319.8 to km 279.8
Uttar Pradesh
WB

28 40 242  Completed NCC - VEE (JV)
Indian

53
Gorakhpur Bypass
Km. 251.7 to Km. 279.8
Uttar Pradesh
Annuity

28 32.6 600.24  Completed Gammon india Ltd. - GIPL - ATSL Consortium
Indian

54
Gorakhpur-Ayodhya (LMNHP-6)
Km. 251.70 to Km. 208.00
Uttar Pradesh
WB

28 44.86 239  Completed B. Seenaiah & Co. (Projects) Ltd.
Indian

55
Gorakhpur-Ayodhya (LMNHP-5)
Km. 208.00 to Km. 164.00
Uttar Pradesh
WB

28 44 227  Completed Nagarjuna Construction Co. Ltd.
Indian

56
Gorakhpur-Ayodhya (LMNHP-4)
Km. 164.00 to Km. 135.00
Uttar Pradesh
WB

28 29 205  Completed Hindustan Construction Company Ltd.
Indian

57
Ayodhya-Lucknow (LMNHP-3)
Km. 135.00 to Km. 93.075
Uttar Pradesh
WB

28 46 212  Completed Hindustan Construction Company Ltd.
Indian

58
Ayodhya-Lucknow (LMNHP-2)
Km. 93.075 to Km. 45
Uttar Pradesh
WB

28 47 217  Completed Hindustan Construction Company Ltd.
Indian

59
Ayodhya-Lucknow (LMNHP-1)
Km. 45.00 to Km.8.250
Uttar Pradesh
WB

28 36.75 193  Completed Hindustan Construction Company Ltd.
Indian

60
Lucknow Bypass (EW-15/UP)
Connecting NH-25 and NH-28 via NH56
Uttar Pradesh
NHAI

56A & B 22.85 111.78  Completed NKG Infrastructure Ltd.
Indian

61
Lucknow Kanpur Section (EW/2)
km 11.38 - km 21.8
Uttar Pradesh
NHAI

25 10.42 32.85  Completed Villayati Ram Mittal
Indian

62
Lucknow-Kanpur section (EW-8/UP)
Km.21.80 to Km. 44.00
Uttar Pradesh
NHAI

25 22.2 94.91  Completed Villayati Ram Mittal
Indian

63
Lucknow-Kanpur section (EW-9/UP)
km 44 - km 59.5
Uttar Pradesh
NHAI

25 15.5 50.02  Completed B.R. Arora & Associate (BRA) - TRGupta - BHARAT (JV)
Indian

64
Lucknow - Kanpur (EW/3B)
km 59.5 - km 75.5
Uttar Pradesh
NHAI

25 16.2 54  Completed Neeraj Cement Structural Ltd
Indian

65
Ganga Bridge to Rama Devi Crossing (UP-6)
km 75.0 - km 80.06
Uttar Pradesh
NHAI

25 5.44 201.66  Under Implementation Gammon India Ltd.
Indian

66
Kanpur - Bhognipur section
km 492- km 449
Uttar Pradesh
WB

2 43   Completed

67
Bara to Orai
km 449 to 422 on NH-2 & km 255 to km 220
Uttar Pradesh
Annuity

2, 25 62.8 465  Completed NCC - KMC Consortium
Indian

68
Orai to Jhansi (UP-5)
km 220.0 - km 170.0
Uttar Pradesh
ADB

25 50 340.68  Completed IRCON International Ltd.
Indian

69
Orai to Jhansi (UP-4)
km 170.0 - km 104.0
Uttar Pradesh
ADB

25 68.2 451.97  Under Implementation Sunway Construction Ltd.
Malaysian

70
Jhansi Bypass (UP-3)
km 104.0 - km 91.0
Uttar Pradesh
ADB

25 15 158.06  Completed Oriental Structural Engineers Pvt. Ltd.
Indian

71
Jhansi-Shivpuri (UP/MP-1) (UP-11 km & MP - 30 km)
km 91 to km 50 (UP-11 km & MP-30 km)
Uttar Pradesh[11]/Madhya Pradesh[30]
ADB

25 41 220.31  Completed Oriental Structural Engineers Pvt. Ltd.
Indian

72
Jhansi-Shivpuri (EW-II - MP-2)
km 50 to km 15
Madhya Pradesh
ADB

25 35 213.69  Completed ITD- CemIndia (JV)
Thailand - Indian JV

73
Shivpuri Bypass & upto MP/RJ Border(EW-II - MP-I)
km 15 to km 0 of NH 25 & km 610 to km 579 of NH 76
Madhya Pradesh
ADB

25, 76 53 360.34  Completed CSCHK-Soma (JV)
China - Indian JV

74
RJ/MP Border to Kota (RJ-11)
km.579 to km.509
Rajasthan
ADB

76 70 349.59  Completed Larsen & Toubro Ltd. ECC DIVISION
Indian

75
RJ/MP Border to Kota (RJ-10)
km.509 to km. 449.15
Rajasthan
ADB

76 59.85 430.21  Completed KMC Construction Ltd.
Indian

76
RJ/MP Border to Kota (RJ-9)
km.449.15 to km. 406
Rajasthan
ADB

76 43.15 359.43  Completed Sunway Construction Ltd.
Malaysian

77
Kota Bypass (RJ-4)
km.406 to km. 381
Rajasthan
NHAI

76 26.42 250.39  Completed ITD- CemIndia (JV)
Thailand - Indian JV

78
Chambal Bridge (RJ-5)

Rajasthan
NHAI

76 1.4 281.31  Under Implementation Hyundai eng. Cons. Co. Ltd. - M/s Gammon India Ltd.
Korean - Indian JV

79
Kota to Chittorgarh (RJ-8)
km.381 to km. 316
Rajasthan
ADB

76 65 528.44  Completed Punj Lloyd Ltd.
Indian

80
Kota to Chittorgarh (RJ-7)
km.316 to km. 253
Rajasthan
ADB

76 63 503.66  Completed CEC - Hindustan Construction Company Ltd. (JV)
China - Indian JV

81
Chittorgarh Bypass (RJ-6)
km.253 to km. 213
Rajasthan
ADB

76 40 447.9  Completed China Gezhouba Water & Power(Group) Co. Ltd.
China

82
Chittorgarh - Udaipur
km 220 - km 113.825
Rajasthan
NHAI

76 106   Completed

83
Gogunda to Udaipur (RJ-3)
km.104 km to km 73
Rajasthan
NHAI

76 31 288.06  Completed Ranjit - Tarmat (JV)
Indian

84
Bakaria to Gogunda (RJ-2)
km.73 km km 29
Rajasthan
NHAI

76 44 530.9  Completed SOMA - BSCPL(JV)
Indian

85
Swaroopganj to Bakaria (RJ-1)
km 29 km 0 (NH 76) & km 264 to km 249.7 (NH 14)
Rajasthan
NHAI

76, 14 43 243.11  Completed Agrawal JV
Indian

86
Palanpur to Swaroopganj (Rajasthan -42 km & Gujarat-34 km )
km 264 to km 340
Rajasthan[42]/Gujarat[34]
Annuity

14 76 498  Completed Larsen & Toubro Ltd., ECC Division
Indian

87
Abu Road Deesa Section near Palanpur (EW/1)
km 340 - km 350
Gujarat
NHAI

14 10 18.39  Completed Dinesh Chandra R. Agarwal
Indian

88
Palanpur - Dessa (EW-11/GJ)
Km.350.00 to Km. 372.70
Gujarat
NHAI

14 22.7 53.73  Completed Dinesh Chandra R. Agarwal
Indian

89
Deesa to Radhanpur (Package-VI)
Km 372.60 to Km 458.0
Gujarat
ADB

14 85.4 479.74  Completed Daelim Industrial Corp. Ltd.-Nagarjuna Construction Co. Ltd. (JV)
Korean - Indian JV

90
Radhanpur to Gagodhar (Package-V)
Km 138.80 to Km 245.00
Gujarat
ADB

15 106.2 410.24  Completed Jilin - Sadhbhav (JV)
China - Indian JV

91
Gagodhar to Garamore (Package-IV)
km.245.0 to km.281.3 and km 308.00 to km 254.00
Gujarat
ADB

15, 8A 90.3 479.54  Completed Daelim Industrial Corp. Ltd.-Nagarjuna Construction Co. Ltd. (JV)
Korean - Indian JV

92
Garamore to Bamanbore (Package-III)
km 254.00 tokm 182.60
Gujarat
ADB

8A 71.4 380.7  Completed Daelim Industrial Corp. Ltd.-Nagarjuna Construction Co. Ltd. (JV)
Korean - Indian JV

93
Bamnaborr - Rajkot
km 216 - km 185
Gujarat
MORTH

8B 31   Completed

94
Rajkot Bypass & Gondal Jetpur (Package-VII)
km 117.00 to km 143.00 & km 175.00 to km 185.00
Gujarat
BOT

8B 36 388.09  Completed West Gujrat Expressway Ltd.
Indian

95
Rajkot - Ribda
km 175 - km 160
Gujarat
MORTH

8B 15   Completed

96
Ribda to Gondal section (EW-10/GJ)
km 160 - km 143
Gujarat
NHAI

8B 17 40.44  Completed Tarmat - Backbone Projects (JV)
Indian

97
Jetpur to Bhiladi (Package-II)
km.117 to km 52.50
Gujarat
ADB

8B 64.5 508.5  Completed Longjian Road & Bridge Ltd
China

98
Bhiladi to Porbandar (Package-I)
km 52.50 to km.2.00
Gujarat
ADB

8B 50.5 276.07  Completed LIMAK - SOMA (JV)
Turkish - Indian JV

99
4 Laning of NH-31D from Ghoshpukur - Salsalabari ( km 0.00 to Km . 83.785)
km . 0.000 to 83.785
West Bengal
NHAI

31-D 83.785 1083  Under Implementation L & T Ltd
Indian

100
Balance work of 4 laning of Gorakpur -Gopalganj
KM 360.91 to Km 402.000
Bihar
NHAI

28 41 581.84  Under Implementation Punj Lloyd
Indian

101
Construction of Islampur By pass

West Bengal
NHAI

31 10.31 361.15  Under Implementation Asoka Buildcon Pvt Ltd
Indian