Chainage Chart of Corridor North-South
Status : 31st October 2016

S.NO
Stretch
State
Funded By

NH Length
(Km)

Present Status

Contractor & Nationality
North-South Corridor

1
Four laning of Udhambur - Ramban section of NH-1A
km .67.000 to Km.89.000 and km.130.000 km.151.000
Jammu Kashmir
NHAI

1A 40.17 Under Implementation Gammon India Ltd
Indian

2
Balance work of four laning of Nagpur - Hyderbad section of NH-7(NS-62)
km 153.000 to Km 175.000
Maharashtra
NHAI

7 22 Under Implementation Raj Promoters & Civil Engineers Pvt Ltd
Indian

3
Balance work of four laning of Nagpur - Hyderabad section of NH-7( NS-60)
km 94.000 to km 123.000
Maharashtra
NHAI

7 29 Under Implementation GHV ( india ) Ltd
Indian

4
Four laning of Ramban - Banihal section of NH-1A
Km.151.000 to Km.187.000
Jammu Kashmir
NHAI

1A 32.1 Under Implementation HCC Ltd
Indian

5
4 Laning of four stretches of Lakhnadon - Seoni ( leftout Stretches ) of NH-7

Madhya Pradeh
NHAI

7 9.24 Under Implementation UDIT Infra World Pvt Ltd - Prakash Asphalting & Toll Highways (I) Ltd
Indian

6
Srinagar Bypass (Road Portion)(NS-30)
Km 286 to km 303.8
Jammu Kashmir
NHAI

1A 17.8 Completed Prakash Builders Associates Infrastructure Ltd.
Indian

7
Srinagar Bypass (Bridge Portion) (NS-30A)
km. 286 to km 303.8
Jammu Kashmir
NHAI

1A 1.23 Completed Valecha Engineering Ltd.
Indian

8
Udhampur-Ramban

Jammu Kashmir

1A 43 Balance for award

9
Quazigund-Banihal
Km.220 to Km.188
Jammu Kashmir
Annuity

1A 15.25 Under Implementation Navyuga Engineering Co. Ltd.
Indian

10
Srinagar to Banihal

Jammu Kashmir
Annuity

1A 67.76 Under Implementation Ramkey Infra and JPTEG
Indian-China (JV)

11
Ramban to Banihal

Jammu Kashmir

1A 36 Under Implementation

12
Chenani-Nashri

Jammu Kashmir
Annuity

1A 12 Under Implementation IL & FS Transportation Networks Ltd
Indian

13
Jammu - Udhampur
Km. 27.5 to Km. 67
Jammu Kashmir
Annuity

1A 65 Under Implementation Shaboorji & Palonji Co. Ltd.
Indian

14
Jammu to Kunjwani (Jammu Bypass) NS-33/J&K
Km 0.00 to Km 15
Jammu Kashmir
NHAI

1A 14.7 Completed M. Venkata Rao Engineering
Indian

15
Kunjwani to Vijaypur (NS-15/J&K)
km 97 - km 80
Jammu Kashmir
NHAI

1A 17.2 Completed Border Road Organization
Indian

16
Vijaypur to Pathankot (NS-34/J&K)
Km 16.35 to km 50.00
Jammu Kashmir
NHAI

1A 33.65 Completed ITD Cementation (I) Ltd.
Indian

17
Vijaypur to Pathankot (NS-35/J&K)
Km 50 to Km 80
Jammu Kashmir
NHAI

1A 30 Under Implementation ITD Cementation (I) Ltd.
Indian

18
Pathankot to Jammu & Kashmir Border (NS-36/J&K)
Km 110.45 to Km 117.6 & Km. 4.0 to Km. 16.5
Punjab
NHAI

1A 19.65 Under Implementation M. Venkata Rao Engineering
Indian

19
Pathankot to Bhogpur (NS-37/PB)
Km 70 to Km 110
Punjab[29]/Himanchal Pradesh[11]
NHAI

1A 40 Completed ITD Cementation (I) Ltd.
Indian

20
Pathankot to Bhogpur (NS-38/PB)
Km 26 to Km 70
Punjab
NHAI

1A 44 Completed IVRCL Infrastructure Ltd
Indian

21
Phagwara Junction on NH-1
(Flyover on existing 4-lane road)
Punjab
NHAI

1 1 Completed Valecha Engineering Ltd.
Indian

22
Bhogpur to Jalandhar (NS-16/PB)
km 26 - km 4.23
Punjab
NHAI

1A 21.77 Completed Bumi Highway
Malaysian

23
Jalandhar Bypass (NS/1)
km 387.1 of NH-1-km 4.23 of NH -1A-km 372.7 of NH 1)
Punjab
NHAI

1 14.4 Completed Birla GTM Interpose Ltd.
Indian

24
Jalandhar-Ambala
km 372.7 - km 212
Punjab
WB

1 160.7 Completed

25
Ambala-Panipat
km 212 - km 96
Haryana
WB

1 116 Completed

26
Panipat Elevated Highway (Six lane)
Km 96.00 to 86.00
Haryana
BOT

1 10 Completed Larsen & Toubro Ltd.
Indian

27
Panipat to Panchi Gujran (Six laning work) (NS-89/HR)
Km 86.00 Km 66.00
Haryana
NHAI

1 20 Completed IRCON International Ltd.
Indian

28
Six laning of Panchi Gujran to Kamaspur (Sonepat) (NS-17/HR)
Km 66.00 to Km 44.30
Haryana
NHAI

1 21.7 Completed Valecha Engineering ltd.
Indian

29
Six laning of Kamaspur to Haryana / Delhi Border (NS/2)
km 44.3 - km 29.3
Haryana
NHAI

1 15 Completed Nagarjuna Construction Co. Ltd.
Indian

30
Eight laning of Haryana/ Delhi Border to Mukaraba Chowk (NS-18/DL)
Km 29.3 to Km 16.5
Delhi
NHAI

1 12.9 Completed Kundu-MG(JV)
Indian

31
Eight Laning of Mukarba Chowk to Mall Road (Delhi)(NS3/DL)
km 16.2 - km 8.2
Delhi
NHAI

1 8.5 Completed Madhucon Projects Ltd.
Indian

32
Delhi - Agra
km 0 to km 199.8
Delhi[12]/Haryana[74]/Uttar Pradesh[113.8]
ADB

2 199.8 Completed

33
New 4 laning Agra Bypass (NS-1/UP-1)
Km 176.8 of NH2 to Km 13.03 of NH-3
Uttar Pradesh
NHAI

2,3 32.8 Under Implementation PNC Infratech Ltd.
Indian

34
Agra - Raj/UP Border (NS-4)
km 8 - km 24
Uttar Pradesh
NHAI

3 16 Completed PNC Construction Co.
Indian

35
Raj/UP border to Mania (NS-19/UP/RJ)
km 24 - km 41
Uttar Pradesh[7]/Rajasthan[10]
NHAI

3 17 Completed PNC Construction Co.
Indian

36
Mania - Dholpur (NS/5)
km 41 - km 51
Rajasthan
NHAI

3 10 Completed Maheshwari Brothers Ltd.
Indian

37
Dholpur - Morena Section (including chambal bridge) NS-1/RJ-MP/1
km 51 to km 61
Madhya Pradesh [1]/Rajasthan [9]
NHAI

3 10.325 Under Implementation PNC-TRG (JV)
Indian

38
MP/RAJ border to Sarai Cholla (NS/6)
km 61 - km 70
Madhya Pradesh
NHAI

3 9 Completed Dinesh Chandra R. Agarwal
Indian

39
Sarai Cholla to Morena (NS-20/MP)
Km.70.00 to Km. 85.00
Madhya Pradesh
NHAI

3 15 Completed Prakash Mahavir (JV)
Indian

40
Morena - Rairu (Start of Gwalior bypass) (NS-21/MP)
Km.85.00 to Km. 103.00
Madhya Pradesh
NHAI

3 18 Completed Backbone Projects
Indian

41
Gwalior Bypass (NS-1/BOT/MP-1)
Km 0 to Km 42.033
Madhya Pradesh
Annuity

75, 3 42 Completed Ramky - Era - Shriram Consortium
Indian

42
Gwalior - Jhansi
Km 16 to Km 96.127
Madhya Pradesh[68.5]/Uttar Pradesh[11.5]
Annuity

75 80 Under Implementation DSC - Apollo consortium
Indian - UK JV

43
Jhansi to Lalitpur (NS-1/BOT/UP-2)
Km 0 to Km 49.79
Uttar Pradesh
Annuity

25, 26 49.79 Under Implementation Gayatri - IDFC Consortium
Indian

44
Jhansi to Lalitpur (NS-1/BOT/UP-3)
Km 49.7 to Km 99
Uttar Pradesh
Annuity

26 49.3 Completed Gayatri - IDFC Consortium
Indian

45
Lalitpur Sagar (ADB-II/C-3)
Km 94 to km 132
Uttar Pradesh
ADB

26 38 Completed Nagarjuna Construction Co. Ltd.
Indian

46
Lalitpur - Sagar (ADB-II/C-4)
Km 132 to Km 187
Madhya Pradesh
ADB

26 55 Completed IJM Corporation
Malaysian

47
Sagar Bypass (ADB-II/C-5)
km 187 to km 211
Madhya Pradesh
ADB

26 26 Completed Ssangyong Engineering Const co.
South Korean

48
Sagar -Rajmarg Choraha (ADB-II/C-6)
km 211 to km 255
Madhya Pradesh
ADB

26 44 Completed Ssangyong Engineering Const co.
South korean

49
Sagar Rajmarg choraha (ADB-II/C-7)
km 255 to km 297
Madhya Pradesh
ADB

26 43.16 Under Implementation B. Seenaih & Co. (P) Ltd.
Indian

50
Rajmarg Choraha to Lahknadon (ADB-II/C-8)
km 297 to km 351(Junction with Km 544 of NH7
Madhya Pradesh
ADB

26 54 Completed Ssangyong Engineering Const co.
South Korean

51
Rajmarg Choraha to Lakhandon (ADB-II/C-9)
km 351 to 405.7
Madhya Pradesh
ADB

26 54.7 Completed Ssangyong Engineering Const co.
South Korean

52
Lakhnadon to MP/MH Border (NS-1/BOT/MP-3)
km 596.75 to km 653.225
Madhya Pradesh
Annuity

7 27.73 Under Implementation Sadbhav - SREI (JV)
Indian

53
Lakhnadon to MP/MH Border (NS-1/BOT/MP-2)
km 547.4 to km 596.75
Madhya Pradesh
Annuity

7 40.11 Under Implementation Navabharat - Ferro Alloys Ltd.(Malaxmi Higyways pvt. Ltd.)
Indian

54
Four laning from MP/Maharashtra border to Nagpur I/C Kamptee Kanoon and Nagpur bypass
km 689 to km 723
Maharashtra
BOT

7 95 Under Implementation Oriental Structural Engineers Ltd.
Indian

55
Six lanning of Vadakkancherry - Thrissure section
Km 240 to km 270
Kerala
BOT

47 30 Under Implementation KMC Construction Ltd.- CR18G Consortium
Indian-china

56
Nagpur- Chinchbhuvan
km 0.00 - km 9.200
Maharashtra
MORTH

7 9.2 Completed

57
Chinchbguvan-Butibori - Borkhedi (NS-7)
km 9.2 - km 22.85 & km 24.65 - km 36.6
Maharashtra
NHAI

7 25.6 Completed Oriental Structural Engineers Pvt. Ltd.
Indian

58
Butibori ROB(NS-29/MH)
Km 22.850 to Km 24.650
Maharashtra
NHAI

7 1.8 Completed JSR Construction Pvt. Ltd.
Indian

59
Borkhedi-Jam (NS-22/MH)
km 36.6 - km 64.0
Maharashtra
NHAI

7 27 Under Implementation JSR Construction Pvt. Ltd.- Ketan Construction Limited
Indian

60
Jam-Wadner (NS-59/MH)
Km. 64 to Km. 94
Maharashtra
NHAI

7 30 Completed Ideal Road Builders Pvt. Ltd.
Indian

61
Wadner-Devdhari (NS-60/MH)
Km. 94 to Km. 123
Maharashtra
NHAI

7 29 Contract Terminiated

62
Devdhari-Kelapur (NS-61/MH)
Km. 123 to Km. 153
Maharashtra
NHAI

7 30 Completed Ideal Road Builders Pvt. Ltd.
Indian

63
Kelapur-Pimpalkhatti (NS-62)
Km. 153 to Km. 175
Maharashtra
NHAI

7 22 Contract Terminiated

64
Islam Nagar to Kadtal (NS-2/BOT/AP-7)
Km 230 to Km 278
Telangana
Annuity

7 53.01 Completed Patel - KNR (JV)
Indian

65
MH/AP border to Islam Nagar (NS-2/BOT/AP-6)
Km 175 to Km 230
Telangana
Annuity

7 54.6 Completed SOMA - Avinash Consortium
Indian

66
Armur to Kadloor Yellareddy (NS-2/AP-1) (Approved Length 60.25)
Km 308 to Km 367
Telangana
BOT

7 59 Completed Navayuga KPCL Consortium
Indian

67
Kadloor Yellareddy to Gundla Pochampalli (NS-2/BOT/AP-2)
Km 367 to Km 447
Telangana
Annuity

7 85.74 Completed GMR Infrastructure ltd - GMR Energy Ltd. Consortium
Indian

68
Kadal to Armur (NS-2/BOT/AP-8)
Km 278 to Km 308
Telangana
Annuity

7 31 Completed Hindustan Construction Company Ltd.
Indian

69
Kalkallu village to Gundla Pochampali (NS-8)
km 447 - km 464
Andhra Pradesh
NHAI

7 17 Completed A. L. Sudershan & Co.
Indian

70
Gundla Pochampalli to Bowenpalli Shivarampalli to Thondapalli (NS-23/AP)
km 464.00 - km 474.00 & km 9.40 - km 22.30
Andhra Pradesh
NHAI

7 22.9 Under Implementation M.B Patel Construction Ltd.
Indian

71
Bowenpalli (Hyderabad city) to Shivarampalli
km 0.00 - km 9.200
Andhra Pradesh
MORTH

7 9.2 Completed

72
Thondapalli to Farukhanagar (NS/9)
km 22.3 - km 34.8
Andhra Pradesh
NHAI

7 12.5 Completed Maharia Re-surfacing
Indian

73
Farukhanagar to Kottakata (NS-2/AP-3)
Km. 34.140 to km 80.050
Telangana
BOT

7 46.16 Completed GMR Energy Ltd. & GMR Infrastruture Ltd. Consortium (GMR Jadcherla Expressways Pvt. Ltd.)
Indian

74
Farukhanagar to Kotakatta (NS-2/AP-4)
Km 80.050 to km 135.469
Telangana
BOT

7 55.74 Completed Larsen & Toubro Ltd. (L & T Western Andhra Tollways Pvt. Ltd.)
Indian

75
Hyderabad Bangalore section (NS-2/BOT/AP-5)
Km 135.469 to Km 211
Telangana
Annuity

7 74.65 Completed IL & FS CTNL Consortium (Andhra Pradesh Expressway Ltd.)
Indian

76
Hyderabad Bangalore section (ADB-11/C-10)
Km 211 to Km 251
Andhra Pradesh
ADB

7 40.35 Completed CGGC - SOMA (JV)
China - Indian JV

77
Hyderabad Bangalore section (ADB-11/C-11)
Km 251 to Km 293.4
Andhra Pradesh
ADB

7 41.35 Completed CGGC - SOMA (JV)
China - Indian JV

78
Hyderabad Bangalore section (ADB-11/C-12)
Km 293.4 to Km 336
Andhra Pradesh
ADB

7 42.88 Completed Continental Engg. Corporation
Taiwan

79
AP/Karnatka border- Nandi Hill crossing & Devenhalli to Meenu Kunte Village
Km 463.6 to Km 527 & km 535- km 539
Karnataka
Annuity

7 61.38 Completed Patel - KNR Infrasturture Pvt. Ltd. (JV)
Indian

80
Hyderabad Bangalore section (ADB-11/C-13)
Km 336 to Km 376
Andhra Pradesh
ADB

7 40 Completed Continental Engg. Corporation
Taiwan

81
Avathi village to Nandi Hills cross & Six laning of Devanhalli - Meenukunte (NS-10)
km 524 - km 527 & km 535 - km 539
Karnataka
NHAI

7 7 Completed Bhageeratha Engg. Ltd.
Indian

82
Hyderabad Bangalore section (ADB-11/C-14)
Km 376 to Km 418
Andhra Pradesh
ADB

7 42 Completed CGGC - SOMA (JV)
China - Indian JV

83
Nandi Hills Cross to Devanhalli & Six laning of Meenukunte to Habbal (NS-24/KN)
km 539 - 556 & km 527 - km 535
Karnataka
NHAI

7 25 Completed Afcon Infrastructure Ltd.
Indian

84
Habbal km 0.00 to Banglore city ring road km 8.00 (city area) & city area 8.00 to 33.015
km 0 - km 33
Karnataka

7 33 Completed MOSRTH

85
Hyderabad Bangalore section (ADB-11/C-15)(Approved length 45.6)
Km 418 to Km 463.6
Andhra Pradesh
ADB

7 45.05 Completed CGGC - SOMA (JV)
China - Indian JV

86
Hathipali - Hosur
km 33.015 - km 48.6 Common with GQ
Tamil Nadu
NHAI

7 15.6 Completed Patel Engineering
Indian

87
Hosur - Krishnagiri
km 48.6 - km 94.0
Tamil Nadu
NHAI

7 45.4 Completed Shakti Kumar M. Sancheti Ltd. & Bhola Singh Jaya Prakash (JV)
Indian

88
Krishnagiri to Thopurghat (NS-2/TN1)
Km. 94.000 to 156
Tamil Nadu
BOT

7 62.5 Completed Larsen & Toubro Ltd. (M/S L & T Krishnagiri Thopurghat Toll Road Pvt. Ltd.)
Indian

89
Thopurghar section (NS/14)
km 156 - km 163.4
Tamil Nadu
NHAI

7 7.4 Completed P.T. Sumber Mitra Jaya
Indonesian

90
Thopurghat to Thumpipadi (NS-25/TN)
Km.163.40 to Km. 180.00
Tamil Nadu
NHAI

7 16.6 Completed JSR Construction Pvt. Ltd.
Indian

91
Thumpipadi to Salem (NS-26/TN)
Km.180.00 to Km. 199.20
Tamil Nadu
NHAI

7 19.2 Completed Bhageeratha Engg. Ltd.
Indian

92
Salem bypass (NS/12)
km 199.2 - km 207.6
Tamil Nadu
NHAI

7 8.4 Completed Sri Ranganathar & Co.
Indian

93
Salem to Karur (NS-2/TN-2)
Km. 207.050 to Km 248.625
Tamil Nadu
BOT

7 41.55 Completed MVR - MRK - JTEC (JV) [MVR infrastructure & Tollway Pvt Ltd.]
Indian - China JV

94
Salem to Karur (NS-2/TN-3)
Km 258.645 to Km 292.6
Tamil Nadu
BOT

7 33.48 Completed Reliance Energy Ltd. [NK Toll Road Ltd.]
Indian

95
Bangalore - Salem - Madurai (NS-27/TN)
km 248.0 - km 259.6
Tamil Nadu
NHAI

7 8.4 Completed Vijay Engineering Enterprises
Indian

96
4 laning of Karur Bypass including additional bridge across river Amarawati

Tamil Nadu
NHAI

7 9.36 Completed Bhageeratha Engg. Ltd. - Techni Bharti (JV)
Indian

97
Construction of Karur ROB

Tamil Nadu
NHAI

7 0.84 Completed P.T. Sumber Mitra & Jaya and Punj Lloyd
Indonesian - Indian JV

98
Karur to Madurai (TN-4)
Km 305.6 to Km 373.275
Tamil Nadu
BOT

7 68.13 Completed Madhucon Projects Ltd. - SREI [TN(DK) Expressways Ltd.]
Indian

99
Karur to Madurai (TN-5)
Km 373.275 to km 426.6
Tamil Nadu
BOT

7 53.03 Completed Reliance Energy Ltd. [DS Toll Road Ltd.]
Indian

100
Salem to Kerala Border Section (TN-6)
Km 203.96 on NH-7 to km 53.00 on NH-47
Tamil Nadu
BOT

47 53.54 Completed IVRCL Infrastructure Projects Ltd. ( Salem Tollways Ltd.)
Indian

101
Salem to Kerala Border Section (TN-7)
Km 53.000 to Km 100
Tamil Nadu
BOT

47 48.51 Completed IVRCL Infrastructure Projects Ltd. (Kumar Palayam Tollway Ltd.)
Indian

102
Madurai to km 120 of Madurai - Tirunelveli Section including Madurai Bypass (NS-39)
Km. 0.000 to Km. 42.000
Tamil Nadu
NHAI

7 42 Completed Patel - KNR (JV)
Indian

103
Madurai-Kanniakumari Section (NS-40/TN)
Km. 42.000 to Km. 80.000
Tamil Nadu
NHAI

7 38.86 Completed IVRCL Infrastructure Projects Ltd.
Indian

104
Madurai-Kanniakumari Section(NS-41/TN)
Km. 80.00 to Km. 120.00
Tamil Nadu
NHAI

7 39.23 Completed IVRCL Infrastructure Projects Ltd.
Indian

105
Madurai-Kanniakumari Section (NS-42/TN)
Km. 120 to Km. 160
Tamil Nadu
NHAI

7 42.7 Completed Shakti Kumar M. Sancheti Ltd.
Indian

106
km 120 of Madurai - Tirunelveli Section to Panagudi (km 203) (NS-43)
Km. 160 to Km. 203
Tamil Nadu
NHAI

7 43 Completed Patel - KNR (JV)
Indian

107
Kanniyakumari-Panagudi(NS-32)
km 203 to km 233.6
Tamil Nadu
NHAI

7 31.7 Completed Patel - KNR (JV)
Indian

108
Chengapalli to Coimbatore Bypass and End of Coimbatore Bypass to TN/Kerala Border
Km 102.035 to Km 144.740 and Km170.940 to Km 183.060
Tamil Nadu
BOT

47 54.83 Under Implementation IVRCL Infrastructure & Projects Ltd
Indian

109
Salem to km 100 & Salem - Coimbatore - Kerala Border Section
Km. 100 to Km. 182
Tamil Nadu

47 27.37 Balance for award

110
Four lanning of Walayar - Vadakkancherry section
Km. 182.250 to Km. 240.000
Kerala
BOT

47 53.49 Under Implementation KNR Constructions Ltd.
Indian

111
Thrissur to Angamali (KL-I)
Km. 270.000 to Km. 316.70
Kerala
BOT

47 40 Completed KMC Construction Ltd. - SREI (JV) [Guruvayoor Infrastructure Pvt. Ltd.]
Indian

112
Angamali to Aluva (NS-28/KL)
Km.332.6 to Km.316.70
Kerala
NHAI

47 16.6 Completed Tantia - Techni Bharti (JV)
Indian

113
Thrissur - Kochi Section
km 332.0 - km 349.0
Kerala
MORTH

47 17 Completed