Chainage Chart of Corridor North-South
Status : 31st May 2014

S.NO
Stretch
State
Funded By

NH Length
(Km)

Present Status

Contractor & Nationality
North-South Corridor

1
Srinagar Bypass (Road Portion)(NS-30)
Km 286 to km 303.8
Jammu Kashmir
NHAI

1A 17.8 Completed Prakash Builders Associates Infrastructure Ltd.
Indian

2
Srinagar Bypass (Bridge Portion) (NS-30A)
km. 286 to km 303.8
Jammu Kashmir
NHAI

1A 1.23 Completed Valecha Engineering Ltd.
Indian

3
Udhampur-Ramban

Jammu Kashmir

1A 43 Balance for award

4
Quazigund-Banihal
Km.220 to Km.188
Jammu Kashmir
Annuity

1A 15.25 Under Implementation Navyuga Engineering Co. Ltd.
Indian

5
Srinagar to Banihal

Jammu Kashmir
Annuity

1A 67.76 Under Implementation Ramkey Infra and JPTEG
Indian-China (JV)

6
Ramban to Banihal

Jammu Kashmir

1A 36 Balance for award

7
Chenani-Nashri

Jammu Kashmir
Annuity

1A 12 Under Implementation IL & FS Transportation Networks Ltd
Indian

8
Jammu - Udhampur
Km. 27.5 to Km. 67
Jammu Kashmir
Annuity

1A 65 Under Implementation Shaboorji & Palonji Co. Ltd.
Indian

9
Jammu to Kunjwani (Jammu Bypass) NS-33/J&K
Km 0.00 to Km 15
Jammu Kashmir
NHAI

1A 14.7 Completed M. Venkata Rao Engineering
Indian

10
Kunjwani to Vijaypur (NS-15/J&K)
km 97 - km 80
Jammu Kashmir
NHAI

1A 17.2 Completed Border Road Organization
Indian

11
Vijaypur to Pathankot (NS-34/J&K)
Km 16.35 to km 50.00
Jammu Kashmir
NHAI

1A 33.65 Completed ITD Cementation (I) Ltd.
Indian

12
Vijaypur to Pathankot (NS-35/J&K)
Km 50 to Km 80
Jammu Kashmir
NHAI

1A 30 Under Implementation ITD Cementation (I) Ltd.
Indian

13
Pathankot to Jammu & Kashmir Border (NS-36/J&K)
Km 110.45 to Km 117.6 & Km. 4.0 to Km. 16.5
Punjab
NHAI

1A 19.65 Under Implementation M. Venkata Rao Engineering
Indian

14
Pathankot to Bhogpur (NS-37/PB)
Km 70 to Km 110
Punjab[29]/Himanchal Pradesh[11]
NHAI

1A 40 Completed ITD Cementation (I) Ltd.
Indian

15
Pathankot to Bhogpur (NS-38/PB)
Km 26 to Km 70
Punjab
NHAI

1A 44 Completed IVRCL Infrastructure Ltd
Indian

16
Phagwara Junction on NH-1
(Flyover on existing 4-lane road)
Punjab
NHAI

1 1 Completed Valecha Engineering Ltd.
Indian

17
Bhogpur to Jalandhar (NS-16/PB)
km 26 - km 4.23
Punjab
NHAI

1A 21.77 Completed Bumi Highway
Malaysian

18
Jalandhar Bypass (NS/1)
km 387.1 of NH-1-km 4.23 of NH -1A-km 372.7 of NH 1)
Punjab
NHAI

1 14.4 Completed Birla GTM Interpose Ltd.
Indian

19
Jalandhar-Ambala
km 372.7 - km 212
Punjab
WB

1 160.7 Completed

20
Ambala-Panipat
km 212 - km 96
Haryana
WB

1 116 Completed

21
Panipat Elevated Highway (Six lane)
Km 96.00 to 86.00
Haryana
BOT

1 10 Completed Larsen & Toubro Ltd.
Indian

22
Panipat to Panchi Gujran (Six laning work) (NS-89/HR)
Km 86.00 Km 66.00
Haryana
NHAI

1 20 Completed IRCON International Ltd.
Indian

23
Six laning of Panchi Gujran to Kamaspur (Sonepat) (NS-17/HR)
Km 66.00 to Km 44.30
Haryana
NHAI

1 21.7 Completed Valecha Engineering ltd.
Indian

24
Six laning of Kamaspur to Haryana / Delhi Border (NS/2)
km 44.3 - km 29.3
Haryana
NHAI

1 15 Completed Nagarjuna Construction Co. Ltd.
Indian

25
Eight laning of Haryana/ Delhi Border to Mukaraba Chowk (NS-18/DL)
Km 29.3 to Km 16.5
Delhi
NHAI

1 12.9 Completed Kundu-MG(JV)
Indian

26
Eight Laning of Mukarba Chowk to Mall Road (Delhi)(NS3/DL)
km 16.2 - km 8.2
Delhi
NHAI

1 8.5 Completed Madhucon Projects Ltd.
Indian

27
Delhi - Agra
km 0 to km 199.8
Delhi[12]/Haryana[74]/Uttar Pradesh[113.8]
ADB

2 199.8 Completed

28
New 4 laning Agra Bypass (NS-1/UP-1)
Km 176.8 of NH2 to Km 13.03 of NH-3
Uttar Pradesh
NHAI

2,3 32.8 Under Implementation PNC Infratech Ltd.
Indian

29
Agra - Raj/UP Border (NS-4)
km 8 - km 24
Uttar Pradesh
NHAI

3 16 Completed PNC Construction Co.
Indian

30
Raj/UP border to Mania (NS-19/UP/RJ)
km 24 - km 41
Uttar Pradesh[7]/Rajasthan[10]
NHAI

3 17 Completed PNC Construction Co.
Indian

31
Mania - Dholpur (NS/5)
km 41 - km 51
Rajasthan
NHAI

3 10 Completed Maheshwari Brothers Ltd.
Indian

32
Dholpur - Morena Section (including chambal bridge) NS-1/RJ-MP/1
km 51 to km 61
Madhya Pradesh [1]/Rajasthan [9]
NHAI

3 10 Under Implementation PNC-TRG (JV)
Indian

33
MP/RAJ border to Sarai Cholla (NS/6)
km 61 - km 70
Madhya Pradesh
NHAI

3 9 Completed Dinesh Chandra R. Agarwal
Indian

34
Sarai Cholla to Morena (NS-20/MP)
Km.70.00 to Km. 85.00
Madhya Pradesh
NHAI

3 15 Completed Prakash Mahavir (JV)
Indian

35
Morena - Rairu (Start of Gwalior bypass) (NS-21/MP)
Km.85.00 to Km. 103.00
Madhya Pradesh
NHAI

3 18 Completed Backbone Projects
Indian

36
Gwalior Bypass (NS-1/BOT/MP-1)
Km 0 to Km 42.033
Madhya Pradesh
Annuity

75, 3 42 Completed Ramky - Era - Shriram Consortium
Indian

37
Gwalior - Jhansi
Km 16 to Km 96.127
Madhya Pradesh[68.5]/Uttar Pradesh[11.5]
Annuity

75 80 Under Implementation DSC - Apollo consortium
Indian - UK JV

38
Jhansi to Lalitpur (NS-1/BOT/UP-2)
Km 0 to Km 49.79
Uttar Pradesh
Annuity

25, 26 49.7 Under Implementation Gayatri - IDFC Consortium
Indian

39
Jhansi to Lalitpur (NS-1/BOT/UP-3)
Km 49.7 to Km 99
Uttar Pradesh
Annuity

26 49.3 Completed Gayatri - IDFC Consortium
Indian

40
Lalitpur Sagar (ADB-II/C-3)
Km 94 to km 132
Uttar Pradesh
ADB

26 38 Completed Nagarjuna Construction Co. Ltd.
Indian

41
Lalitpur - Sagar (ADB-II/C-4)
Km 132 to Km 187
Madhya Pradesh
ADB

26 55 Completed IJM Corporation
Malaysian

42
Sagar Bypass (ADB-II/C-5)
km 187 to km 211
Madhya Pradesh
ADB

26 26 Completed Ssangyong Engineering Const co.
South Korean

43
Sagar -Rajmarg Choraha (ADB-II/C-6)
km 211 to km 255
Madhya Pradesh
ADB

26 44 Completed Ssangyong Engineering Const co.
South korean

44
Sagar Rajmarg choraha (ADB-II/C-7)
km 255 to km 297
Madhya Pradesh
ADB

26 43.16 Under Implementation B. Seenaih & Co. (P) Ltd.
Indian

45
Rajmarg Choraha to Lahknadon (ADB-II/C-8)
km 297 to km 351(Junction with Km 544 of NH7
Madhya Pradesh
ADB

26 54 Under Implementation Ssangyong Engineering Const co.
South Korean

46
Rajmarg Choraha to Lakhandon (ADB-II/C-9)
km 351 to 405.7
Madhya Pradesh
ADB

26 54.7 Completed Ssangyong Engineering Const co.
South Korean

47
Lakhnadon to MP/MH Border (NS-1/BOT/MP-3)
km 596.75 to km 653.225
Madhya Pradesh
Annuity

7 27.73 Under Implementation Sadbhav - SREI (JV)
Indian

48
Lakhnadon to MP/MH Border (NS-1/BOT/MP-2)
km 547.4 to km 596.75
Madhya Pradesh
Annuity

7 40.11 Under Implementation Navabharat - Ferro Alloys Ltd.(Malaxmi Higyways pvt. Ltd.)
Indian

49
Four laning from MP/Maharashtra border to Nagpur I/C Kamptee Kanoon and Nagpur bypass
km 689 to km 723
Maharashtra
BOT

7 95 Under Implementation Oriental Structural Engineers Ltd.
Indian

50
Six lanning of Vadakkancherry - Thrissuresection
Km 240 to km 270
Kerala
BOT

47 30 Under Implementation KMC Construction Ltd.- CR18G Consortium
Indian-china

51
Nagpur- Chinchbhuvan
km 0.00 - km 9.200
Maharashtra
MORTH

7 9.2 Completed

52
Chinchbguvan-Butibori - Borkhedi (NS-7)
km 9.2 - km 22.85 & km 24.65 - km 36.6
Maharashtra
NHAI

7 25.6 Completed Oriental Structural Engineers Pvt. Ltd.
Indian

53
Butibori ROB(NS-29/MH)
Km 22.850 to Km 24.650
Maharashtra
NHAI

7 1.8 Completed JSR Construction Pvt. Ltd.
Indian

54
Borkhedi-Jam (NS-22/MH)
km 36.6 - km 64.0
Maharashtra
NHAI

7 27.4 Under Implementation JSR Construction Pvt. Ltd.- Ketan Construction Limited
Indian

55
Jam-Wadner (NS-59/MH)
Km. 64 to Km. 94
Maharashtra
NHAI

7 30 Completed Ideal Road Builders Pvt. Ltd.
Indian

56
Wadner-Devdhari (NS-60/MH)
Km. 94 to Km. 123
Maharashtra
NHAI

7 29 Under Implementation Roman Tarmat Ltd.
Indian

57
Devdhari-Kelapur (NS-61/MH)
Km. 123 to Km. 153
Maharashtra
NHAI

7 30 Completed Ideal Road Builders Pvt. Ltd.
Indian

58
Kelapur-Pimpalkhatti (NS-62)
Km. 153 to Km. 175
Maharashtra
NHAI

7 22 Under Implementation Prasad-MKS Constro (JV)
Indian

59
Islam Nagar to Kadtal (NS-2/BOT/AP-7)
Km 230 to Km 278
Andhra Pradesh
Annuity

7 53.01 Completed Patel - KNR (JV)
Indian

60
MH/AP border to Islam Nagar (NS-2/BOT/AP-6)
Km 175 to Km 230
Andhra Pradesh
Annuity

7 54.6 Completed SOMA - Avinash Consortium
Indian

61
Armur to Kadloor Yellareddy (NS-2/AP-1) (Approved Length 60.25)
Km 308 to Km 367
Andhra Pradesh
BOT

7 59 Completed Navayuga KPCL Consortium
Indian

62
Kadloor Yellareddy to Gundla Pochampalli (NS-2/BOT/AP-2)
Km 367 to Km 447
Andhra Pradesh
Annuity

7 85.74 Completed GMR Infrastructure ltd - GMR Energy Ltd. Consortium
Indian

63
Kadal to Armur (NS-2/BOT/AP-8)
Km 278 to Km 308
Andhra Pradesh
Annuity

7 31 Completed Hindustan Construction Company Ltd.
Indian

64
Kalkallu village to Gundla Pochampali (NS-8)
km 447 - km 464
Andhra Pradesh
NHAI

7 17 Completed A. L. Sudershan & Co.
Indian

65
Gundla Pochampalli to Bowenpalli Shivarampalli to Thondapalli (NS-23/AP)
km 464.00 - km 474.00 & km 9.40 - km 22.30
Andhra Pradesh
NHAI

7 23.1 Contract Terminiated

66
Bowenpalli (Hyderabad city) to Shivarampalli
km 0.00 - km 9.200
Andhra Pradesh
MORTH

7 9.2 Completed

67
Thondapalli to Farukhanagar (NS/9)
km 22.3 - km 34.8
Andhra Pradesh
NHAI

7 12.5 Completed Maharia Re-surfacing
Indian

68
Farukhanagar to Kottakata (NS-2/AP-3)
Km. 34.140 to km 80.050
Andhra Pradesh
BOT

7 46.16 Completed GMR Energy Ltd. & GMR Infrastruture Ltd. Consortium (GMR Jadcherla Expressways Pvt. Ltd.)
Indian

69
Farukhanagar to Kotakatta (NS-2/AP-4)
Km 80.050 to km 135.469
Andhra Pradesh
BOT

7 55.74 Completed Larsen & Toubro Ltd. (L & T Western Andhra Tollways Pvt. Ltd.)
Indian

70
Hyderabad Bangalore section (NS-2/BOT/AP-5)
Km 135.469 to Km 211
Andhra Pradesh
Annuity

7 74.65 Completed IL & FS CTNL Consortium (Andhra Pradesh Expressway Ltd.)
Indian

71
Hyderabad Bangalore section (ADB-11/C-10)
Km 211 to Km 251
Andhra Pradesh
ADB

7 40.35 Completed CGGC - SOMA (JV)
China - Indian JV

72
Hyderabad Bangalore section (ADB-11/C-11)
Km 251 to Km 293.4
Andhra Pradesh
ADB

7 41.35 Completed CGGC - SOMA (JV)
China - Indian JV

73
Hyderabad Bangalore section (ADB-11/C-12)
Km 293.4 to Km 336
Andhra Pradesh
ADB

7 42.88 Completed Continental Engg. Corporation
Taiwan

74
AP/Karnatka border- Nandi Hill crossing & Devenhalli to Meenu Kunte Village
Km 463.6 to Km 527 & km 535- km 539
Karnataka
Annuity

7 61.38 Completed Patel - KNR Infrasturture Pvt. Ltd. (JV)
Indian

75
Hyderabad Bangalore section (ADB-11/C-13)
Km 336 to Km 376
Andhra Pradesh
ADB

7 40 Completed Continental Engg. Corporation
Taiwan

76
Avathi village to Nandi Hills cross & Six laning of Devanhalli - Meenukunte (NS-10)
km 524 - km 527 & km 535 - km 539
Karnataka
NHAI

7 7 Completed Bhageeratha Engg. Ltd.
Indian

77
Hyderabad Bangalore section (ADB-11/C-14)
Km 376 to Km 418
Andhra Pradesh
ADB

7 42 Completed CGGC - SOMA (JV)
China - Indian JV

78
Nandi Hills Cross to Devanhalli & Six laning of Meenukunte to Habbal (NS-24/KN)
km 539 - 556 & km 527 - km 535
Karnataka
NHAI

7 25 Completed Afcon Infrastructure Ltd.
Indian

79
Habbal km 0.00 to Banglore city ring road km 8.00 (city area) & city area 8.00 to 33.015
km 0 - km 33
Karnataka

7 33 Completed MOSRTH

80
Hyderabad Bangalore section (ADB-11/C-15)(Approved length 45.6)
Km 418 to Km 463.6
Andhra Pradesh
ADB

7 45.05 Completed CGGC - SOMA (JV)
China - Indian JV

81
Hathipali - Hosur
km 33.015 - km 48.6 Common with GQ
Tamil Nadu
NHAI

7 15.6 Completed Patel Engineering
Indian

82
Hosur - Krishnagiri
km 48.6 - km 94.0
Tamil Nadu
NHAI

7 45.4 Completed Shakti Kumar M. Sancheti Ltd. & Bhola Singh Jaya Prakash (JV)
Indian

83
Krishnagiri to Thopurghat (NS-2/TN1)
Km. 94.000 to 156
Tamil Nadu
BOT

7 62.5 Completed Larsen & Toubro Ltd. (M/S L & T Krishnagiri Thopurghat Toll Road Pvt. Ltd.)
Indian

84
Thopurghar section (NS/14)
km 156 - km 163.4
Tamil Nadu
NHAI

7 7.4 Completed P.T. Sumber Mitra Jaya
Indonesian

85
Thopurghat to Thumpipadi (NS-25/TN)
Km.163.40 to Km. 180.00
Tamil Nadu
NHAI

7 16.6 Completed JSR Construction Pvt. Ltd.
Indian

86
Thumpipadi to Salem (NS-26/TN)
Km.180.00 to Km. 199.20
Tamil Nadu
NHAI

7 19.2 Completed Bhageeratha Engg. Ltd.
Indian

87
Salem bypass (NS/12)
km 199.2 - km 207.6
Tamil Nadu
NHAI

7 8.4 Completed Sri Ranganathar & Co.
Indian

88
Salem to Karur (NS-2/TN-2)
Km. 207.050 to Km 248.625
Tamil Nadu
BOT

7 41.55 Completed MVR - MRK - JTEC (JV) [MVR infrastructure & Tollway Pvt Ltd.]
Indian - China JV

89
Salem to Karur (NS-2/TN-3)
Km 258.645 to Km 292.6
Tamil Nadu
BOT

7 33.48 Completed Reliance Energy Ltd. [NK Toll Road Ltd.]
Indian

90
Bangalore - Salem - Madurai (NS-27/TN)
km 248.0 - km 259.6
Tamil Nadu
NHAI

7 8.4 Completed Vijay Engineering Enterprises
Indian

91
4 laning of Karur Bypass including additional bridge across river Amarawati

Tamil Nadu
NHAI

7 9.36 Completed Bhageeratha Engg. Ltd. - Techni Bharti (JV)
Indian

92
Construction of Karur ROB

Tamil Nadu
NHAI

7 0.84 Completed P.T. Sumber Mitra & Jaya and Punj Lloyd
Indonesian - Indian JV

93
Karur to Madurai (TN-4)
Km 305.6 to Km 373.275
Tamil Nadu
BOT

7 68.13 Completed Madhucon Projects Ltd. - SREI [TN(DK) Expressways Ltd.]
Indian

94
Karur to Madurai (TN-5)
Km 373.275 to km 426.6
Tamil Nadu
BOT

7 53.03 Completed Reliance Energy Ltd. [DS Toll Road Ltd.]
Indian

95
Salem to Kerala Border Section (TN-6)
Km 203.96 on NH-7 to km 53.00 on NH-47
Tamil Nadu
BOT

47 53.54 Completed IVRCL Infrastructure Projects Ltd. ( Salem Tollways Ltd.)
Indian

96
Salem to Kerala Border Section (TN-7)
Km 53.000 to Km 100
Tamil Nadu
BOT

47 48.51 Completed IVRCL Infrastructure Projects Ltd. (Kumar Palayam Tollway Ltd.)
Indian

97
Madurai to km 120 of Madurai - Tirunelveli Section including Madurai Bypass (NS-39)
Km. 0.000 to Km. 42.000
Tamil Nadu
NHAI

7 42 Completed Patel - KNR (JV)
Indian

98
Madurai-Kanniakumari Section (NS-40/TN)
Km. 42.000 to Km. 80.000
Tamil Nadu
NHAI

7 38.86 Completed IVRCL Infrastructure Projects Ltd.
Indian

99
Madurai-Kanniakumari Section(NS-41/TN)
Km. 80.00 to Km. 120.00
Tamil Nadu
NHAI

7 39.23 Completed IVRCL Infrastructure Projects Ltd.
Indian

100
Madurai-Kanniakumari Section (NS-42/TN)
Km. 120 to Km. 160
Tamil Nadu
NHAI

7 42.7 Completed Shakti Kumar M. Sancheti Ltd.
Indian

101
km 120 of Madurai - Tirunelveli Section to Panagudi (km 203) (NS-43)
Km. 160 to Km. 203
Tamil Nadu
NHAI

7 43 Completed Patel - KNR (JV)
Indian

102
Kanniyakumari-Panagudi(NS-32)
km 203 to km 233.6
Tamil Nadu
NHAI

7 31.7 Completed Patel - KNR (JV)
Indian

103
Chengapalli to Coimbatore Bypass and End of Coimbatore Bypass to TN/Kerala Border
Km 102.035 to Km 144.740 and Km170.940 to Km 183.060
Tamil Nadu
BOT

47 54.83 Under Implementation IVRCL Infrastructure & Projects Ltd
Indian

104
Salem to km 100 & Salem - Coimbatore - Kerala Border Section
Km. 100 to Km. 182
Tamil Nadu

47 27.37 Balance for award

105
Four lanning of Walayar - Vadakkancherry section
Km. 182.250 to Km. 240.000
Kerala
BOT

47 54 Under Implementation KNR Constructions Ltd.
Indian

106
Thrissur to Angamali (KL-I)
Km. 270.000 to Km. 316.70
Kerala
BOT

47 40 Completed KMC Construction Ltd. - SREI (JV) [Guruvayoor Infrastructure Pvt. Ltd.]
Indian

107
Angamali to Aluva (NS-28/KL)
Km.332.6 to Km.316.70
Kerala
NHAI

47 16.6 Completed Tantia - Techni Bharti (JV)
Indian

108
Thrissur - Kochi Section
km 332.0 - km 349.0
Kerala
MORTH

47 17 Completed