Status of Claims and Payments as on 16/02/2017
S. No. Name of the Company /Concessionaire /Contractor Date of receipt of Application in Format 'A' from the Contractor Date of Confirmation / Validation of the BG Amount by NHAI Date of Submission of Bank Guarantee by the Contractor Date of Sanction of the Amount by NHAI Amount Sanctioned
(Rs. in crore)
Date of Signing of Escrow Account Agreement by the Contractor Date of Release of Amount to the Escrow Account Remarks
1 2 3 4 5 6 7 8 9 10
1 IRB Ahmedabad Vadodara Super Express Tollway Private Limited /Six laning of Ahmedabad to Vadodara section of NH 8 from Km. 6.400 to Km. 108.700 (length 102.300) in the State of Gujarat and improvement of Ahmedabad Vadodara Expressway from Km. 0.000 to 93.302 in the State of Gujarat (Length – 93.302 Km.) under NHDP Phase V on Design Build Finance Operate Transfer (DBFOT) Toll basis 08.12.2016 15.12.2016 08.12.2016 15.12.2016 21.17 15.12.2016 19.12.2016
2 IRB GOA Tollway Private Limited /Design, Engineering, Finance, Construction, Operation and Maintenance of Four laning of Goa/Karnataka border to Panaji-Goa Section of NH-4A from Km. 84+000 to Km. 153+070 in the State of Goa under NHDP Phase III on Build, Operate and Transfer (BOT) Toll basis 08.12.2016 15.12.2016 08.12.2016 15.12.2016 248.50 16.12.2016 16.12.2016
3 IL&FS Engineering and Construction Company Ltd /Widening and strengthening of existing NH-37 from 2 lanes to 4 lanes Km.230.500 to Km.205.000 of Dharamtul to Jagiroad in Assam on East-West Corridor under Phase-II Programme of NHDP (Package No. EW-II, AS-19) 13.12.2016 Letter No.NHAI/11015/AS-19/17/2005/EW-I/76 dated 20.12.2016 issued to Contractor Awaited




4 Oriental Structure Engineers Pvt Ltd. KMC /Request from Oriental Structural Engineers Pvt Ltd – KMC Constructions Ltd (JV) Allahabad Bypass Project (Package ABP-3) 14.12.2016 Letter No. Arbitration/UP/ ABP-2&3/2010/ 92652 dated 20.12.2016 issued to Contractor Awaited




5 Oriental Structure Engineers Pvt Ltd. KMC /Request from Oriental Structural Engineers Pvt Ltd – KMC Constructions Ltd (JV) Allahabad Bypass Project (Package ABP-3) 14.12.2016 Letter No. Arbitration/UP/ABP-2&3/2010/92655 dated 20.12.2016 issued to Contractor Awaited




6 Oriental Structure Engineers Pvt Ltd. KMC /Request from Oriental Structural Engineers Pvt Ltd – KMC Constructions Ltd (JV) Allahabad Bypass Project (Package ABP-3) 14.12.2016 Letter No. Arbitration/UP/ABP-2&3/2010/92648 dated 20.12.2016 issued to Contractor Awaited




7 Oriental Structure Engineers Pvt Ltd. KMC /Request from Oriental Structural Engineers Pvt Ltd – KMCConstructions Ltd (JV) Allahabad Bypass Project (Package ABP-3) 14.12.2016 Letter No.Arbitration/UP/ABP-2&3/2010/92649 dated 20.12.2016 issued to Contractor Awaited




8 Oriental Structure Engineers Pvt Ltd. /Request from Oriental Structural Engineers Pvt Ltd Construction of New Four Lane Jhansi Bypass from km 90.300 to km 106.175 of NH-25 in the state of Uttar Pradesh Package EW-II (UP-3) 14.12.2016 NHAI/12018/ADB-IV/UP-3/ 2005/92681 dated 20.12.2016 issued to Contractor Awaited




9 Oriental Structure Engineers Pvt Ltd. /Request from Oriental Structural Engineers Pvt Ltd Construction of New Four Lane Jhansi Bypass from km 90.300 to km 106.175 of NH-25 in the state of Uttar Pradesh Package EW-II (UP-3) 14.12.2016 NHAI/12018/ADB-IV/UP-3/ 2005/92683 dated 20.12.2016 issued to Contractor Awaited




10 Oriental Structure Engineers Pvt Ltd. /Request from Oriental Structural Engineers Pvt Ltd Construction of New Four Lane Jhansi Bypass from km 90.300 to km 106.175 of NH-25 in the state of Uttar Pradesh Package EW-II (UP-3) 14.12.2016 NHAI/12018/ADB-IV/UP-3/ 2005/92684 dated 20.12.2016 issued to Contractor Awaited




11 Oriental Structure Engineers Pvt Ltd. /Request from Oriental Structural Engineers PvtLtd Rehabilitation and Upgrading of km 50.00 to km 90.300. of NH-25 to 4/lane configuration in the state of Madhya Pradesh Package EW-II/MP-UP-I 14.12.2016 Letter No. NHAI/BOT/11012/ NH-25/MP-UP-1/2016/92678 dated 20.12.2016 issued to Contractor Awaited




12 Oriental Structure Engineers Pvt Ltd. /Request from Oriental Structural Engineers Pvt Ltd Four Laning of Mathura Agra Section of NH-2 from km 148.33 to km 177.00 in the State of UP (Contract Package-1) 14.12.2016 NHAI/12018/ADB-IV/UP-3/ 2005/92682 dated 20.12.2016 issued to Contractor Awaited




13 OSE Oriental Gammon (JV) /Four Laning and Strengthening of the Existing Two-Lane Section between km 199.660 to km 250.500 on NH-2 (Construction Package –IA ) Contract Agreement No. GTRP/1 14.12.2016 Letter No. 11014/11/2001/ DRB/GM(WB)/ 92636 dated. 20.12.2016 issued to Contractor Awaited




14 OSE Oriental Gammon (JV) /Four Laning and Strengthening of NH-2 from km 180 to km 240 in the State of Bihar -Contract Package –VA (Contract No.TNHP-07) 14.12.2016 Letter No. 11016/7/2000/ Tech/VA/JH/ 92688 dated 20.12.2016 issued to Contractor Awaited




15 OSE Oriental Gammon (JV) /Four Laning and Strengthening of the Existing Two-Lane Section between km 199.660 to km 250.500 on NH-2 (Construction Package –IA ) Contract Agreement No. GTRP/1 14.12.2016 Letter No.11014/11/2001/ DRB/ GM(WB)/92641 dated 20.12.2016 issued to Concessioniare. Awaited




16 OSE Oriental Gammon (JV) /Four Laning and Strengthening of the Existing Two-Lane Section between km 199.660 to km 250.500 on NH-2 (Construction Package –IA ) Contract Agreement No. GTRP/1 14.12.2016 Letter No. 11014/11/2001 /DRB/ GM(WB)/92645 dated 20.12.2016 issued to Concessionaire Awaited




17 OSE Oriental Gammon (JV) /Four Laning and Strengthening of the Existing Two-Lane Section between km 199.660 to km 250.500 on NH-2 (Construction Package –IA ) Contract Agreement No. GTRP/1 14.12.2016 Letter No. 11014/11/2001 /DRB/ GM(WB)/92640 dated 20.12.2016 issued to Contractor Awaited




18 SSANGYONG OSE Oriental (JV) /Four Laning and Strengthening of NH-2 from km 140.00 to km 180.000 on NH-2 –Construction Package–IVDin Bihar (Contract Agreement No.TNHP-06) 14.12.2016 Letter No. NHAI/BH/DRB /IV-D/PIU-VNS/92680 dated 20.12.2016 issued to Contractor Awaited




19 SSANGYONG OSE Oriental (JV) /Four Laning and Strengtheningof NH-2 from km 140.00 to km 180.000 on NH-2 –Construction Package–IVD in Bihar (Contract Agreement No.TNHP-06) 14.12.2016 Letter No. NHAI/BH/ DRB/IV-D/PIU-VNS/92679 dated 20.12.2016 issued to Conctractor Awaited




20 Gayatri –ECI (JV) /Widening and Strengthening of existing Two-lane to Four Lane from km 93.000 to km 60.000 (Bijni-Assam/WB Border Section) on NH-31-C on East West Corridor in the State of Assam (Contract Package No.EW-II (AS-10) 14.12.2016 Letter No. NHAI/11015/As-10/ARB/2015/ EW-I/78 dated 20.12.2016 issued to Contractor Awaited




21 Gayatri –ECI (JV) /Four Laning of National Highway from Km.40.000 to Km 60.500 of Maibong to Lumding Section of NH-54 in Assam on East West Corridor under Phase-II Programme of NHDP Contract Package EW-II (AS-27) 14.12.2016 Letter No.NHAI/11015 /AS-27/2007/EW-I/77 dated 20.12.2016 issued to Contractor Awaited




22 Gayatri –ECI (JV) /Widening and Strengthening of existing Two-lane carriageway from km 93.000 to km 60.000 (Bijni-Assam/WB Border Section) on NH-31-C under East West Corridor in the State of Assam (Contract Package No.EW-II (AS-10) 14.12.2016 Letter No. NHAI/11015/AS-10/ARB/2015/ EW-I/79 dated 20.12.2016 issued to Contractor Awaited




23 AFCONS Infrastructure Limited (Shapoorji Palonji) /Widening of Four Lane and Rehabilitation of Two Lane carriageway of Poonamallee – Kancheepuram Section of NH-4 (Km 13.8 to km 70.2 (Contract Package No.RC-1) 14.12.2016 Letter No. NHAI/13012/4/98-PT /RC-I/538 dated 19.12.2016 issued to Contractor 11.01.2017 16.01.2017 14.91 11.01.2017 17.01.2017
24 AFCONS Infrastructure Limited (Shapoorji Palonji) /Four laning and Strengthening of Km.340-Km404 Haveri to Hubli Section of NH-4 in the State of Karnataka. 14.12.2016 Letter No NHAI/KNT/Afcon-April/2005/92612 dated 19.12.2016 issued to concessionaire. 11.01.2017 16.01.2017 92.40 11.01.2017 17.01.2017
25 AFCONS Infrastructure Limited (Shapoorji Palonji) /Six laning of Km. 527.000 to Km. 535.00 Km. 539.00 to KM. 556.00 of Hyderabad-Bangalore section of Nh-7 in the State of Karnataka. - Contract Package NS-24/KN 14.12.2016 Letter No. NHAI/KNT/Afcon-April/2015/92781 dated 22.12.2016 issued to Contractor 11.01.2017 16.01.2017 20.03 11.01.2017 17.01.2017
26 AFCONS Infrastructure Limited (Shapoorji Palonji) /Six laning of Km. 527.000 to Km. 535.00 Km. 539.00 to KM. 556.00 of Hyderabad-Bangalore section of Nh-7 in the State of Karnataka. - Contract Package NS-24/KN 14.12.2016 Letter No. NHAI/KNT/Afcon-April/2015/92783 dated 22.12.2016 issued to Contractor 11.01.2017 16.01.2017 3.09 11.01.2017 17.01.2017
27 AFCONS Infrastructure Limited (Shapoorji Palonji) /Six laning of Km. 527.000 to Km. 535.00 Km. 539.00 to KM. 556.00 of Hyderabad-Bangalore section of Nh-7 in the State of Karnataka. - Contract Package NS-24/KN 14.12.2016 Letter No. NHAI/KNT/Afcon-April/2015/92784 dated 22.12.2016 issued to Contractor 11.01.2017 16.01.2017 10.41 11.01.2017 17.01.2017
28 JOG – SHIRKE (JV) /Four Laning of SH-54 from 6.400 Km to 14.55 Km and Construction of Four lane Major Bridge across Panvel Creek (Belapur-GawanPhata) in Maharashtra State Package-II. 14.12.2016 Letter No. NHAI/Legal&Arbitration / Revival/2016/92689 dated 20.12.2016 issued to Contractor 24.01.2017 31.01.2017 24.79 24.01.2017 01.02.2017
29 Hindustan Construction Company Ltd. /Widening 4/6 Lanes and Strengthening of existing Two Lane Carriageway of NH-6 in the State of West Bengal from Kolaghat to Kharagpur (from km 72 to km 136) Contract Package WB-II) Claim No. 3,4&5. 14.12.2016 Letter No. NHAI/12014/FQ /2003/ SC/Tech/CGM /186/92685 dated 20.12.2016 issued to Contractor Awaited




30 Hindustan Construction Company Ltd. /Widening 4/6 Lanes and Strengthening of existing Two Lane Carriageway of NH-6 in the State of West Bengal from Kolaghat to Kharagpur (from 72 km to km 136) (Contract Package WB-II) claim-II 14.12.2016 Letter No. NHAI/12014 /FQ/2003/SC/ Tech/CGM/186/92675 dated 20.12.2016 issued to Contractor Awaited




31 Hindustan Construction Company Ltd. /Widening 4/6 Lanes and Strengthening of existing Two Lane Carriageway of NH-6 in the State of West Bengal from Kolaghat to Kharagpur (from 72 km to km 136) (Contract Package WB-II) Claim-III 14.12.2016 Letter No. NHAI/12014/ FQ/2003/SC/ Tech/CGM/186/92656 dated 20.12.2016 issued to Concessioniare Awaited




32 Hindustan Construction Company Ltd. /Widening 4/6 Lanes and Strengthening of existing Two Lane Carriageway of NH-6 in the State of West Bengal from Kolaghat to Kharagpur (from 72 km to km 136) (Contract Package WB-II) Claim No. 2 14.12.2016 Letter No. NHAI/12014/ FQ/2003/SC/ Tech/CGM/186/92654 dated 20.12.2016 issued to Contractor Awaited




33 Hindustan Construction Company Ltd. /Widening 4/6 Lanes and Strengthening of existing Two Lane Carriageway of NH-6 in the State of West Bengal from Kolaghat toKaharagpur (from 72 km to km 136) (Contract Package WB-II) Claim No.6 14.12.2016 Letter No. NHAI/12014/ FQ/2003/SC/ Tech/CGM/186/92695 dated 20.12.2016 issued to Contractor/Claim Rejected Case closed



Claim amount stands deposited with the Supreme Court. Contractor not eligible for 75% payment against Arbitral Award.
34 Hindustan Construction Company Ltd. /Lucknow-Muzaffarpur National Highway Project- 4 Laning from km 92+000 to km 135+000 of Lucknow-Ayodhyasection ofNH-28 in Uttar Pradesh, India Contract package : LMNHP-EWII-WB-3 14.12.2016 Letter No. NHAI/40020/2/-III /Tech-III/WB-4/DRB/92660 dated 20.12.2016 issued to Contractor Awaited




35 Hindustan Construction Company Ltd. /Lucknow-Muzaffarpur National Highway Project- 4 Laning from km 92+000 to km 135+000 of Lucknow-Ayodhya section of NH-28 in Uttar Pradesh, India Contract package : LMNHP-EWII-WB-3 14.12.2016 Letter No. NHAI/40020/2/-III/ Tech-III/WB-4/DRB/92662 dated 20.12.2016 issued to Contractor Awaited



36 Hindustan Construction Company Ltd. /Lucknow-Muzaffarpur National Highway Project- 4 Laning from km 135+000 to km 164+000 of Ayodhya-Gorakhpursection of NH-28 in Uttar Pradesh, India Contract package : LMNHP-EWII-WB-4 14.12.2016 Letter No. NHAI/40020/2/-III/ Tech-III/WB-4/DRB/92658 dated 20.12.2016 issued to Contractor Awaited




37 Hindustan Construction Company Ltd. /Lucknow-Muzaffarpur National Highway Project- 4 Laning from km 92.000 to 135.000 of Lucknow - Ayodhya section of NH-28 in Uttar Pradesh, India Contract package : LMNHP-EWII-WB-3 14.12.2016 Letter No. NHAI/Tech /LMNHP/WB-3/2016/92664 dated 20.12.2016 issued to Contractor Awaited




38 Hindustan Construction Company Ltd. /Construction of Chennai Bypass, Phase II, connecting NH-4 & NH-5 and Widening- of Chennai Bypass, Phase II, connecting NH-45 & NH-4 in Tamil Nadu Contract Package CBPII 14.12.2016 Letter No NHAI/12011/4 /CBP-II/2006/537 dated 19.12.2016 issued to Concessionaire Awaited




39 Hindustan Construction Company Ltd. /Construction of Chennai Bypass, Phase II, connecting NH-4 & NH-5 and Widening- of Chennai Bypass,Phase II, connecting NH-45 & NH-4 in Tamil Nadu Contract Package CBPII 14.12.2016 Letter No. NHAI/12011/4/ CBP-II/2006/539 dated 19.12.2016 issued to Contractor Awaited




40 Hindustan Construction Company Ltd. /Allahabad bypass - Construction of Road from Km 158 to Km 198 (except Ganga Bridge) Contract Package - ABP2 14.12.2016 Letter No. Arbitration /UP/ABP-2&3/2010/92674 dated 20.12.2016 issued to Contractor Awaited




41 Hindustan Construction Company Ltd. /Allahabad bypass - Construction of Road from Km 158 to Km 198 (except Ganga Bridge) Contract Package - ABP2 14.12.2016 Letter No. Arbitration/UP/ABP-2&3/2010/92673 dated 20.12.2016 issued to Contractor /Claim Rejected Case closed



Delhi High Court decided in favour of NHAI. Contractor not eligible for 75% payment against Arbitral Award.
42 Hindustan Construction Company Ltd. /Lucknow-Muzaffarpur National Highway Project- 4 Laning from km 9+000 to km 45+000 of Lucknow-Ayodhya section of NH-28 in Uttar Pradesh, India Contract package :LMNHP-EWII-WB-1 14.12.2016 Letter No. NHAI/Tech/LMNHP/WB-1/2016/92665 dated 20.12.2016 issued to Contractor Awaited




43 Hindustan Construction Company Ltd. /Lucknow-Muzaffarpur National Highway Project- 4 Laning from km 45+000 to km 92+000 of Lucknow-Ayodhya section of NH-28 in Uttar Pradesh, India Contract package : LMNHP-EWII-WB-2 14.12.2016 Letter No. NHAI/Tech/LMNHP/WB-2/2016/92666 dated 20.12.2016 issued to Contractor Awaited




44 Hindustan Construction Company Ltd. /Rehabilitation and Upgrading of Km 253.00 to Km 316.00 of NH-76 to 4-Iane configuration, in the state of Rajasthan ContractPackage EW-II-RJ-7 14.12.2016 Letter No NHAI /12018/ADB-IV/RJ-07/2005/386 dated 19.12.2016 issued to Concessionaire Awaited




45 Hindustan Construction Company Ltd. /Rehabilitation and Upgrading of Km 253.00 to Km 316.00 of NH-76 to 4-Iane configuration, in the state of Rajasthan Contract Package EW-II-RJ-7 14.12.2016 Letter No NHAI/12018/ADB-IV/RJ-07/2005/385 dated 19.12.2016 /Claim rejected Case closed



Delhi High Court decided in favour of NHAI. Contractor not eligible for 75% payment against Arbitral Award.
46 Hindustan Construction Company Ltd. /Lucknow Muzaffarpur National Highway Project- 4 Laning from km 92.000 to Km 135.000 of Lucknow - Ayodhya Section of NH-28 in Uttar Pradesh, India, Contract package : LMNHP-EWII-WB-3 14.12.2016 Letter No. NHAI/Tech/LMNHP/WB-3/2016/92667 dated 20.12.2016 issued to Contractor Awaited




47 Hindustan Construction Company Ltd. Developmentof adequate road connectivity to Paradip Port (Four Laning of Chadikhol - Paradip Km 0.00 to Km 77.00 Section of NH-5A) in Orrisa 14.12.2016 Amended letter No. NHAI/Legal&Arbitration/ Revival /2016/92690(Amended) dated 21.12.2016 issued to Contractor Awaited




48 Backborne Projects Ltd. /Four Laning km 85 to km 103 Section of NH-3 Agra Gwalior Section in the State of Madhya Pradesh – Contract Package No.NS-21/MP 14.12.2016 Revised Letter No. NHAI/30030/6/NS-21/2001-Tech/93070 dated 28.12.2016 issued to Contractor Awaited



Letter No. NHAI/30030 /6/NS-21/ 2001-Tech/ 92630 dated 20.12.2016 issued to Contractor
49 DS Toll Road Ltd. /Design Construction Development finance Operation and Maintenance of km 373.275 (Start of proposedflyover atDindigul Bypass) to km 426.6 (Samayanallore) on NH-7 in the State of Tamil Nadu on BOT basis. 14.12.2016 Letter No NHAI/Tech/NS-2/TN/Conc/2005/1265 dated 19.12.2016 issued to Concessionaire. Awaited




50 NK Toll Road Ltd. /Design, Construction, Development, Finance, operation and Maintenance of Km. 258/645 (of Namakkal Bypass) to Km. 292/6 (start of Karur Bypass) and (ii) Improvement, Operation and maintenance of Km. 248/645 (start of proposed flyover on Namakkal bypass) to Km. 258/645 (end of Namakkal bypass) on Nh-7 in the State of Tamil Nadu on BOT basis Contract Package NS-2/BOT/TN-3 16.12.2016 Letter No. NHAI/Tech/NS-2/BOT/TN-3/Conc./2005/982 dated 19.12.2016 issued to Contractor Awaited




51 Sunway Construction SDN BHD -Rehabilitation and Upgrading of km 104.00 to km 170.00 of NH-25 to 4/lane configuration in the State of Uttar Pradesh Package No.EW-II(UP-4) 19.12.2016 Letter No. NHAI/DGM(T)/sunway/UP-4/2016 dated 26.12.2016 issued to Contractor Awaited




52 BSCPL Infrastructure Ltd.-Construction of four laning of Jhansi-Lakhnadon Section from km 255 to km 297 (Upto end of Grade-separator at RajmargChauraha) on NH-26 in the state of Madhya Pradesh Package-ADB-II/C-7 – Payment due as per Arbitral Awards dated 23/03/2010 & 13/05/2015 23.12.2016 Letter No. NHAI/Tech/MP/AT/C-7/2015/93148 & letter No. NHAI/Tech/MP/AT/C-7/2015/93149 dated 29.12.2016 issued to Contractor Awaited




53 Hindustan Construction Company Ltd. /Lucknow-Muzaffarpur National Highway Project- 4 Laning from km92.000 to 135.000 of Lucknow-Ayodhya section of NH-28 in Uttar Pradesh Contract Package: LMNHP-EWII-WB-3 27.12.2016 Letter No. NHAI/Tech/LMNHP /WB-2/2016/93486 dated 06.01.2017 issued to Contractor Awaited




54 Unitech–NCC (JV) /Widening to 4/6 lanes and Upgrading of the existing 2-lane road including minor bridges (upto 30M), Service Roads and Auxiliary works in the state of Andhra Pradesh between km.2.8 (Visakhapatnam) Km .0) to Ichapuram (Km.233) Section of NH-5 Contract Package AP-3. 27.12.2016 Letter No. NHAI/2013/16/2000/Tech/CGM(E-1)/95 dated 02.01.2017 issued to Contractor Awaited




55 Navyuga Engineering Co. Ltd. /Widening to 4/6 lane and Upgrading the existing 2-lane road (Bridges over 30m Flyover and Road over bridges) in the state of Andhra Pradesh between Km.98 (Srikakulam) to Km.233 (Ichhapuram) of Vishakapatnam to Ichhapuram section of NH-5 (Contract Package AP-6) 27.12.2016 Letter No. NHAI/Tech/AP-6/Icha-Sri/Bridge Package/93219 dated 02.01.2017 issued to Contractor Awaited




56 Gammon India Ltd. /Widening and Strengthening Two-4-lane existing single/intermediate Carriageway of NH-57 section from km. 190.00 to km 230.00 (Forebisganj-Simarhi Section) in the State of Bihar on East West Corridor under NHDP Phase-II (Contract Package C-II/BR-3) 16.01.2017


Letter No. NHAI/EW-1/2/BR-03 /DRB/Arbitration/2014 /94034 dated 18.01.2017 issued to Contractor


Awaited






57 Gammon India Ltd. /Widening to 4/6 lanes and Strength4ening of existing 2-lane carriageway (Bridge, Flyovers & ROB) of NH-5 in the State of Orissa from km. 61.000 to km. 199.141 (Chandikole to Blaeswar) Contract Package No. OR-V 16.01.2017


Letter No. NHAI/12013/6/2005/Tech/CK-II/314 dated 19.01.2017 issued to contractor


Awaited






58 Supreme- MBL (JV) /Western Transport Corridor, Tumbkur- Haveri-NH 4 project - Rehabilitation and upgradation of Chitradurg Section [ km 189.00 to km 207.00] - Balance Works [Contract package No. WTC- PKG3/NH/Re-Bid] 15.02.2017









Total



435.30