Status of Claims and Payments as on 02/11/2017
S. No. Name of the Company /Concessionaire /Contractor Date of receipt of Application in Format 'A' from the Contractor Date of Confirmation / Validation of the BG Amount by NHAI Date of Submission of Bank Guarantee by the Contractor Date of Sanction of the Amount by NHAI Amount Sanctioned
(Rs. in crore)
Date of Signing of Escrow Account Agreement by the Contractor Date of Release of Amount to the Escrow Account Remarks
1 2 3 4 5 6 7 8 9 10
1 IRB Ahmedabad Vadodara Super Express Tollway Private Limited /Six laning of Ahmedabad to Vadodara section of NH 8 from Km. 6.400 to Km. 108.700 (length 102.300) in the State of Gujarat and improvement of Ahmedabad Vadodara Expressway from Km. 0.000 to 93.302 in the State of Gujarat (Length – 93.302 Km.) under NHDP Phase V on Design Build Finance Operate Transfer (DBFOT) Toll basis 08.12.2016 15.12.2016 08.12.2016 15.12.2016 21.17 15.12.2016 19.12.2016
2 IRB GOA Tollway Private Limited /Design, Engineering, Finance, Construction, Operation and Maintenance of Four laning of Goa/Karnataka border to Panaji-Goa Section of NH-4A from Km. 84+000 to Km. 153+070 in the State of Goa under NHDP Phase III on Build, Operate and Transfer (BOT) Toll basis 08.12.2016 15.12.2016 08.12.2016 15.12.2016 248.50 16.12.2016 16.12.2016
3 IL&FS Engineering and Construction Company Ltd /Widening and strengthening of existing NH-37 from 2 lanes to 4 lanes Km.230.500 to Km.205.000 of Dharamtul to Jagiroad in Assam on East-West Corridor under Phase-II Programme of NHDP (Package No. EW-II, AS-19) 13.12.2016 Letter No.NHAI/11015/AS-19/17/2005/EW-I/76 dated 20.12.2016 issued to Contractor Awaited




4 Oriental Structure Engineers Pvt Ltd. KMC /Request from Oriental Structural Engineers Pvt Ltd – KMC Constructions Ltd (JV) Allahabad Bypass Project (Package ABP-3)
(Award date: 27.04.2012)
14.12.2016 Letter No. Arbitration/UP/ ABP-2&3/2010/ 92652 dated 20.12.2016 issued to Contractor Awaited




5 Oriental Structure Engineers Pvt Ltd. KMC /Request from Oriental Structural Engineers Pvt Ltd – KMC Constructions Ltd (JV) Allahabad Bypass Project (Package ABP-3) 
(Award date: 07.11.2011)
14.12.2016 Letter No. Arbitration/UP/ABP-2&3/2010/92655 dated 20.12.2016 issued to Contractor 14.07.2017



Letter No. Arbitration /UP/ABP-2&3/ 2010/103820 dated 02/08/2017 issued to Contractor
6 Oriental Structure Engineers Pvt Ltd. KMC /Request from Oriental Structural Engineers Pvt Ltd – KMC Constructions Ltd (JV) Allahabad Bypass Project (Package ABP-3)
(Award date: 04.03.2016)
14.12.2016 Letter No. Arbitration/UP/ABP-2&3/2010/92648 dated 20.12.2016 issued to Contractor 14.07.2017




7 Oriental Structure Engineers Pvt Ltd. KMC /Request from Oriental Structural Engineers Pvt Ltd – KMCConstructions Ltd (JV) Allahabad Bypass Project (Package ABP-3)
(Award date: 25.04.2011)
14.12.2016 Letter No.Arbitration/UP/ABP-2&3/2010/92649 dated 20.12.2016 issued to Contractor Awaited




8 Oriental Structure Engineers Pvt Ltd. /Request from Oriental Structural Engineers Pvt Ltd Construction of New Four Lane Jhansi Bypass from km 90.300 to km 106.175 of NH-25 in the state of Uttar Pradesh Package EW-II (UP-3) 14.12.2016 NHAI/12018/ADB-IV/UP-3/ 2005/92681 dated 20.12.2016 issued to Contractor Awaited




9 Oriental Structure Engineers Pvt Ltd. /Request from Oriental Structural Engineers Pvt Ltd Construction of New Four Lane Jhansi Bypass from km 90.300 to km 106.175 of NH-25 in the state of Uttar Pradesh Package EW-II (UP-3) 14.12.2016 NHAI/12018/ADB-IV/UP-3/ 2005/92683 dated 20.12.2016 issued to Contractor Awaited




10 Oriental Structure Engineers Pvt Ltd. /Request from Oriental Structural Engineers Pvt Ltd Construction of New Four Lane Jhansi Bypass from km 90.300 to km 106.175 of NH-25 in the state of Uttar Pradesh Package EW-II (UP-3) 14.12.2016 NHAI/12018/ADB-IV/UP-3/ 2005/92684 dated 20.12.2016 issued to Contractor Awaited




11 Oriental Structure Engineers Pvt Ltd. /Request from Oriental Structural Engineers PvtLtd Rehabilitation and Upgrading of km 50.00 to km 90.300. of NH-25 to 4/lane configuration in the state of Madhya Pradesh Package EW-II/MP-UP-I 14.12.2016 Letter No. NHAI/BOT/11012/ NH-25/MP-UP-1/2016/92678 dated 20.12.2016 issued to Contractor Awaited




12 Oriental Structure Engineers Pvt Ltd. /Request from Oriental Structural Engineers Pvt Ltd Four Laning of Mathura Agra Section of NH-2 from km 148.33 to km 177.00 in the State of UP (Contract Package-1) 14.12.2016 NHAI/12018/ADB-IV/UP-3/ 2005/92682 dated 20.12.2016 issued to Contractor Awaited




13 OSE Oriental Gammon (JV) /Four Laning and Strengthening of the Existing Two-Lane Section between km 199.660 to km 250.500 on NH-2 (Construction Package –IA ) Contract Agreement No. GTRP/1 14.12.2016 Letter No. 11014/11/2001/ DRB/GM(WB)/ 92636 dated. 20.12.2016 issued to Contractor Awaited




14 OSE Oriental Gammon (JV) /Four Laning and Strengthening of NH-2 from km 180 to km 240 in the State of Bihar -Contract Package –VA (Contract No.TNHP-07) 14.12.2016 Letter No. 11016/7/2000/ Tech/VA/JH/ 92688 dated 20.12.2016 issued to Contractor Awaited




15 OSE Oriental Gammon (JV) /Four Laning and Strengthening of the Existing Two-Lane Section between km 199.660 to km 250.500 on NH-2 (Construction Package –IA ) Contract Agreement No. GTRP/1 14.12.2016 Letter No.11014/11/2001/ DRB/ GM(WB)/92641 dated 20.12.2016 issued to Concessioniare. Awaited




16 OSE Oriental Gammon (JV) /Four Laning and Strengthening of the Existing Two-Lane Section between km 199.660 to km 250.500 on NH-2 (Construction Package –IA ) Contract Agreement No. GTRP/1 14.12.2016 Letter No. 11014/11/2001 /DRB/ GM(WB)/92645 dated 20.12.2016 issued to Concessionaire Awaited




17 OSE Oriental Gammon (JV) /Four Laning and Strengthening of the Existing Two-Lane Section between km 199.660 to km 250.500 on NH-2 (Construction Package –IA ) Contract Agreement No. GTRP/1 14.12.2016 Letter No. 11014/11/2001 /DRB/ GM(WB)/92640 dated 20.12.2016 issued to Contractor Awaited




18 SSANGYONG OSE Oriental (JV) /Four Laning and Strengthening of NH-2 from km 140.00 to km 180.000 on NH-2 –Construction Package–IVDin Bihar (Contract Agreement No.TNHP-06) 14.12.2016 Letter No. NHAI/BH/DRB /IV-D/PIU-VNS/92680 dated 20.12.2016 issued to Contractor Awaited




19 SSANGYONG OSE Oriental (JV) /Four Laning and Strengtheningof NH-2 from km 140.00 to km 180.000 on NH-2 –Construction Package–IVD in Bihar (Contract Agreement No.TNHP-06) 14.12.2016 Letter No. NHAI/BH/ DRB/IV-D/PIU-VNS/92679 dated 20.12.2016 issued to Conctractor Awaited




20 Gayatri –ECI (JV) /Widening and Strengthening of existing Two-lane to Four Lane from km 93.000 to km 60.000 (Bijni-Assam/WB Border Section) on NH-31-C on East West Corridor in the State of Assam (Contract Package No.EW-II (AS-10) 14.12.2016 Letter No. NHAI/11015/As-10/ARB/2015/ EW-I/78 dated 20.12.2016 issued to Contractor Awaited




21 Gayatri –ECI (JV) /Four Laning of National Highway from Km.40.000 to Km 60.500 of Maibong to Lumding Section of NH-54 in Assam on East West Corridor under Phase-II Programme of NHDP Contract Package EW-II (AS-27) 14.12.2016 Letter No.NHAI/11015 /AS-27/2007/EW-I/77 dated 20.12.2016 issued to Contractor Awaited




22 Gayatri –ECI (JV) /Widening and Strengthening of existing Two-lane carriageway from km 93.000 to km 60.000 (Bijni-Assam/WB Border Section) on NH-31-C under East West Corridor in the State of Assam (Contract Package No.EW-II (AS-10) 14.12.2016 Letter No. NHAI/11015/AS-10/ARB/2015/ EW-I/79 dated 20.12.2016 issued to Contractor Awaited




23 AFCONS Infrastructure Limited (Shapoorji Palonji) /Widening of Four Lane and Rehabilitation of Two Lane carriageway of Poonamallee – Kancheepuram Section of NH-4 (Km 13.8 to km 70.2 (Contract Package No.RC-1) 14.12.2016 Letter No. NHAI/13012/4/98-PT /RC-I/538 dated 19.12.2016 issued to Contractor 11.01.2017 16.01.2017 14.91 11.01.2017 17.01.2017
24 AFCONS Infrastructure Limited (Shapoorji Palonji) /Four laning and Strengthening of Km.340-Km404 Haveri to Hubli Section of NH-4 in the State of Karnataka. 14.12.2016 Letter No NHAI/KNT/Afcon-April/2005/92612 dated 19.12.2016 issued to concessionaire. 11.01.2017 16.01.2017 92.40 11.01.2017 17.01.2017
25 AFCONS Infrastructure Limited (Shapoorji Palonji) /Six laning of Km. 527.000 to Km. 535.00 Km. 539.00 to KM. 556.00 of Hyderabad-Bangalore section of Nh-7 in the State of Karnataka. - Contract Package NS-24/KN 14.12.2016 Letter No. NHAI/KNT/Afcon-April/2015/92781 dated 22.12.2016 issued to Contractor 11.01.2017 16.01.2017 20.03 11.01.2017 17.01.2017
26 AFCONS Infrastructure Limited (Shapoorji Palonji) /Six laning of Km. 527.000 to Km. 535.00 Km. 539.00 to KM. 556.00 of Hyderabad-Bangalore section of Nh-7 in the State of Karnataka. - Contract Package NS-24/KN 14.12.2016 Letter No. NHAI/KNT/Afcon-April/2015/92783 dated 22.12.2016 issued to Contractor 11.01.2017 16.01.2017 3.09 11.01.2017 17.01.2017
27 AFCONS Infrastructure Limited (Shapoorji Palonji) /Six laning of Km. 527.000 to Km. 535.00 Km. 539.00 to KM. 556.00 of Hyderabad-Bangalore section of Nh-7 in the State of Karnataka. - Contract Package NS-24/KN 14.12.2016 Letter No. NHAI/KNT/Afcon-April/2015/92784 dated 22.12.2016 issued to Contractor 11.01.2017 16.01.2017 10.41 11.01.2017 17.01.2017
28 JOG – SHIRKE (JV) /Four Laning of SH-54 from 6.400 Km to 14.55 Km and Construction of Four lane Major Bridge across Panvel Creek (Belapur-GawanPhata) in Maharashtra State Package-II. 12.12.2016 Letter No. NHAI/Legal&Arbitration / Revival/2016/92689 dated 20.12.2016 issued to Contractor BG in F/o National Highways Authority of India on 19.01.2017

BG in F/o of Mumbai JNPT Port Road Company Limited on 23.02.2017
31.01.2017 24.79 19.01.2017 01.02.2017 BG Confirmation in the name of National Highways Authority of India on 30.01.2017. 

Amended BG Confirmation in the name of Mumbai JNPT Port Road Company Limited on 09.03.2017
29 Hindustan Construction Company Ltd. /Widening 4/6 Lanes and Strengthening of existing Two Lane Carriageway of NH-6 in the State of West Bengal from Kolaghat to Kharagpur (from km 72 to km 136) Contract Package WB-II) Claim No. 3,4&5. 14.12.2016 Letter No. NHAI/12014/FQ /2003/ SC/Tech/CGM /186/92685 dated 20.12.2016 issued to Contractor Case Closed




Claim amount stands deposited with the Supreme Court. Contractor not eligible for 75% Payment against Arbitral Award.
Letter No. NHAI/12014/FQ /2003/ SC/Tech/CGM /186/105752 dated 12.09.2017 issued to Contractor 
30 Hindustan Construction Company Ltd. /Widening 4/6 Lanes and Strengthening of existing Two Lane Carriageway of NH-6 in the State of West Bengal from Kolaghat to Kharagpur (from 72 km to km 136) (Contract Package WB-II) claim-II 14.12.2016 Letter No. NHAI/12014 /FQ/2003/SC/ Tech/CGM/186/92675 dated 20.12.2016 issued to Contractor Case Closed




Claim amount stands deposited with the Supreme Court. Contractor not eligible for 75% Payment against Arbitral Award.
Letter No. NHAI/12014/FQ /2003/ SC/Tech/CGM /186/105755 dated 12.09.2017 issued to Contractor
 
31 Hindustan Construction Company Ltd. /Widening 4/6 Lanes and Strengthening of existing Two Lane Carriageway of NH-6 in the State of West Bengal from Kolaghat to Kharagpur (from 72 km to km 136) (Contract Package WB-II) Claim-III 14.12.2016 Letter No. NHAI/12014/ FQ/2003/SC/ Tech/CGM/186/92656 dated 20.12.2016 issued to Concessioniare Case Closed



Proposal withdrawn by HCC vide Letter No. HCC/CONT/ARB/WBII/PA/288 dated 09.02.2017
32 Hindustan Construction Company Ltd. /Widening 4/6 Lanes and Strengthening of existing Two Lane Carriageway of NH-6 in the State of West Bengal from Kolaghat to Kharagpur (from 72 km to km 136) (Contract Package WB-II) Claim No. 2 14.12.2016 Letter No. NHAI/12014/ FQ/2003/SC/ Tech/CGM/186/92654 dated 20.12.2016 issued to Contractor Case Closed



NHAI PIU Kolkata relaesed the amount of Rs. 70,21,297/- on 13.02.2013. Nothing is admissible to HCC against the AT award. Letter No. NHAI/12014/FQ /2003/SC/Tech/CGM /186/105750 issued to Contractor.
33 Hindustan Construction Company Ltd. /Widening 4/6 Lanes and Strengthening of existing Two Lane Carriageway of NH-6 in the State of West Bengal from Kolaghat toKaharagpur (from 72 km to km 136) (Contract Package WB-II) Claim No.6 14.12.2016 Letter No. NHAI/12014/ FQ/2003/SC/ Tech/CGM/186/92695 dated 20.12.2016 issued to Contractor/Claim Rejected Case closed



Claim amount stands deposited with the Supreme Court. Contractor not eligible for 75% payment against Arbitral Award.
34 Hindustan Construction Company Ltd. /Lucknow- Muzaffarpur National Highways Projet-4-laning from Km 135.000 to Km 64.700 of Ayodhya to Gorakhpur Section of NH-28 in the Uttar Pradesh (Civil Construction package LMNHP-EW-II(WB)-4. Award dated:20.03.2015 14.12.2016 Letter No. NHAI/40020/2/-III /Tech-III/WB-4/DRB/92660 dated 20.12.2016 issued to Contractor Awaited




35 Hindustan Construction Company Ltd. /Lucknow-Muzaffarpur National Highways Projet-4-laning from Km 135.000 to Km 64.700 of Ayodhya to Gorakhpur Section of NH-28 in the Uttar Pradesh (Civil Construction package LMNHP-EW-II(WB)-4. Award dated:18.03.2016 14.12.2016 Letter No. NHAI/40020/2/-III/ Tech-III/WB-4/DRB/92662 dated 20.12.2016 issued to Contractor 17.03.2017 31.03.2017 87.79 23.03.2017 31.03.2017
36 Hindustan Construction Company Ltd. /Lucknow-Muzaffarpur National Highway Project- 4 Laning from km 135+000 to km 164+000 of Ayodhya-Gorakhpursection of NH-28 in Uttar Pradesh, India Contract package : LMNHP-EWII-WB-4 (Award Date 30.05.2015) 14.12.2016 Letter No. NHAI/40020/2/-III/ Tech-III/WB-4/DRB/92658 dated 20.12.2016 issued to Contractor 24.02.2017 21.03.2017 50.22 14.03.2017 21.03.2017 Letter No. NHAI/40020/2/C-III/ Tech-III/WB-4/DRB/95581 dated 23.02.2017 issued to Contractor
37 Hindustan Construction Company Ltd. /Lucknow-Muzaffarpur National Highway Project- 4 Laning from km 92.000 to 135.000 of Lucknow - Ayodhya section of NH-28 in Uttar Pradesh, India Contract package : LMNHP-EWII-WB-3  
(Award Date 22.07.2014)
14.12.2016 Letter No. NHAI/Tech /LMNHP/WB-3/2016/92664 dated 20.12.2016 issued to Contractor 29.03.2017 21.04.2017 13.09 29.03.2017 21.04.2017
38 Hindustan Construction Company Ltd. /Construction of Chennai Bypass, Phase II, connecting NH-4 & NH-5 and Widening- of Chennai Bypass, Phase II, connecting NH-45 & NH-4 in Tamil Nadu Contract Package CBPII 14.12.2016 Letter No NHAI/12011/4 /CBP-II/2006/537 dated 19.12.2016 issued to Concessionaire 20.02.2017
As per the decision of Hon'ble High Court, NHAI deposited AT amount including interest, amounting to Rs. 6.73 crore with Registrar General, High Court, Delhi.

Letter No NHAI/12011/4 /CBP-II/2006/600 dated 23.02.2017 issued to Concessionaire
39 Hindustan Construction Company Ltd. /Construction of Chennai Bypass, Phase II, connecting NH-4 & NH-5 and Widening- of Chennai Bypass,Phase II, connecting NH-45 & NH-4 in Tamil Nadu Contract Package CBPII 14.12.2016 Letter No. NHAI/12011/4/ CBP-II/2006/539 dated 19.12.2016 issued to Contractor Awaited




40 Hindustan Construction Company Ltd. /Allahabad bypass - Construction of Road from Km 158 to Km 198 (except Ganga Bridge) Contract Package - ABP2 14.12.2016 Letter No. Arbitration /UP/ABP-2&3/2010/92674 dated 20.12.2016 issued to Contractor 02.05.2017 24.05.2017 137.01 02.05.2017 24.05.2017
41 Hindustan Construction Company Ltd. /Allahabad bypass - Construction of Road from Km 158 to Km 198 (except Ganga Bridge) Contract Package - ABP2 14.12.2016 Letter No. Arbitration/UP/ABP-2&3/2010/92673 dated 20.12.2016 issued to Contractor /Claim Rejected Case closed



Delhi High Court decided in favour of NHAI. Contractor not eligible for 75% payment against Arbitral Award.
42 Hindustan Construction Company Ltd. /Lucknow-Muzaffarpur National Highway Project- 4 Laning from km 9+000 to km 45+000 of Lucknow-Ayodhya section of NH-28 in Uttar Pradesh, India Contract package :LMNHP-EWII-WB-1 (Award Date 28.05.2014) 14.12.2016 Letter No. NHAI/Tech/LMNHP/WB-1/2016/92665 dated 20.12.2016 issued to Contractor 20.02.2017 09.03.2017 10.38 01.03.2017 16.03.2017 Letter No. NHAI/Tech/LMNHP/WB-1/2016/95580 dated 23.02.2017 issued to Contractor
43 Hindustan Construction Company Ltd. /Lucknow-Muzaffarpur National Highway Project- 4 Laning from km 45+000 to km 92+000 of Lucknow-Ayodhya section of NH-28 in Uttar Pradesh, India Contract package : LMNHP-EWII-WB-2 (Award Date 13.06.2015) 14.12.2016 Letter No. NHAI/Tech/LMNHP/WB-2/2016/92666 dated 20.12.2016 issued to Contractor 30.03.2017 21.04.2017 32.49 30.03.2017 21.04.2017
44 Hindustan Construction Company Ltd. /Rehabilitation and Upgrading of Km 253.00 to Km 316.00 of NH-76 to 4-Iane configuration, in the state of Rajasthan ContractPackage EW-II-RJ-7 14.12.2016 Letter No NHAI /12018/ADB-IV/RJ-07/2005/386 dated 19.12.2016 issued to Concessionaire Awaited




45 Hindustan Construction Company Ltd. /Rehabilitation and Upgrading of Km 253.00 to Km 316.00 of NH-76 to 4-Iane configuration, in the state of Rajasthan Contract Package EW-II-RJ-7 14.12.2016 Letter No NHAI/12018/ADB-IV/RJ-07/2005/385 dated 19.12.2016 /Claim rejected Case closed



Delhi High Court decided in favour of NHAI. Contractor not eligible for 75% payment against Arbitral Award.
46 Hindustan Construction Company Ltd. /Lucknow Muzaffarpur National Highway Project- 4 Laning from km 92.000 to Km 135.000 of Lucknow - Ayodhya Section of NH-28 in Uttar Pradesh, India, Contract package : LMNHP-EWII-WB-3
(Award Date 30.11.2015)
14.12.2016 Letter No. NHAI/Tech/LMNHP/WB-3/2016/92667 dated 20.12.2016 issued to Contractor 29.03.2017 12.04.2017 114.10 29.03.2017 12.04.2017
47 Backborne Projects Ltd. /Four Laning km 85 to km 103 Section of NH-3 Agra Gwalior Section in the State of Madhya Pradesh – Contract Package No.NS-21/MP 14.12.2016 Revised Letter No. NHAI/30030/6/NS-21/2001-Tech/93070 dated 28.12.2016 issued to Contractor Awaited



Letter No. NHAI/30030 /6/NS-21/ 2001-Tech/ 92630 dated 20.12.2016 issued to Contractor
48 DS Toll Road Ltd. /Design Construction Development finance Operation and Maintenance of km 373.275 (Start of proposedflyover atDindigul Bypass) to km 426.6 (Samayanallore) on NH-7 in the State of Tamil Nadu on BOT basis. 14.12.2016 Letter No NHAI/Tech/NS-2/TN/Conc/2005/1265 dated 19.12.2016 issued to Concessionaire. Awaited




49 NK Toll Road Ltd. /Design, Construction, Development, Finance, operation and Maintenance of Km. 258/645 (of Namakkal Bypass) to Km. 292/6 (start of Karur Bypass) and (ii) Improvement, Operation and maintenance of Km. 248/645 (start of proposed flyover on Namakkal bypass) to Km. 258/645 (end of Namakkal bypass) on Nh-7 in the State of Tamil Nadu on BOT basis Contract Package NS-2/BOT/TN-3 16.12.2016 Letter No. NHAI/Tech/NS-2/BOT/TN-3/Conc./2005/982 dated 19.12.2016 issued to Contractor Awaited




50 Sunway Construction SDN BHD -Rehabilitation and Upgrading of km 104.00 to km 170.00 of NH-25 to 4/lane configuration in the State of Uttar Pradesh Package No.EW-II(UP-4) 19.12.2016 Letter No. NHAI/DGM(T)/sunway/UP-4/2016/92906 dated 26.12.2016 issued to Contractor Awaited




51 BSCPL Infrastructure Ltd.-Construction of four laning of Jhansi-Lakhnadon Section from km 255 to km 297 (Upto end of Grade-separator at RajmargChauraha) on NH-26 in the state of Madhya Pradesh Package-ADB-II/C-7 – Payment due as per Arbitral Awards dated 23/03/2010 & 13/05/2015 23.12.2016 Letter No. NHAI/Tech/MP/AT/C-7/2015/93148 & letter No. NHAI/Tech/MP/AT/C-7/2015/93149 dated 29.12.2016 issued to Contractor 09.04.2017 03.05.2017 49.40 19.04.2017 08.05.2017
52 Hindustan Construction Company Ltd. /Lucknow-Muzaffarpur National Highway Project- 4 Laning from km92.000 to 135.000 of Lucknow-Ayodhya section of NH-28 in Uttar Pradesh Contract Package: LMNHP-EWII-WB-3
(Award Date 14.10.2016)
27.12.2016 Letter No. NHAI/Tech/LMNHP /WB-2/2016/93486 dated 06.01.2017 issued to Contractor 04.04.2017 21.04.2017 72.17 04.04.2017 21.04.2017
53 Unitech–NCC (JV) /Widening to 4/6 lanes and Upgrading of the existing 2-lane road including minor bridges (upto 30M), Service Roads and Auxiliary works in the state of Andhra Pradesh between km.2.8 (Visakhapatnam) Km .0) to Ichapuram (Km.233) Section of NH-5 Contract Package AP-3. 27.12.2016 Letter No. NHAI/2013/16/2000/Tech/CGM(E-1)/95 dated 02.01.2017 issued to Contractor 13.03.2017 03.07.2017 21.47 04.07.2017 04.07.2017
Letter No. NHAI/2013 /16/2000/Tech/ GM(E-1)/299 dated 12.04.2017 issued to Contractor
54 Navyuga Engineering Co. Ltd. /Widening to 4/6 lane and Upgrading the existing 2-lane road (Bridges over 30m Flyover and Road over bridges) in the state of Andhra Pradesh between Km.98 (Srikakulam) to Km.233 (Ichhapuram) of Vishakapatnam to Ichhapuram section of NH-5 (Contract Package AP-6) 27.12.2016 Letter No. NHAI/Tech/AP-6/Icha-Sri/Bridge Package/93219 dated 02.01.2017 issued to Contractor Case Closed



High Court gave order on 16.12.2016 in favour of Contractor. Order was not challenged and payment was settled vide Supplementary Agreement dt. 02.02.2017.
55 Gammon India Ltd. /Widening and Strengthening Two-4-lane existing single/intermediate Carriageway of NH-57 section from km. 190.00 to km 230.00 (Forebisganj-Simarhi Section) in the State of Bihar on East West Corridor under NHDP Phase-II (Contract Package C-II/BR-3)
(Awarded Date: 31.03.2016 & Amended by AT on 17.05.2016)
16.01.2017


Letter No. NHAI/EW-1/2/BR-03 /DRB/Arbitration/2014 /94034 dated 18.01.2017 issued to Contractor


04.08.2017




31.08.2017



56 Gammon India Ltd. /Widening to 4/6 lanes and Strength4ening of existing 2-lane carriageway (Bridge, Flyovers & ROB) of NH-5 in the State of Orissa from km. 61.000 to km. 199.141 (Chandikole to Blaeswar) Contract Package No. OR-V 16.01.2017


Letter No. NHAI/12013/6/2005/Tech/CK-II/314 dated 19.01.2017 issued to contractor


Awaited






Letter No.NHAI/11011/19/RO/Od/1118/2017/100168 dated 22.05.2017 issued to Contractor
57 Supreme- MBL (JV) /Western Transport Corridor, Tumbkur- Haveri-NH 4 project - Rehabilitation and upgradation of Chitradurg Section [ km 189.00 to km 207.00] - Balance Works [Contract package No. WTC- PKG3/NH/Re-Bid] 15.02.2017


Letter No. NHAI/GM(MC-III)/Supreme/Essentiality/95352 dated 20.02.2017 issued to contractor

 

Awaited






58 Agrawal - JMC Joint Venture/Four laning and Strengthening of Existing Two lane National Highway No. NH 45B from Trichy Bypass end to Tovarankurchi (Km. 0+000 to KM. 60.950) in Tamil Nadu (Contract Package No. VII-A) (Award Date 29.03.2010) 02.03.2017

 

Letter No.11015/7/2001/ Tech/GM (WB-II)/1059 dated 06.03.2017 issued to Contractor

 

Awaited

59 Agrawal - JMC Joint Venture/Four laning and Strengthening of Existing Two lane National Highway No. NH 45B from Trichy Bypass end to Tovarankurchi (Km. 0+000 to KM. 60.950) in Tamil Nadu (Contract Package No. VII-A) (Award Date 30.04.2014) 02.03.2017

 

Letter No.11015/7/2001/ Tech/GM (WB-II)/1058 dated 06.03.2017 issued to Contractor

 

Awaited

60 Agrawal - JMC Joint Venture/Four laning and Strengthening of Existing Two lane National Highway No. NH 45B from  Tovarankurchi  to Madurai (Km. 60.950 to 124.840) in Tamil Nadu (Contract Package No. VII-B) (Award Date 29.03.2010) 02.03.2017

 

Letter No.11015/7/2001/ Tech/GM (WB-II)/1057 dated 06.03.2017 issued to Contractor

 

Awaited

61 Agrawal - JMC Joint Venture/Four laning and Strengthening of Existing Two lane National Highway No. NH 45B from  Tovarankurchi  to Madurai (Km. 60.950 to 124.840) in Tamil Nadu (Contract Package No. VII-B) (Award Date 30.04.2014) 02.03.2017

 

Letter No.11015/7/2001/ Tech/GM (WB-II)/1056 dated 06.03.2017 issued to Contractor

 

Awaited

62 M/s Atlanta Infra Assets Limited/Improvement, Operation & maintenance including Strengthening & Widening of existing 2-lane road to 4 lane dual carriageway from Km. 9.200 to Km. 50.00 section of NH-6 (Nagpur - Kondhali Section) in the state of Maharashtra on Build, Operate & Transfer (BOT) basis 08.03.2017

 

Letter No. NHAI/BOT/ 11023/ 20 /2008(pt) /96623 dated 15.03.2017 issued to Contractor

 

27.03.2017

 

08.04.2017

 

117.88

 

07.04.2017

 

11.04.2017

63 M/s Limak-SOMA (JV) / Contract Package - AP-18 - widening ot 4/6 lanes & strengthening of existing 2 lane carriageway of NH-5 in Vijayawada-Visakhapatnam section in the state of Andhra Pradesh form km. 80.000 to km. 164.500 (Gundugolanu near Eluru to Gowthami bridge) Date of Award: 01.03.2008. 22.03.2017

 

Letter No. NHAI/Tech/Gundu/CTE/2012/342 dated 28/04/2017 issued to Contractor

 

19.05.2017

 

REMINDER:
Letter No. NHAI/Tech/Gundu /CTE/2012 /456 dated 10.07.2017 issued to Contractor
Reminder-II dated 09.08.2017 also issued to Contractor

64 M/s Nirmal BOT Limited (Highway Concessions) / Design, Construction, Development, Finance, Operation and Maintenance of Km. 278.000 (Kadtal) to 308.000 (Armur) on NH-7 in the State of Andhra Pradesh under North - South Corridor (NHDP Phase-II) on Build, Operate and Transfer (Annuity) Basis - Arbitration Award dated 14.09.2016 01.05.2017

 

Letter No. NHAI /Tech /NS-2 /BOT /AP-8/ 1/2008 /100460 dated 26.05.2017 issued to Contractor.

 

Case closed

 

 

Since, the award is not in favour of the Concessionaire (M/s Nirmal BOT Limited), therefore, payment of 75% of Arbitral Award cannot be released by NHAI to the Concessionaire. Also, in any case, the payment cannot be released to any EPC Contractor of the Concessionaire.

65 M/s HCC / Lucknow-Muzaffarpur National Highway Project - 4 laning from km. 9+000 to Km. 45+000 of Lucknow-Ayodhya section of NH-28 in Uttar Pradesh, India, Contract Package : LMNHP-EWII-WB-1 - Arbitration Award dated 31.03.2017. 17.07.2017

 

Letter No. NHAI/CM/TP/Lko-Ayodhya/km107/ NH-28/Arbitral Award/2011/Part/ 103948 dated 04.08.2017 issued to Contractor

 

66 M/s HCC Ltd-Release of 75% of Arbitral Award amount as per decision of Government of India.
Development of Adequate Road Connectivity to Paradip Port (Four laning of Chandikhole-Paradip,Km.0.00 to Km 77.00 section of NH-5A) in Orrisa.
06.12.2016

 

 

BG in F/o National Highways Authority of India on 11.01.2017

Amended BG in F/o Paradip Port Road Company Limited on 02.05.2017
 

 

14.07.2017

 

 

43.34

 

 

07.02.2017

 

 

17.07.2017

BG Confirmation in the name of National Highways Authority of India on 07.04.2017 and 06.03.2017 by Export Import Bank of India, Barakhamba Road, New Delhi.

Amended BG Confirmation in the name of Paradip Port Road Company Limited on 09.06.2017 & 23.06.2017 by Export Import Bank of India, Barakhamba Road, New Delhi.

Amended BG Confirmation in the name of PPRCL on 23.06.2017 by Export Import Bank of India, Mumbai, Head Office.


Total



1184.65